| File Note: |
<p>Sir RO has reported that earlier the consent to operate under Water (Prevention & control of Pollution) Act, 1974 & Air (Prevention & control of Pollution) Act, 1981 was granted upto 30/09/2022 for the operation of Marriage Palace vide online reference no. CTOW/Fresh/GRP/2018/7418867 & CTOA/Fresh/GRP/2018/7418955 dated 14/05/2018 respectively under orange category.</p>
<p> Now the industry has applied for obtaining renewal of consent to operate under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 for the operation of Marriage Palace through OCMMS in a totally paperless manner by uploading necessary documents as PDF under orange category.</p>
<p> The industry has deposited Rs. 19,500/- vide UTR No. 505844716 dated 04/10/2022 & Rs. 19,000/- vide UTR No. 505844027 dated 04/10/2022 as consent to operate fee under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 including Rs. 500/- as Form Downloading fee against total gross value of fixed assets worth Rs. 71,00,000/- as on 30/09/2022 and same are adequate upto 30/09/2027 under both Acts. As per policy of the Board and in the light of Head Office Order No. 59 dated 02/02/2016, the consent cases of Orange Category units are to be processed without visiting them. </p>
<p>RO has recommended that the consent to operate under Water (Prevention& control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 may be extended upto 30/09/2027 with suitable conditions. </p>
<p>In view of above, it is recommended that the consent to operate under Water (Prevention& control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 may be extended upto 30/09/2027 with suitable conditions and special conditions that:-</p>
<p>1. The Project Proponent shall install & commission STP or Oil & Grease trap followed by septic tank.</p>
<p>2. The project proponent shall obtain necessary permission from Punjab Water Regulation & Development Authority (PWRDA) for extraction of ground water.</p>
<p>3. The project proponent shall maintain records of fresh water consumption and operation of STP on daily basis.</p>
<p>4. The project proponent shall properly channelize the fugitive emissions including emissions from cooking & kitchen operations by providing proper ducting / hood arrangement and proper exhaust system.</p>
<p>5. The project proponent shall properly handle and manage the solid wastages as per the provisions of the Municipal Solid Waste Rules 2016 and ensure that the solid waste is segregated & disposed of in an environmentally sound manner. </p>
<p>6. The Project Proponent shall develop the vermi-composting/composting to manage the bio-degradable solid wastes.</p>
<p>7. The project proponent shall not throw burn or burry any solid wastes in open outside premises or in drain / water bodies.</p>
<p>8. The project proponent shall not use or allow to use single use plastic (SUP) items in the premises as same are banned from 01/07/2022 as per the Notification of Govt. of India as well as Punjab.</p>
<p>9. The marriage palace shall analyze its water analysis samples from Board's lab within 01-month from the issuance of consent.</p>
<p> </p>
<p>9. The Regional Office shall visit the site, verify status and submit detailed report along with recommendations within 01-month.</p>
<p>Competency (SEE Sir).</p> |