| File Note: |
<p class="MsoNormal" style="text-align: justify; text-indent: 1.0in;"><span style="font-size: 12.0pt; line-height: 107%; font-family: 'Tahoma',sans-serif;">It is submitted that the industry has installed ETP of 400 KLD capacity consisting of a Collection cum Equalization tank followed by a Flocculator, Primary Tube Settler, Sand filter and Carbon Filter. The HRT of Flocculator and Tube settler is more than 10 minutes and 2.5 hours respectively as per the Feasibility report. As such, the capacity of the ETP is adequate. </span></p>
<p> </p>
<p class="MsoNormal" style="text-align: justify; text-indent: 1.0in;"><span style="font-size: 12.0pt; line-height: 107%; font-family: 'Tahoma',sans-serif;">Submitted, please. </span></p> |