| File Note: |
<p class="MsoNormal" style="text-align: justify;"><span style="font-family: 'Verdana','sans-serif'; color: #2b4973; background: white;">Sir if approved, action as proposed by AEE (PBIP) be taken please with following amendments in additional conditions: </span></p>
<p class="MsoNormal" style="text-align: justify;"><span style="font-family: 'Verdana','sans-serif'; color: #2b4973; background: white;">Condition no. 7 is amended to the extent as under:</span></p>
<p class="MsoNormal" style="margin-left: .25in; text-align: justify; text-indent: -.25in;"><span style="font-family: 'Verdana','sans-serif'; color: #2b4973; background: white;"><span style="mso-spacerun: yes;"> </span>7. The industry will provide pipelines for carrying wastewater to be generated from cooling tower blow down and boiler blow down to ETP, within 15 da</span>ys.</p>
<p class="MsoNormal" style="margin-left: .25in; text-align: justify; text-indent: -.25in;"><span style="font-family: 'Verdana','sans-serif'; color: #2b4973; background: white;">Condition no. 12 may be deleted.</span></p>
<p class="MsoNormal" style="text-align: justify;"><span style="font-family: 'Verdana','sans-serif'; color: #2b4973; background: white;">12. The industry shall clean up the construction and demolition waste from the existing lagoon, in an environmentally sound manner, within two months.</span><span style="font-family: 'Verdana','sans-serif';"> </span></p> |