ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
21104129 false false 2023-02-08 12:59:37.8
21104257 false false 2023-02-08 13:05:14.429
21113222 false false 2023-02-09 12:13:34.444
21321984 false false 2023-03-03 14:28:11.452
21452584 true false 2023-03-16 15:49:01.379
21575315 false false 2023-03-27 15:22:27.886
21575368 false false 2023-03-27 15:23:13.512
21575394 false false 2023-03-27 15:24:07.282
21670335 false true • The industry is required to be applied under orange category of industry as the industry involve in injecting moulding from recycled dana and in spray painting. • The industry is required to attach detailed site plan for the site of the unit. • The industry is required to attach Manufacturing Process with Flow chart for each process. • The industry has not attached 100 meter certificate from site of the industry from Tehsildar of the area w.r.t parameters Municipal limit, village lal lakir/phirni and residential area. • The industry has not attached Land use classification of site of the industry and site suitability certificate from DTP Ferozepur. • Consent to establish & consent to operate fee deposited by the industry are not adequate for orange category of industry. • CA certificate submitted by the industry does not have date mentioned as per which value of fixed assets given. • The industry is required to attach feasibility report/ dimensional drawing of air pollution control device with spray painting. If the same has been installed, in compliance to Board’s letter dated 28.02.2023 regarding exemption from submit completion certificate, the industry is required to submit undertaking to the effect that Pollution Control Device(s) has /have fabricated as per the dimensional drawing in feasibility report submitted and the same is able to achieve the prescribed standards. 2023-04-03 17:15:25.089
21778669 false false 2023-04-14 20:57:05.022
Previous1..184964184965184966184967184968184969184970184971184972184973..200958Next