ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
25392035 false false 2024-04-10 15:58:28.252
26134217 false false Sir, as per the clarification details of the Raw Material and Product are given below. Sorted Raw Rice (with Dryer) 3.0 by processing of Paddy 4.5 TPH (Existing) Sorted Raw Rice (with Dryer) 3.0 by processing of Paddy (Proposed) Total Capacity of the Rice Sheller after expansion will be Sorted Raw Rice (with Dryer) @ 6.0 TPH by processing of Paddy 9.0 TPH. 2024-07-04 14:09:05.684
26239765 false false Respected Mam Reply of clarification is attached herewith. 2024-07-15 15:06:07.802
26239805 false false 2024-07-15 15:08:23.63
26289759 false false 2024-07-18 17:30:32.611
26357983 false false 2024-07-24 13:22:32.28
25029878 false true a. As per manufacturing flow chart the industry is engaged in foundary process and is covered under the orange category. The industry is required to submit machinery detail installed in the industrial premises. b. Whether Site Clearance obtained for foundary process or not? c. Certificate of Revenue Authorities (DC/ADC/SDM) indicating the distance of site of industry from the MC Iimits/Phirni / Lallakir of the nearest village, in case, the industry is to be established at a site other than the site in the industrial area / industrial estate /industrial zone of the draft master plan / industrial zone of the notified master plan. d. Proof of date of commissioing i.e electric connection bill. 2024-02-28 16:10:29.744
25159620 false false 2024-03-15 00:26:40.032
25280815 false true The industry is required to deposit the balance penalty fee of Rs. 2880/- and NOC fee of Rs. 21,600/-. The consent fee of the industry is valid upto 30.06.2027 as per latest fixed assets of the industry. You are requested to deposit the same through online within 02 days positively. 2024-03-28 14:39:58.849
25280862 false false 2024-03-28 14:41:22.957
Previous1..199028199029199030199031199032199033199034199035199036199037..200596Next