| File Note: |
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry was granted consent to operate under the Water Act, 1974 vide R16SGRCTOW3948406 dated. 02/06/2016 and the Air Act, 1981 vide no. R16SGRCTOA3935258 dated. 02/06/2016, both valid upto 30/06/2020, for manufacturing of Hotmix @ 125 MTD, subject to certain conditions mentioned therein under the name and style of M/s J.K. Associates, Malerkotla to Sangrur Road, Village Sangala, Tehsil & Distt. Malerkotla.</span></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The hot mix plant has now applied for obtaining fresh consent to operate under the Water Act, 1974 & the Air Act, 1981 under the name and style of M/s Hardeep Singh Contractor (Previously known as M/s J.K. Associates), Malerkotla to Sangrur Road, Village Sangala, Tehsil & Distt. Malerkotla.</span></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The hot mix plant has submitted copy of Sale agreement, lease deed and CA certificate alongwith other requisite documents.</span></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has deposited consent fee Rs. 9350/-(Rs. 4950/- CTO fee, Rs. 1100/- NOC fee and Rs. 3300/- penalty fee) Vide R. No. 573153741 dated 15/11/2022 under the Water Act, 1974 and Rs. 8750/-(Rs. 4950/- CTO fee, Rs. 3300/- penalty fee and Rs. 500/- application fee) Vide R. No. 527256158 dated 15/11/2022 under Air Act, 1981, which is adequate upto 30/09/2024 under Water Act, 1974 and the Air Act, 1981.</span></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">To verify the facts of the application the hot mix plant was visited by the AEE of this office on 15/11/2022 and contacted Sh. Hardeep Singh. During visit, it was observed as under:-</span></p>
<ol style="margin-top: 0in;" start="1" type="1">
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The hot mix plant was not in operation. The representative informed that the plant is not operation due to non availability of any work.</span></li>
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has installed hot mix plant consisting of rotary drum for manufacturing of premix one oil fired rotary furnace.</span></li>
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has installed wet scrubber as APCD to contain emission from rotary drum. Stack emission sample could not be collected due to non operation of the hot mix plant.</span></li>
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has one oil fired bitumen heating tank with adequate stack height.</span></li>
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has two no. DG set of capacity 125 KVA and 25 KVA with canopy and adequate stack height.</span></li>
<li class="MsoNormal" style="text-align: justify; mso-list: l0 level1 lfo1;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry has no source of trade effluent generation. Scrubbing water is re-circulated and only domestic effluent is discharged onto land for plantation after septic tank.</span></li>
</ol>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The code of practice to be followed by such units as prescribed by the Punjab Pollution Control Board was also checked at the time of visit, the compliance status of which is given as under:</span></p>
<table class="MsoNormalTable" style="border-collapse: collapse; mso-table-layout-alt: fixed; border: none; mso-border-alt: solid black .5pt; mso-yfti-tbllook: 1184; mso-padding-alt: 0in 5.4pt 0in 5.4pt; mso-border-insideh: .5pt solid black; mso-border-insidev: .5pt solid black;" border="1" width="649" cellspacing="0" cellpadding="0">
<tbody>
<tr style="mso-yfti-irow: 0; mso-yfti-firstrow: yes;">
<td style="width: 43.8pt; border: solid black 1.0pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US">S. No.</span></p>
</td>
<td style="width: 280.75pt; border: solid black 1.0pt; border-left: none; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US">Code of Practice to be followed by Hot Mix Plants</span></p>
</td>
<td style="width: 162.3pt; border: solid black 1.0pt; border-left: none; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US">Compliance Status</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 1;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">1.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">A suitable dust control system for the dryer and mixer to contain/ recycle permissible lines in the mix should be provided. It should be capable of preventing the exhaust of line dust into atmosphere from both ends of the dryer drum by creating adequate negative pressure.</span></p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complied, the industry has provided water sprinklers for control of dust emission.</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 2;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">2.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">The plant should have centralized control panel, cabin capable of presetting controlling/ synchronizing all operations starting from feeding of cold aggregates to the discharges of the hot mix to ensure proper mixing. It should have adequate water scrubbing mechanism to completely, remove/</span></p>
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">control the dust coming out of the drier with proper provision of re-circulation system for the scrubber water.</span></p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complied, the industry has provided control panel, cabin capable of presetting controlling/ synchronizing all operations starting from</span></p>
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">feeding of cold aggregates to the discharges of the hot mix to ensure proper mixing.</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 3;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">3.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Bitumen must be mixed with aggregates as soon as it is heated and dried and second time lifting to the dried aggregate for proper batching should be avoided.</span></p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complying.</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 4;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">4.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">All roads/ vehicular movements areas at site of Hot mix plant should be pucca/ stabilized with stone aggregates and regular sprinkling of water be ensured so that no dust is generated with vehicular movement.</span></p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complying as all the roads /vehicular movements areas</span></p>
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">at site of Hot mix plant are stabilized with stone</span></p>
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">aggregates.</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 5;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">5.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Hot Mix plant must have proper stack heights for its scrubbed flue gases and bitumen heating system with proper platform and port holes as per the Punjab Pollution Control Board norms.</span></p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complying, the industry has provided adequate stack height with APCD and bitumen heating system.</span></p>
</td>
</tr>
<tr style="mso-yfti-irow: 6; mso-yfti-lastrow: yes;">
<td style="width: 43.8pt; border: solid black 1.0pt; border-top: none; mso-border-top-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="58">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">6.</span></p>
</td>
<td style="width: 280.75pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="374">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Fine dust arrested by water scrubber and collected in the re-circulation water tank should be collected and filled in a pit to be covered with fresh earth. This exercise should be repeated as and when dust is removed from re-circulation tank.</span></p>
<p class="MsoBodyText2" style="text-align: left;" align="left"> </p>
</td>
<td style="width: 162.3pt; border-top: none; border-left: none; border-bottom: solid black 1.0pt; border-right: solid black 1.0pt; mso-border-top-alt: solid black .5pt; mso-border-left-alt: solid black .5pt; mso-border-alt: solid black .5pt; padding: 0in 5.4pt 0in 5.4pt;" valign="top" width="216">
<p class="MsoBodyText2" style="text-align: left;" align="left"><span lang="EN-US" style="font-size: 12.0pt; font-weight: normal;">Complying, during visit, the water scrubber was found in operation and fine dust was being collected in tank.</span></p>
</td>
</tr>
</tbody>
</table>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">From above, it is evident that the industry was found complying with the conditions of consents granted to it under the Water Act, 1974 & the Air Act, 1981 and code of practice prescribed for such unit during last visit.</span></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 75.55pt;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">Keeping in view of above, it is, therefore, recommended that the hot mix plant may be granted fresh consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 & the Air (Prevention & Control of Pollution) Act, 1981 upto 30/09/2024 under the name and style of M/s Hardeep Singh Contractor (Previously known as M/s J.K. Associates), Malerkotla to Sangrur Road, Village Sangala, Tehsil & Distt. Malerkotla for manufacturing of Hotmix @ 125 MTD with suitable conditions and special conditions that the hot mix plant shall get its APCD monitored from Board’s lab & shall submit analysis report to the Board within two month.</span></p> |