Show ApplicationProcessingDetails

Id: 20236938
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2022-10-21 16:37:35.146
File Note: <p style="text-align: justify;">The agenda note and report / recommendations of AEE/EE, RO, may kindly be perused.</p> <p style="text-align: justify;">It is submitted that the industry is small scale red category dyeing unit. Earlier, the area was visited by officer of the Board on 27.05.2022, continuous black smoke was observed from the stack of the industry. The industry has installed boiler of capacity 06 TPH with two stage alkali scrubbers followed by trima cyclone as APCD. During visit, the industry was found not operating the alkali scrubber and motor attached with scrubber was found dismantled. The industry was using rice husk as fuel. Black smoke remained being continuously emitted some location.</p> <p style="text-align: justify;">Accordingly, directions u/s 31-A of Air (Prevention &amp; Control of Pollution) Act, 1981 were issued to the PSPCL authorities to disconnect the electric supply &nbsp;vide Board letter no. 4814-19 dated 22.07.2022 and to seal the DG set installed by the industry.</p> <p style="text-align: justify;">Accordingly, the electric connection of the industry was disconnected by the PSPCL authorities vide TDCO no. 298/69 dated 25.07.2022 and DG set of the industry was sealed by the Board during visit on 26.07.2022.</p> <p style="text-align: justify;">After that, industry applied for consent to operate under the Air (Prevention &amp; Control of Pollution) Act, 1981through OCMMS on 26.07.2022 alongwith request for restoration of electric connection and grant of consent to operate under Air Act, 1981 and same was granted vide no. CTOA/Fresh/LDH4/2022/19425781 dated 04/08/2022, upto 03/11/2022 with certain conditions alongwith temporary restoration of electric connection for 03 months i.e. 03.11.2022.</p> <p style="text-align: justify;">Now, the industry has applied for renewal of consent to operate under Air (Prevention &amp; Control of Pollution) Act, 1981. The industry has already deposited consent fee, which is adequate upto 30.06.2025.</p> <p style="text-align: justify;">The industry was visited by AEE of RO on 19.10.2022 and it was observed as under: -</p> <p style="text-align: justify;">1.&nbsp;&nbsp;&nbsp;&nbsp;The industry was in operation during visit and is engaged in the process of dyeing &amp; finishing of the fabrics.</p> <p style="text-align: justify;">2.&nbsp;&nbsp;&nbsp;&nbsp;The industry has one thermopac of capacity 30 Lacs Kcal with trima cyclone followed by double stage alkali scrubber as APCD alongwith adequate stack of height, which has been newly installed with sampling arrangement.</p> <p style="text-align: justify;">3.&nbsp;&nbsp;&nbsp;&nbsp;The industry has also installed one boiler of capacity 06 TPH with trima cyclone followed by double stage alkali scrubber as APCD alongwith stack of adequate height, which has been newly installed with sampling arrangement.</p> <p style="text-align: justify;">4.&nbsp;&nbsp;&nbsp;&nbsp;The stack emission sample of the boiler of 06 TPH was collected on 15.09.2022 and sent to Zonal Lab for analysis and as per the analysis results the concentration of particulate matter from porthole on stack after APCD are found to be 154 mg/Nm3 against prescribed limits of 500 mg/Nm3.</p> <p style="text-align: justify;">5.&nbsp;&nbsp;&nbsp;&nbsp;The industry has installed 03 DG sets of capacities one of 500 KVA, one of 380 KVA and one of 320 KVA equipped with canopy and adequate stack height.&nbsp;</p> <p style="text-align: justify;">The industry is now complying with the provisions of Air (Prevention &amp; Control of Pollution) Act, 1981</p> <p style="text-align: justify;">In view of above, it is recommended that consent to operate under the Air (Prevention &amp; Control of Pollution) Act, 1981 may be granted for six months alongwith temporary restoration of electric connection of the industry with suitable conditions, please.</p> <p style="text-align: justify;">&nbsp;Competency : Hon'ble Chairman of the Board</p> <p style="text-align: justify;">&nbsp;</p>
Inspection: false
Inspection Note:
Officer: PPCB089
Reject: false
Reject Note:
Role: ZO EE Satyajit Attri