| File Note: |
<p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; line-height: normal;"><strong style="mso-bidi-font-weight: normal;"><span style="font-family: 'Tahoma','sans-serif'; color: black;">The project proponent has applied for NOC expansion for installation of induction furnace of 3 Ton/heat capacity </span></strong><span style="font-family: 'Tahoma','sans-serif'; color: black;">for the manufacturing of Alloy Steel Ingot @ 50 TPD using M.S. scrap @ 55 TPD.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="margin: 0in; margin-bottom: .0001pt; text-align: justify; background: white;"><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;"><span style="mso-tab-count: 1;"> </span>Earlier, the CTE case applied by the industry was returned due to reason that the industry has not submitted the proper land use classification certificate of the proposed site. </span><span style="font-family: 'Tahoma','sans-serif'; color: black;">The industry has submitted CLU certificate issued by STP</span><strong><em><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; color: black; mso-bidi-language: AR-SA;"> </span></em></strong><span style="font-family: 'Tahoma','sans-serif'; color: black; mso-bidi-language: AR-SA;">vide memo no. 1732 STP (L)/TW-12A dated 26.07.2021, Ludhiana mentioning that the site falls in mixed land use along road front zone as per notified Master Plan, Ludhiana (2007-31) and the alloy steel unit is permitted at site.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="margin: 0in; margin-bottom: .0001pt; text-align: justify; background: white;"><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;"><span style="mso-tab-count: 1;"> </span>Now, the industry has submitted latest DTP certificate vide memo no. 2110 dated 25.11.2022 stating that “<strong><em>The permission for change of land use for subject cited above was issued. In this permission letter due to typographical error it was written that the site falls in Mix Land Use along road front zone whereas site falls in industrial land use zone as per Notified Master Plan, Ludhiana (2007-31), so the land use zone of this permission for CLU shall remain the same as per letter vide memo no. 1732 STP (L)/TW-12A dated 26.07.2021”.</em></strong></span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="margin: 0in; margin-bottom: .0001pt; text-align: justify; background: white;"><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;"><span style="mso-tab-count: 1;"> </span>The project proponent has submitted project report with total cost of Rs.1389 Lacs and has deposited Rs. 21600/- as NOC Fee under orange category, which is adequate for one year.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 0in .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: red;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">As per project report submitted by the industry, the manufacturing process to be involved is as under:-“Purchase of scrap melting of metal moulds steel ingots sorting and dispatch”</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><strong><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry has applied for manufacturing of Steel Ingot @ 50 MTPD using M.S. scrap @ 55 MTPD. </span></strong></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">Considering 350 days of operation in an year, the industry can generate a maximum production capacity of 17500 Ton/year.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry has proposed to install electricity based induction furnace of capacity <strong>3 Ton/heat</strong>. Further, the industry has submitted feasibility report obtained from PSCST, Chandigarh regarding provision of pulse jet bag filter house as APCD on the induction furnace having melting capacity as 3 ton/heat alongwith side suction hood for capturing the emissions generated from the process.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry has also proposed to install 2 no. Forging Heater and 5 No. Annealing furnace.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry has also proposed to installed one D.G set of capacity 200 KVA.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msobodytext2" style="text-align: justify; text-indent: -.25in; mso-list: l1 level1 lfo1; background: white; margin: 0in 12.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry will generate domestic waste water which shall be discharged onto land for plantation after septic tank.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10tableparagraph" style="text-align: justify; text-indent: -.25in; line-height: 14.65pt; mso-list: l1 level1 lfo1; background: white; margin: .15pt 4.85pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">To verify the contents of the application, the site of the project was visited by AEE of this office on 22.11.2022 and it was observed that:-</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10tableparagraph" style="text-align: justify; text-indent: -.25in; line-height: 14.65pt; mso-list: l1 level1 lfo1; background: white; margin: .15pt 4.85pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The proposed site is situated in the revenue area of village Khakat, G.T. Road, Distt. Ludhiana.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10tableparagraph" style="text-align: justify; text-indent: -.25in; line-height: 14.65pt; mso-list: l1 level1 lfo1; background: white; margin: .15pt 4.85pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The industry has completed the industrial shed and some of the non-polluting machinery has been installed at site. </span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10tableparagraph" style="text-align: justify; text-indent: -.25in; line-height: 14.65pt; mso-list: l1 level1 lfo1; background: white; margin: .15pt 4.85pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; color: black;"><span style="mso-list: Ignore;">·<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 11.0pt; font-family: 'Tahoma','sans-serif'; color: black;">The construction work regarding installation of induction furnace has not started yet.</span><strong><span style="font-size: 11.5pt; font-family: 'Tahoma','sans-serif'; color: black;"> </span></strong></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="margin-bottom: .0001pt; text-align: justify; background: white;"><strong><span style="font-size: 11.5pt; font-family: 'Tahoma','sans-serif'; color: black;">Applicability of 1</span></strong><strong><span style="font-size: 8.0pt; font-family: 'Tahoma','sans-serif'; color: black;">st </span></strong><strong><span style="font-size: 11.5pt; font-family: 'Tahoma','sans-serif'; color: black;">schedule of Factory Act, 1948 & EIA notification dated 14.09.2006 :-</span></strong></p>
<ul type="disc">
<li class="MsoNormal" style="color: black; mso-margin-top-alt: auto; margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-list: l0 level1 lfo2; tab-stops: list .5in; background: white;"><span style="font-family: 'Tahoma','sans-serif';">The industry does not attract the provisions of EIA notification dated 14.09.2006, as such, the industry is n</span><span style="font-family: 'Tahoma','sans-serif'; color: windowtext;">ot required to obtain environmental clearance under the EIA notification dated 14.09.2006 as the industry has submitted detailed calculation/undertaking in its project report stating that the production capacity shall not go beyond 29200 Ton/year.</span></li>
<li class="MsoNormal" style="color: black; mso-margin-top-alt: auto; margin-bottom: .0001pt; text-align: justify; line-height: normal; mso-list: l0 level1 lfo2; tab-stops: list .5in; background: white;"><span style="font-family: 'Tahoma','sans-serif'; color: windowtext;">The Govt. of Punjab, Department of Labour (Directorate of Factories Wing) vide Endst. No. 7346-59 dated 27.08.2013 has decided that the factories located/ to be set up in the designated/approved areas such as Industrial Area/ Industrial Estate/ Industrial Focal Point/ Approved Industrial Park/ Industrial Zone of the Master Plan/ Draft Master Plan are exempted for clearance of site from SCA-cum-SAC</span><span style="font-family: 'Tahoma','sans-serif';">.</span></li>
</ul>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="margin: 0in; margin-bottom: .0001pt; text-align: justify; background: white;"><span style="font-size: 11.5pt; font-family: 'Tahoma','sans-serif'; color: black;"><span style="mso-tab-count: 1;"> </span></span><span style="font-family: 'Tahoma','sans-serif'; color: black;">Keeping in view of above, it is therefore, recommended that consent to establish (NOC) from pollution angle may be granted to the project proponent for the period of one year, subject to suitable terms and conditions & additional conditions that:-</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l0 level2 lfo2; background: white; margin: 0in 0in .0001pt 35.6pt;"><!-- [if !supportLists]--><span style="font-size: 10.0pt; font-family: 'Helvetica','sans-serif'; mso-fareast-font-family: Helvetica; color: black;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-family: 'Tahoma','sans-serif'; color: black;">The industry shall provide adequate APCD as per feasibility report obtained from PSCST, Chandigarh to contain the emission within limits as prescribed by the Board.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l0 level2 lfo2; background: white; margin: 0in 0in .0001pt 35.6pt;"><!-- [if !supportLists]--><span style="font-size: 10.0pt; font-family: 'Helvetica','sans-serif'; mso-fareast-font-family: Helvetica; color: black;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-family: 'Tahoma','sans-serif'; color: black;">The industry shall also install energy meter with the APCD.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l0 level2 lfo2; background: white; margin: 0in 0in .0001pt 35.6pt;"><!-- [if !supportLists]--><span style="font-size: 10.0pt; font-family: 'Helvetica','sans-serif'; mso-fareast-font-family: Helvetica; color: black;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-family: 'Tahoma','sans-serif'; color: black;">The industry shall submit building plan approved from the Competent Authority under the provisions of the Punjab Factories Rules, 1952 before the commissioning of the unit.</span></p>
<p class="ydp8b25cf8eyiv6589084485ydp48a32f10msonormal" style="text-align: justify; text-indent: -.25in; mso-list: l0 level2 lfo2; background: white; margin: 0in 0in .0001pt 35.6pt;"><!-- [if !supportLists]--><span style="font-size: 10.0pt; font-family: 'Helvetica','sans-serif'; mso-fareast-font-family: Helvetica; color: black;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-family: 'Tahoma','sans-serif'; color: black;">The industry shall develop adequate plantation area for discharge of domestic effluent.</span></p> |