Show ApplicationProcessingDetails

Id: 20699436
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2022-12-21 16:38:24.439
File Note: <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong>Background:- </strong>It is submitted that the industry is a medium scale red category CETP for treatment of trade effluent generated by the electroplating and allied industries. The CETP Operator was granted consent to operate under the Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. CTOA/Renewal/LDH4/2019/10762938 dated 03/10/2019, upto 30/06/2024 and under the Water (Prevention &amp; Control of Pollution) Act, 1974 vide no. <span style="mso-bidi-font-style: italic;">CTOW/Renewal/LDH4/2022/16981292 dated 29/08/2022, upto 28/02/2023 </span>with certain conditions.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><span lang="EN-IN">The CETP operator was granted authorization under Hazardous &amp; Other Wastes (Management &amp; Trans-boundary Movement) Rules, 2016 vide no. HWM/LDH/CETP/2016-21/R-001 dated 17/06/2016, which was expired on 16/06/2021 with certain conditions. </span></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">It is intimated that the CETP Operator was given hearing before the Chairman of the Board on 16.07.2021 and various ex-party decisions were taken as under: -<span style="mso-spacerun: yes;">&nbsp; </span></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">1.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The act and conduct of the operator of the CETP has caused damage to the environment, as such Environmental Compensation w.e.f. 16.08.2019 shall be imposed on the operator of the CETP for continuous violation and noncompliance towards pollution control norms and for making agreements with the existing/new member units over and above the consented capacities without prior permission of the Board in violation of the decision taken during the hearing held on 19.10.2020. Environmental Engineer, Regional Office-4, Ludhiana shall calculate the Environmental Compensation on the CETP Operator as per above and get it approved from the EC verification Committee. A separate order for imposition of Environmental Compensation will be passed. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">2.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator shall submit a Bank Guarantee of Rs. 10.00 Lacs as an assurance to complete all the works in accordance with the decisions already taken during the hearing dated 27.05.2021, within 04 days failing which legal action shall be initiated against the CETP. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">3.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The Ludhiana Effluent Treatment Society (LETS) being the supervisory/administrative arm for control of the functioning of CETP shall ensure that the CETP complies with all the observations made by Er. J.S. Kamyotra, Ex. Member Secretary, CPCB. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">4.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall comply with all the observations made by the NGT Monitoring Committee during earlier visit made on 06.10.2018 and 16.08.2019 and the observations made by the officers of the Board during the visit dated 27-12-2019 and shall submit detailed compliance report to the Board within 07 days. LETS shall ensure compliance of the above decisions. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">5.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->Apart from the above, the CETP operator shall comply with all the decisions taken during the hearing held on 11.09.2020 and 27.05.2021. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">6.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator shall provide the EMF meters at all components of the CETP and ensure the connectivity of the same to the SCADA system to enable a fool proof mechanism. The entire work shall be completed within a time bound manner i.e. 30 days as already decided in the earlier hearing held on 11.09.2020. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">7.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator shall provide piezometers at relevant locations in the CETP premises to monitor the quality of ground water, within 10 days. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">8.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator shall ensure that no new/revised agreements are made by the facility. Ludhiana Effluent Treatment Society (LETS) shall ensure that all the execution works i.e. the membership of the CETP/cancellation of agreements/revision of agreements are carried out through LETS and with the prior permission of the Board in order to maintain a proper statutory regulatory regime. LETS shall be held responsible for any additional agreements made by the CETP Operator. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l6 level1 lfo1; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">9.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The Ludhiana Effluent Treatment Society (LETS) shall be given separate hearing in the case and in future LETS shall be responsible for proper operation of CETP, hearings and other responsibilities. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">These decisions were conveyed to the CETP operator vides no. 5245 dated 16.07.2021. Further, Environmental Compensation amounting to Rs. 1,05,15,000/- was imposed upon the CETP operator vide Board order no. 59 dated 17.07.2021. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The CETP operator was again given personal hearing before Chairman of the Board on 10.06.2022 for show cause notice for refusal of consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974. The proceedings of the said hearing was issued vide Board letter no. 5471 dated 29.08.2022 and wherein it was decided that:-</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">1.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall comply with the all hearing decision dated 16.07.2021, 11.09.2020 and observations of monitoring from 04.08.2021 to 06.08.2021, without any delay. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">2.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall provide list to Board of those industries regularly by 10th of every month, which are not getting their effluent lifted on daily basis, so that the Board can check the operation of the unit.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">3.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall install device before the equalization tank to measure the lifted effluent from the industries, within a month.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">4.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall provide the EMF meters at all components of the CETP and ensure the connectivity of the same to the SCADA system to enable a fool proof mechanism. The entire work shall be completed within a time bound manner i.e. 30 days as already decided in the earlier hearing held on 11.09.2020.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">5.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall monitor the quality of ground water of piezometers installed in the CETP premises and submit report in the office of Environmental Engineer, Regional Office-4, Ludhiana on monthly basis.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">6.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall achieve the prescribed standards to ensure reuse its RO permeate effluent into industrial premises. CETP operator shall explore the possibilities to utilize its entire treated waste water for construction/sprinkling/dust suppression/onto land for plantation inside and surrounding areas of Focal Point and submit the proposal in this regard in the office of Environmental Engineer, Regional Office-4, Ludhiana within a period of one month.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">7.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall deposit Bank Guarantee of Rs. 10 Lacs, within 07 days. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l2 level1 lfo2; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">8.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->Consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 be granted to the CETP operator for short term i.e. for six months.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The CETP operator has failed to submit bank guarantee of Rs. 10.00 Lacs and the compliance of the decision dated 16.07.2021 and 10.06.2022 to the Board till date. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">Thereafter, the CETP Operator has applied for obtaining Consent to Establish (NOC for expansion) for increasing the capacity from 500 KLD to 800 KLD through OCMMS on 12.07.2022 and same was returned on 21.11.2022 due to reasons as below:-</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal; margin: 0in .5in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><em style="mso-bidi-font-style: normal;">&rdquo;That consent to establish (CTE) for expansion of CETP shall be applied by the SPV i.e. Ludhiana Effluent Treatment Plant (LETS) which is the overall custodian of the CETP. The consent to establish cannot be given in the hands of M/s JBR Technologies Pvt. Ltd who is mere operator of the said CETP."</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong style="mso-bidi-font-weight: normal;"><u>DIC Letter</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">Further, vide letter no. DIC/Tech/CETPs-LDH/5988-B dated 16.12.2022 issued by the Secretary-cum-Director of Industries to the Board regarding consent to establish/NOC for expansion for CETP installed for electroplating unit at Phase-VIII, Focal Point, Ludhiana under the Water (Prevention &amp; Control of Pollution) Act, 1974 and under the Air (Prevention &amp; Control of Pollution) Act, 1981, The relevant content of the letter is as under:-</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">2.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">In this context, it is submitted that upon considering the necessity for up-gradation of treatment capacity of the existing Common Effluent Treatment Plant for Electroplating industry at Plot No. D-260-61, Phase-VIII, Focal Point, Ludhiana approval was accorded to M/s JBR Technologies Limited for up-gradation of treatment capacity of the CETP from 500 KL to 800 KL with the condition that:</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -1.5in; mso-text-indent-alt: -9.0pt; line-height: normal; mso-list: l1 level3 lfo3; margin: 0in 0in 6.0pt 1.5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;"><span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>i.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">The require consent to operate is to be obtained by the operator from Punjab Pollution Control Board in due course of time.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -1.5in; mso-text-indent-alt: -9.0pt; line-height: normal; mso-list: l1 level3 lfo3; margin: 0in 0in 6.0pt 1.5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;"><span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>ii.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">The outlet parameters are to be achieved as per the prescribed norms of PPCB and CPCB from time to time.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -1.5in; mso-text-indent-alt: -9.0pt; line-height: normal; mso-list: l1 level3 lfo3; margin: 0in 0in 6.0pt 1.5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;"><span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>iii.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">The operator shall be responsible to obtain all the mandatory regulatory clearances from the concerned Departments.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">3.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">Accordingly, M/s JBR Technologies Limited applied online to PPCB vide application OCMMS application no. 19073444 dated 12.07.2022. The application of the operator has been returned with the condition that Custodian Department of CETP and SPV-Ludhiana Effluent Treatment Society for Electroplating may apply for expansion of CETP so that same may be processed for necessary action.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">4.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">The existing CETP for electroplating which is operation since December, 2007 as per the Tripartite Agreement executed on 25.06.2007 between the Punjab Small Industries &amp; Export Corporation Ltd, Ludhiana Effluent Treatment Society for Electroplating Industries and with the operator &ndash; M/s JBR Technology Pvt. Ltd.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">5.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">Upon increasing the trade effluent of electroplating industry in the State, the capacity of CETP were increase from time to time. First the capacity was increased during the year 2012 from 200 KLD to 300 KLD. Second time it was increased during the year 2015 from 300 KLD to 500 KLD. Recently on 17.03.2021, approval has been given to the operator for increasing the capacity of the CETP from 500 KLD to 800 KLD.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">6.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">It is pertinent to mention here that recently the PPCB has granted consent to operate to M/s JBR Technologies operator of the CETP vide certificate no. CTOW/Renewal/LDH4/2022/16981292 dated 29.08.2022 and similarly to the operator of the CETP Chanalon, Kharar, SAS Nagar.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l1 level1 lfo3; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><em style="mso-bidi-font-style: normal;"><span style="mso-list: Ignore;">7.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span></em><!--[endif]--><em style="mso-bidi-font-style: normal;">The NOC/CTO for the establishment of the new CETP's in Punjab has been issued by PPCB in favor of the concerned SPV's where all the expenditures for setting up the plant are borne by SPV and not by the operator whereas in our case the operator M/s JBR Technologies Ltd as per the Tripartite Agreement has incurred all the expenditures for putting the CETP in operation for treatment of trade effluent of electroplating industries. Presently, for upgradation of the capacity of the existing CETP from 500 KLD to 800 KLD all the expenditure being incurred by the JBR Technologies Pvt. Ltd.</em></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal; margin: 0in 0in 6.0pt 1.0in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><em style="mso-bidi-font-style: normal;">You are therefore, requested to consider the application of M/s JBR Technologies Limited, operator of Common Effluent Treatment Plant for electroplating at Plot No. D-260-61, Phase-VIII, Focal Point, Ludhiana for grant of CTO/CTE/NOC for enhancement of treatment capacity of existing CETP from 500 KLD to 800 KLD</em>. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong style="mso-bidi-font-weight: normal;"><u>Court Case</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">It is also informed that the CETP operator has filed a appeal against the Board in Hon&rsquo;ble Punjab &amp; Haryana High Court, Chandigarh vide CWP No. 15962 of 2021 for quashing of proceeding dated 19.10.2020 and decision dated 16.07.2021 and EC order dated 17.07.2021. The petitioner was heard in the Hon&rsquo;ble Punjab &amp; Haryana High Court, Chandigarh on 19.08.2021 and the following order were passed by the Punjab &amp; Haryana High Court, Chandigarh.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal; margin: 0in .25in 10.0pt .25in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">"<em>Keeping the concept of parity in mind, it is ordered that in case the petitioner deposits 50% of the compensation required to be deposited as per the impugned order. Further steps for recovery shall remain stayed</em>."</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong style="mso-bidi-font-weight: normal;">The operator has not submitted the Environmental Compensation to the Board till date, in compliance of the order dated 17.07.2021 or in pursuance of the order of the Hon&rsquo;ble Punjab &amp; Haryana High Court, Chandigarh dated 19.08.2021. </strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The reply in the court case has already been filed in the Hon'ble Punjab &amp; Haryana High Court, Chandigarh. The case is now fixed for 18.05.2023.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong style="mso-bidi-font-weight: normal;"><u>NOC application</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The CETP Operator has again applied for obtaining Consent to Establish (NOC for expansion) under the Water (Prevention &amp; Control of Pollution) Act, 1974 and under the Air (Prevention &amp; Control of Pollution) Act, 1981 for increasing the capacity from 500 KLD to 800 KLD through OCMMS on 17.12.2022 in light of the Tripartite Agreement executed on 25.06.2007 between the Punjab Small Industries &amp; Export Corporation Ltd (PSIEC), Ludhiana Effluent Treatment Society (LETS) for Electroplating Industries<span style="mso-spacerun: yes;">&nbsp; </span>and with the operator &ndash; M/s JBR Technology Pvt. Ltd. (CETP operator). </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">During recent visit of the Secretary-cum-Director of Industries and Commerce and Chairman LETS; the CETP operator mentioned that the industry is not covered under EIA notification 2006, therefore, there is no need to obtain Environmental Clearance (EC) for its expansion.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The CETP operator has submitted Rs. 21,600/- as NOC regularization fee, however, same has not yet verified with the OCMMS. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">The treated effluent samples of CETP are collected on regular monthly basis and are found to be within prescribed limits of the Board. The details of results are attached as pdf file.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong><u>Working of CETP:-</u></strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">a.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The components of the machinery components: collection tank, 02 equalization tanks, 06 reaction tanks, 08 primary tube settlers, 06 secondary tube settlers, clarifier, 02 sand filters, 02 activated carbon filters, resin filter (One set Anion-Cation System), 03 modules RO System, MEE, 04 sludge drying beds</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">b.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The effluent from the tankers is collected in the collection tank which is further transferred to the 02 equalization tanks. The pH of effluent in these tanks is &lt; 2.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">c.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The effluent from the 02 equalization tanks is transferred in the 06 reaction tanks of having capacities (3x20 KL, 2x25 KL and 1x35 KL.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">d.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The chemicals i.e., Lime, SMBS, Poly-Electrolyte are imparted as coagulating &amp; flocculating agents in these reaction tanks and to prepare a batch having pH 7 to 8. The average time taken to prepare a batch is about 1.5 to 02 hours depending upon the quality of the effluent and the capacity of the reaction tank.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">e.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->After preparing the batch, effluent from the reaction tank is sent to <span style="color: #c00000;">08 </span>primary tube settlers, which are connected in parallel for settlement of the solids. The effluent from the primary tube settler is then transferred to the 06 secondary tube settlers followed by clarifier and then followed by 02 activated carbon filters. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">f.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The effluent from the activated carbon filter is then sent to resin filter followed by Anion/ Cation Filter then Multi grade filter which is further followed by reverse Osmosis plant (03 modules).</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">g.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->As per the representative of the CETP operator, the RO permeate from the RO plant is sent to the industries and RO reject is sent to Single stage Evaporators. The CETP operator has been installed single stage evaporator (4 evaporators having holding capacity 7 KL each) having evaporation capacity about 12 KL/hr (calculated manually).</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">h.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The Condensate from the evaporators is mixed with RO permeate and then sent to the industries and the concentrate being Hazardous in nature is sent to sludge drying beds. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l0 level1 lfo4; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">i.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator has installed electromagnetic flow meter at the pipeline carrying RO permeate given to the industries.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><strong style="mso-bidi-font-weight: normal;"><u>Visit Report</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">Accordingly, the CETP was visited by AEE of this office on 09.12.2022 and it was observed as under: - </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l3 level1 lfo5; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">1.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP was in operation during the visit. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l3 level1 lfo5; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">2.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator has not yet started any construction activity for the proposed project.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l3 level1 lfo5; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">3.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->As per the proposal, the CETP operator will enhance the capacity of ETP. The details of the expansion of various components of ETP as per the representation dated 21.12.2022 is attached as pdf file. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpFirst" style="margin-bottom: 6.0pt; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l3 level1 lfo5;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">4.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->Further, the CETP operator has not proposed any additional storage area for increased hazardous waste which will be generated after expansion. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="text-align: justify; text-indent: -.25in; mso-list: l3 level1 lfo5;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">5.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The status of the CETP w.r.t the above said various decisions of the Board is as below:-</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 106%; mso-list: l5 level1 lfo6; margin: 0in 0in 8.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">a)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator has not made compliance with all the observations made by the NGT Monitoring Committee during visit made on 06.10.2018, 16.08.2019 and observations made by the officers of the Board dated 27.12.2019.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 106%; mso-list: l5 level1 lfo6; margin: 0in 0in 8.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">b)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP Operator has failed to comply with the various decisions taken during the personal hearing held before the Chairman of the Board on 11.09.2020.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 106%; mso-list: l5 level1 lfo6; margin: 0in 0in 8.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">c)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator was imposed bank guarantee amounting of Rs. 10 Lacs in the personal hearing held the Chairman of the Board on 27.05.2021 for not complying the decisions taken during the above said proceedings/visit of NGT Monitoring Committee; However, the CETP operator has not submitted the bank guarantee till date. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l5 level1 lfo6;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">d)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The operator has not submitted the Environmental Compensation to the Board till date, in compliance of the order dated 17.07.2021 or in pursuance of the order of the Hon&rsquo;ble Punjab &amp; Haryana High Court, Chandigarh dated 19.08.2021. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 106%; mso-list: l5 level1 lfo6; margin: 0in 0in 8.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">e)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator has failed to install EMF meters in compliance decisions of the hearing dated 11.09.2020 at all the components of the CETP till date. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 106%; mso-list: l5 level1 lfo6; margin: 0in 0in 8.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">f)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator has installed SCADA system in the process after secondary tube settler, RO feed, RO reject and final outlet; however, the same is not operational. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: normal; mso-list: l5 level1 lfo6; margin: 0in 0in 6.0pt .75in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">g)<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator is not giving its treated effluent to the dyeing industries for utilization. T<span style="mso-bidi-font-weight: bold;">he treated effluent of the CETP (RO permeate) is being supplied to NHAI for the irrigation of plantation provided alongwith the National Highway-05 i.e. Ludhiana to Chandigarh Highway upto Toll Barrier Samrala (26 Kilometers) and to Municipal Corporation, Ludhiana for sprinkling and gardening. </span></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong style="mso-bidi-font-weight: normal;"><u>Environmental Clearance</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">It is pertinent to mention here that the matter as to whether the CETP operator is required to obtain Environmental Clearance may also be decided and suitable conditions may be imposed. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><strong style="mso-bidi-font-weight: normal;"><u>Recommendation</u></strong><strong style="mso-bidi-font-weight: normal;">:-</strong></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">From above, it is evident that the CETP operator is not complying with the previous decisions taken during the various personal hearings held before the Chairman of the Board and has not deposited bank guarantee amounting to Rs. 10.00 Lacs and 50% Environmental Compensation imposed by the Board as per orders of the Hon'ble Punjab &amp; Haryana High Court, Chandigarh. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal" style="margin-bottom: 6.0pt; text-align: justify; line-height: normal;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;">As such, the <a name="_Hlk109654295"></a>Consent to Establish (NOC for expansion) under the Water (Prevention &amp; Control of Pollution) Act, 1974 and under the Air (Prevention &amp; Control of Pollution) Act, 1981 may be decided after considering following issues:-</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l4 level1 lfo7; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">1.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall comply with the decisions of the hearing held on 10.06.2022 and the proceedings of the same was issued vide Board letter no. 5471 dated 29.08.2022.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l4 level1 lfo7; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">2.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall obtain Environmental Clearance under the EIA notification 2006, if required and shall comply with the EIA notification 2006 as amended from time to time. </span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l4 level1 lfo7; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">3.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall ensure the proposed expansion is on ZLD system and the CETP operator shall not discharge treated/ untreated wastewater into sewer under any circumstances.<span style="mso-spacerun: yes;">&nbsp; </span></span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoHeader" style="text-align: justify; text-indent: -.25in; mso-list: l4 level1 lfo7; tab-stops: .5in center 3.0in right 6.0in; margin: 0in 0in 6.0pt .5in;"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span style="mso-list: Ignore;">4.<span style="font-style: normal; font-variant: normal; font-weight: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp; </span></span><!--[endif]-->The CETP operator shall submit plan regarding handling &amp; management of hazardous waste after proposed expansion and shall obtain authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.</span></p> <p><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"> </span></p> <p class="MsoNormal"><span style="font-family: verdana, geneva, sans-serif; font-size: 12pt;"><strong>The competency to decide the application lies with Hon&rsquo;ble Chairman of the Board.</strong></span></p>
Inspection: false
Inspection Note:
Officer: PPCB142
Reject: false
Reject Note:
Role: RO AEE Gurinderpal Singh