| File Note: |
<p><span style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px; background-color: #ffffff;">It is submitted that as per approved building plan dated 05.06.2014 the FAR area is 195644 Sqft (does not include basement and mumty) and the PP </span><span style="background-color: #ffffff; color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px;">has obtained consents from the Board for built up area of 195594.52 sq. meter (i.e. 18171.33 sqm).</span></p>
<p><span style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px; background-color: #ffffff;">However, as per the approved plan the total covered area is 217116.60 Sqft (including FAR area + basement + mumty). As such the total built up area should be calculated on the basis of covered area and as such the total builtup area of the project is 20170.8 Sqmt, which is greater than 200000 Sqmt and the project proponent was required to obtain prior Environmental Clearance under category 8b of the EPA notification dated 14.09.2006. However, the project proponent has not obtained Environmental Clearance as per record file of this office and has wrongly obtained consents from the Board for built up area of 195594.52 sq. meter (i.e. 18171.33 sqm). As such the above </span><span style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px; background-color: #ffffff;"> </span><span style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px; background-color: #ffffff;">amounts to violations under the EIA Notification, 2006.</span></p>
<p><span style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; text-indent: -24px; background-color: #ffffff;">Submitted please.</span></p> |