ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
31008622 false true Sir, the application of the unit is scrutinized and it was observed that the area of the unit was does not falls under the jurisdictions of this Regional Office. If, approved the application be returned with the request to re apply with the concerned Regional Office. In case of any query applicant may visit the help desk of this regional office . 2026-01-27 11:53:54.83
31008629 false false 2026-01-27 11:54:05.139
31019752 true false 2026-01-27 14:57:02.471
31023186 false true The application of the project proponent has been scrutinized and it was observed as under: 1. The project proponent has not clarified the reason for submitting two applications after against a continuous land. However, the different permissions from different departments have been obtained as a single entity. 2. The project proponent in its feasibility report as well in the application form is required to clarify the proposed seating capacity of the proposed 05 no. restaurants in the premises, so as to enable this office to calculate maximum population vice versa maximum population and water requirements agsint the same. 3. The project proponent is required to submit approved layout plans of the proposed project from the competent Authority clearly showing the proposed no.of shops/restaurants etc and total achievable built-up area of the components as per the maximum FAR allowable for various components as per the Department of Housing and Urban Development notification no. G.S.R. 144/P.A.11/1995/Ss.180 and 43/2021 dated 31.08.2021. 4. The project proponent is required to clearly earmark the green area available with the project as proposed in the feasibility report, so as to utilize the treated waste water. 5. Further, the promoter company has not proposed to provide dual plumbing arrangement for re-use of the treated STP effluent for flushing purpose in congruence to the Board’s order no. 315 dated 05/07/2018. The promoter company is required to submit revised proposal accordingly. 6. The permission regarding sewer connection requires to comments whether sewer line is presently available to the proposed area, if yes, then whether the terminal STP is operational and its capacity to take the hydraulic load of the proposed project. 7. 8. Moreover, the promoter is also required to submit distance certificate from Tehsildar regarding distance from air polluting industry and no rice sheller/ brick kiln/ hot mix plant/ cement grinding unit/ stone crusher within 100 mtr from the periphery of the commercial colony and from nearby MAH UNIT. As such you are requested to clarify the aforesaid observations within 02 days, so as to proceed further in the matter. Till then, the application submitted by the industry shall be treated as incomplete. 2026-01-27 18:30:38.899
31024354 false false 2026-01-28 07:52:32.041
31024357 false false 2026-01-28 07:52:48.136
31041374 false false 2026-01-29 14:41:18.678
31048017 false false Respected Sir, it is intimated that the reply of show cause notice alongwith annexures is attached herewith for your ready reference. 2026-01-30 10:02:34.026
31048049 false false In reference to your clarification, we would like to inform you that earlier our unit was falling under the Medium Scale, Green Category, classified as Green/3999 – Miscellaneous (Green). At that time, no boiler was installed in our unit....................................... However, due to an increase in the value of assets, our unit now falls under the Large Scale category. Further, as per the revised categorization issued by the Punjab Pollution Control Board, the category of our unit has changed from Green/3999 – Miscellaneous (Green) to Green/178.3 – Garment and apparel manufacturing industry including Doubling/Reeling/TFO (Two-for-One) unit (dry process) – with boiler...................................... Accordingly, we selected the applicable category and applied for Consent to Operate (Water & Air). Since our unit now falls under the Large Scale category, obtaining Consent to Operate for Water and Air is mandatory, and therefore the same has been applied for...................... Reference to your Clarification No. 2, we are hereby submitting the list of machinery installed at our unit, details of which are as under: • Knitting Machines – 90 Nos. • Tubular Machines – 4 Nos. • Brushing Machine (24 Rolls) – 1 No. • Polisher – 3 Nos. • Poly Cutting Machine – 3 Nos. • Shearing Cutting Machine – 1 No. • Raising Machines – 2 Nos. • Reversing Machine – 1 No. Further, we are also submitting the new site plan and location plan, duly stamped and approved by the Authorized Person from the Department of Factories. 2026-01-30 10:05:03.928
31394764 false false 2026-03-06 15:07:51.369
Previous1..2073207420752076207720782079208020812082..201964Next