Dear Sir,
Point wise reply to above observations is as :
1. We will be installing electrical evaporator to cater surplus treated water from STP ( left after dual plumbing & watering of green belt within the Project). Capacity of evaporator will be maximum, i.e., with respect to Monsoon season, i.e., 35 KLD. Undertaking in this respect annexed please.
2. Revised feasibility report annexed please with mention of electric evaporator to cater treated water and mechanical composter for SWM. Undertaking for Mechanical Composter annexed please.
3. Site plan has designated UTILITIES area for STP & SERVICES area for collective installation of Mechanical Composter & Electric Evaporator.
4. Revised Water balance chart ( Flow Chart) for all seasons annexed please.
5. Currently, PWRDA has exempted permission for residential Projects, i.e. for water use for drinking & domestic purposes. ( Ref - Clause 3.1(i) "PERMISSIONS & EXEMPTIONS" Chapter 3, Page 277 of Notification No. No. 75340/PWRDA-PWRDOGENL/37/2021-PWRDA-BR/418.- Dated 27-01-2023 of PWRDA.
Delay Regretted.
Warm Regards
(for Skyline Elevate.)
|
2023-03-31 10:38:37.426 |