Show ApplicationProcessingDetails

Id: 20437491
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2022-11-18 14:59:03.309
File Note: <p class="MsoNormal" style="margin-bottom: 0cm; text-align: justify; line-height: normal;"><strong style="mso-bidi-font-weight: normal;"><u><span lang="EN-US" style="mso-bidi-font-size: 12.0pt; mso-ascii-font-family: Calibri; mso-ascii-theme-font: minor-latin; mso-hansi-font-family: Calibri; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: red;"><span style="text-decoration: none;">&nbsp;</span></span></u></strong></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 4.0pt 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The industry was granted consents to operate under Water Act, 1974 &amp; Air Act, 1981 CTOW/Fresh/BTI/2018/6820933 &amp; CTOA/Fresh/BTI/2018/6820910 dt. 21.02.2018, valid upto 30.09.2022 for production of Raw rice / sorted rice @ 2 TPH with dryer, with certain conditions mentioned therein. </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 4.0pt 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The industry was granted consent to establish (NOC) for Expansion of an existing industrial unit u/s 25 of Water (Prevention &amp; Control of Pollution) Act, 1974 and u/s 21 of Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. CTE/Exp/BTI/2022/19827055 dated 05.09.2022, valid upto 04.09.2023, for Raw rice / sorted rice with dryer @ 5 TPH, with certain conditions mentioned therein.</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 0cm 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">Now, the industry has applied for obtaining varied consents to operate under the provisions of Water Act, 1974 and Air Act, 1981 through online on OCMMS for the enhanced production capacity of Raw Rice/Sorted Rice @ 5 TPH alongwith dryer under orange category with requisite documents.</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 0cm 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The detail of the case is as under: -</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 0cm 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The industry has deposited the </span><span style="font-family: 'Tahoma',sans-serif; mso-bidi-font-family: Raavi; color: black; mso-themecolor: text1; mso-ansi-language: EN-IN; mso-bidi-language: PA; mso-bidi-font-weight: bold;">consent fee of Rs. </span><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">42000/- through online vide R.no. 000125367404 dated 14.07.2022 under Water Act, 1974 and </span><span style="font-family: 'Tahoma',sans-serif; mso-bidi-font-family: Raavi; color: black; mso-themecolor: text1; mso-ansi-language: EN-IN; mso-bidi-language: PA; mso-bidi-font-weight: bold;">Rs. </span><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">42000/- through online vide R.no. 000125367134 dated 14.07.2022 under Air Act, 1981 for the fixed assets of Rs. 165.50 lacs, which is adequate upto 30.09.2027.</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -18.0pt; line-height: normal; mso-list: l1 level2 lfo1; margin: 0cm 0cm 0cm 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The industry has submitted completion certificate for addition in existing rice sheller unit from 2 TPH Rice to 5 TPH Rice at mill premises with all necessary air emission control measures by installing APCD of proper design with plant.</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -37.45pt; line-height: normal; mso-pagination: none; mso-list: l3 level1 lfo2; tab-stops: list 14.2pt left 72.0pt 270.0pt; mso-layout-grid-align: none; text-autospace: none; margin: 0cm 0cm 4.0pt 36.0pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">The industry was visited by the undersigned on 17.11.2022 and it was observed as under &ndash;</span></p> <p class="MsoListParagraph" style="margin-bottom: 0cm; mso-add-space: auto; text-align: justify; text-indent: -18.0pt; line-height: normal; mso-pagination: none; mso-list: l3 level1 lfo2; tab-stops: list 36.0pt left 260.25pt; mso-layout-grid-align: none; text-autospace: none;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1;">The industry was not in operation.</span></em></p> <ul style="margin-top: 0cm;" type="disc"> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has installed cyclones as APCDs with pre-cleaner section and shelling section and the same were found in operation-able condition. </span></em></li> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has provided stack of adequate height with paddy cleaner and shelling section as well as provided sampling facilities.</span></em></li> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has provided wall of adequate length with height of 10 feet around husk storage area and 5 feet Jali have been provided over the said wall. </span></em></li> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has provided paved road for the control of the vehicular dust pollution.</span></em></li> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has provided the septic tank for treatment of domestic effluent of office building with provision of discharge of effluent onto land for plantation. </span></em></li> <li class="MsoNormal" style="color: black; mso-themecolor: text1; margin-bottom: 0cm; text-align: justify; line-height: normal; mso-list: l2 level1 lfo3;"><em style="mso-bidi-font-style: normal;"><span lang="EN-US" style="font-family: 'Tahoma',sans-serif;">The industry has provided adequate plantation along the boundary wall of the industry.</span></em></li> </ul> <p class="MsoListParagraphCxSpFirst" style="mso-add-space: auto; text-align: justify; text-indent: -18.0pt; mso-list: l0 level1 lfo4; margin: 0cm 0cm 4.0pt 14.2pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1;">From the <span style="mso-bidi-font-weight: bold;">above it is clear that the site is suitable for the expansion in its existing premises and the industry is complying with the <a name="_Hlk81830170"></a>provisions of the Water Act, 1974 &amp; Air Act, 1981 as well as code of practice prescribed by the Govt. vide order dt.15.10.2013.<span style="mso-tab-count: 1;">&nbsp;&nbsp; </span></span></span></p> <p class="MsoListParagraphCxSpLast" style="margin-left: 14.2pt; mso-add-space: auto; text-align: justify; text-indent: -18.0pt; mso-list: l0 level1 lfo4;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Wingdings; mso-fareast-font-family: Wingdings; mso-bidi-font-family: Wingdings; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;"><span style="mso-list: Ignore;">&Oslash;<span style="font: 7.0pt 'Times New Roman';">&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Tahoma',sans-serif; color: black; mso-themecolor: text1; mso-bidi-font-weight: bold;">Keeping in view of above, it is recommended that varied consents to operate under the provisions of the Water Act, 1974 &amp; Air Act, 1981 may be granted to the industry for operation of rice sheller unit of capacity 5 TPH of Raw Rice/Sorted Rice with dryer for a period upto 30.09.2027, subject to the suitable conditions along with that the industry will submit its air emission sample report of its shelling section as well as dryer section in every paddy season.</span></p>
Inspection: false
Inspection Note:
Officer: PPCB097
Reject: false
Reject Note:
Role: RO AEE Ravi Pal