Show ApplicationProcessingDetails

Id: 20866021
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-01-12 11:46:07.239
File Note: <p>&nbsp;</p> <p class="MsoNoSpacing" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; text-indent: 70.9pt; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif';">It is intimated that the industry was earlier granted &lsquo;Consent to Operate&rsquo; under the Water (Prevention &amp; Control of Pollution) Act, 1974 vide no. CTOW/Fresh/SAS/2022/18798718 dated 21/06/2022 having validity upto 20.12.2022 under the Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. CTOA/Fresh/SAS/2022/18798150 dated 22/06/2022 having validity upto 21.12.2022 for manufacturing of Lead Alloy @ 7 Metric Tonnes/Day as production subject to suitable conditions mentioned therein.</span></p> <p class="MsoNoSpacing" style="margin: 0in 7.3pt 6pt 0in; text-align: justify; line-height: 24px;"><strong><u><span style="font-family: 'Bookman Old Style', 'serif';">Status of Passbook:</span></u></strong></p> <p class="MsoNoSpacing" style="margin: 0in 7.3pt 6pt 0in; text-align: justify; text-indent: 1in; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif';">The industry has uploaded a copy of Passbook for recycling of lead scrap/ Waste batteries @ 10 TPD/300 no./day, vide no. PPCB/ZP-I/2022/AVC/F-25 dated 07.11.2022, which is having validity upto&nbsp;<u>06.11.2027</u>.</span></p> <p class="MsoNoSpacing" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; text-indent: 9pt; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Now, the industry has applied for obtaining renewal of &lsquo;consent to operate&rsquo; under the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 with requisite documents and consent fee.</span></p> <p class="MsoNoSpacing" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; text-indent: 70.9pt; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif';">As per the record file, fee earlier deposited by the industry is already adequate upto 31.05.2042. Now, the industry has deposited Rs. 500/- vide R. no. 923505896 dated 23.12.2022 under the Water (Prevention &amp; Control of Pollution) Act, 1974 and Rs. 500/- vide R. no. 597943358 dated 23.12.2022 under the Air (Prevention &amp; Control of Pollution) Act, 1981, for both the Acts against the fixed assets of Rs. 31.58 lakhs on 22.11.2022.</span></p> <p class="MsoNoSpacing" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; text-indent: 70.9pt; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif';">It is submitted that while processing the online application, a clarification was raised on 29.12.2022 and the industry the industry has uploaded following undertaking are attached.</span></p> <p class="MsoNoSpacing" style="margin: 0in 7.3pt 6pt 0in; text-align: justify; line-height: 24px;"><strong><u><span style="font-size: 10.5pt; line-height: 21px; font-family: 'Bookman Old Style', 'serif';">Visit:</span></u></strong></p> <p>&nbsp;</p> <p class="MsoBodyText" style="margin: 5pt -3.5pt 6pt 0in; text-align: justify; text-indent: 1in; line-height: 24px;"><span style="font-size: 10.5pt; line-height: 21px;">The proposed site of the industry was visited by AEE of this office on 04.01.2023 and during visit it was observed as under:</span></p> <p class="MsoBodyText" style="margin: 0in -3.5pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry is engaged in recycling of lead batteries and was not in operation during the visit.</span></p> <p class="MsoBodyText" style="margin: 0in -3.5pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has installed 1 no. Temple type Blast furnace and has provided APCD to suppress air emission generated from the temple type furnace consisting of gas cooling cum settling chamber, 03 no. U-bend cooling tubes cyclone type dust collector, pulse jet bag filter house and alkaline scrubber along with stack of adequate height. The industry has installed proper sampling platforms and porthole with the chimney.</span></p> <p class="MsoBodyText" style="margin: 0in -3.5pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has provided 03 number separate storage spaces within the processing shed for storage of raw material, product and coal.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has also provided a separate storage room near the entrance of the unit for storage of Hazardous waste to be generated from the unit.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has not installed DG set in its premises.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has provided separate space for the breaking / dismantling of used batteries.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">7.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has installed ETP followed by pan evaporator for the treatment of any kind of effluent to be generated during the dismantling process of wet acid batteries. However, the representative of the industry informed that till date, they have not procured any wet acid battery and has procured only dry batteries for recycling purpose, as such no trade effluent has been generated till date.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">8.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry has constructed septic tank for the treatment of wastewater and the domestic effluent shall be discharged onto land for plantation (scanty) developed along the boundary wall, within its premises.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px; letter-spacing: -0.5pt;">9.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">The industry is complying with the conditions of NOC &amp; CTO granted to it.</span></p> <p class="MsoBodyText" style="margin: 0in -3.5pt 6pt 0.25in; text-align: justify; line-height: 24px;"><span lang="EN-IN" style="font-size: 3.5pt; line-height: 7px;">&nbsp;</span></p> <p class="MsoBodyText" style="margin: 0in -3.5pt 6pt 0in; text-align: justify; text-indent: 1in; line-height: 24px;"><span lang="EN-IN" style="font-size: 10.5pt; line-height: 21px;">Further, the compliance status of the SOP issue by the CPCB for secondary lead recycling units is given as under:</span></p> <p class="MsoListParagraph" style="margin-left: 0in;"><strong><span style="font-family: 'Bookman Old Style', 'serif';">SOP point 1. :&nbsp;</span></strong><span style="font-family: 'Bookman Old Style', 'serif';">Type of furnace installed (Rotary/ Mandir Bhatti)</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px;">a)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">Rotary furnace with suction hood connected with APCS over the charging point exists.</span></p> <p class="MsoBodyText" style="margin: 0in -9pt 0.0001pt 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="line-height: 24px;">b)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">Mandir Bhatti with suction hood connected with APCS over the charging point and molten metal tapping point exists.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance</strong><strong>&nbsp;Status:&nbsp;</strong><span style="line-height: 24px;">The industry has install Mandir Bhatti covered with hood connected to the air pollution control system. The hood has been placed over the charging point and molten metal tapping point.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 2.:&nbsp;</span></strong><span style="line-height: 24px;">Furnace connected with expansion chamber, cooling tubes/ ducts, cyclone/ Multi Cyclone, Bag filter with pulse jet/ mech</span><strong>a</strong><span style="line-height: 24px;">nical shaker arrangement, Alkaline Scrubber with arrangement of alkali dosing &amp; connected with ETP, INTENTIONALLY &amp; DELIBERATELY fan and stack of minimum 30 meter height as shown in the enclosed process flow sheet.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance Status:&nbsp;</strong><span style="line-height: 24px;">The industry has installed 1 no. Temple type furnace and having 2 no. Crucible for melting purpose. The industry has provided APCD to suppress air emission generated from the temple type furnace consisting of&nbsp;</span><span lang="EN-IN" style="line-height: 24px;">gas cooling cum settling chamber, 03 no. U-bend cooling tubes cyclone type dust collector, pulse jet bag filter house and alkaline scrubber along with stack of adequate height</span><span style="line-height: 24px;">. The industry has installed proper sampling platforms and porthole with the chimney.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 3. :</span></strong><span style="line-height: 24px;">&nbsp;Separate and secured covered space for storage of residue generated after recycling of lead bearing waste. The floor of the storage area should be impervious.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">Compliance Status:&nbsp;</span></strong><span style="line-height: 24px;">Provided separate space for storage of residue with concrete flooring.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 4.:&nbsp;</span></strong><span style="line-height: 24px;">Separate covered storage space for raw material having impervious acid proof flooring and finished products.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">Compliance Status:&nbsp;</span></strong><span lang="EN-IN" style="line-height: 24px;">The industry has designated separate space for the storage of raw material within the processing shed. The representative informed that an additional shed outside the main processing shed shall also be constructed shortly for the storage of the raw material i.e. used batteries.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 5.:&nbsp;</span></strong><span style="line-height: 24px;">ETP based on physico-chemical treatment of wastewater.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">Compliance Status:&nbsp;</span></strong><span style="line-height: 24px;">The industry has installed ETP consisting of&nbsp;</span><span style="line-height: 24px;">components&nbsp;as collection tank, Tube settler, MGF &amp; ACF, treated effluent collection tank.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 6.:&nbsp;</span></strong><span style="line-height: 24px;">Manual battery breaking area should have acid proof flooring with acid collection pit connected with ETP.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">Compliance Status:&nbsp;</span></strong><span style="line-height: 24px;">The representative of the industry informed that primarily they will procure only dry batteries (carrying no acid). Still, the industry has provided acid collection pit in the manual battery breaking area to collect the miniscule quantity of left over acid, if any, generated during battery breaking. The tank is connected to the inlet of ETP.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 7.:&nbsp;</span></strong><span style="line-height: 24px;">Each stack should have a port-hole (as per specification given in CPCB document COINDS-III_ with platform for stack monitoring. There should be an easy ladder for safe access to stack monitoring platform.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">Compliance Status:&nbsp;</span></strong><span lang="EN-IN" style="line-height: 24px;">Complied<strong>.</strong></span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 8.:&nbsp;</span></strong><span style="line-height: 24px;">Battery-Breaking Process: After draining the acid there are two modes of dismantling/ breaking of batteries before battery plates are processed for smelting. The first mode is manual where the battery is cut from the top, plates are removed and left over acid is drained. The second mode is where the battery is mechanically broken along with the casing.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance Status:&nbsp;</strong><span style="line-height: 24px;">Manual breaking process is being adopted by the industry.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 9.:&nbsp;</span></strong><span style="line-height: 24px;">The facilities required for manual dismantling include suction hood, connected to the pollution control device, arrangement for washing of the plastic components before being sent for recycling and acidic water neutralization facility. All the facilities with capacity more than 5000 MTA should install mechanical/ automatic.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance Status:&nbsp;</strong><span style="line-height: 24px;">The production capacity of the industry is less than 5000 MTA. Therefore,&nbsp;&nbsp;NA.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 10.:&nbsp;</span></strong><span style="line-height: 24px;">Facilities required for mechanical/ automatic breaking include arrangements for noise control and dust and fume extraction system and acidic collection/ neutralization facilities and ETP for treatment of lead and acidic wastewater.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance Status:&nbsp;</strong><span style="line-height: 24px;">NA, as per point no. 9.</span></p> <p class="MsoBodyText" style="margin: 12pt -9pt 0.0001pt 0in; text-align: justify; line-height: 24px;"><strong><span lang="EN-IN" style="line-height: 24px;">SOP point 11.:&nbsp;</span></strong><span style="line-height: 24px;">Adequate facilities for collection and storage of ETP sludge and slags.</span></p> <p class="MsoBodyText" style="margin-right: -9pt; text-align: justify; line-height: 24px;"><strong>Compliance Status:&nbsp;</strong><span style="line-height: 24px;">The industry has provided one hazardous waste storage room within its premises.</span></p> <p class="MsoNormal" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; line-height: 24px;"><strong><u><span style="font-size: 1pt; line-height: 2px; font-family: 'Bookman Old Style', 'serif';">&nbsp;</span></u></strong></p> <p class="MsoNormal" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; line-height: 24px;"><strong><u><span style="font-family: 'Bookman Old Style', 'serif';">Recommendations:</span></u></strong></p> <p class="MsoListParagraphCxSpFirst" style="margin: 0in 0.2pt 12pt 0in; text-align: justify; text-indent: 14.2pt; line-height: 24px;"><span style="font-family: 'Bookman Old Style', 'serif'; color: red;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span><span style="color: red;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span><span style="font-family: 'Bookman Old Style', 'serif';">In view of above, if may approved, the industry may be granted renewal of Consent to operate&rsquo; may under the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981, upto&nbsp;30.09.2027&nbsp;subject&nbsp;<span style="letter-spacing: -3.6pt;">&nbsp;</span>to suitable<span style="letter-spacing: -0.05pt;">&nbsp;</span>conditions and following additional conditions:</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in 0.2pt 12pt 0in; text-align: justify; text-indent: 14.2pt; line-height: 24px;"><span style="font-size: 4pt; line-height: 8px; font-family: 'Bookman Old Style', 'serif';">&nbsp;</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in -9pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px; background: white;"><span style="font-family: 'Bookman Old Style', 'serif';">i.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: 'Bookman Old Style', 'serif';">The industry shall maintain the record of receiving of used battery from the different states and quantity of product (i.e. lead recovery) and submit the same in the Regional office on monthly basis.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in -9pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px; background: white;"><span style="font-family: 'Bookman Old Style', 'serif';">ii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: 'Bookman Old Style', 'serif';">The industry shall comply with the standard operating procedure (SOP) framed by the CPCB for battery recycling units, at all times.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in -9pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px; background: white;"><span style="font-family: 'Bookman Old Style', 'serif';">iii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: 'Bookman Old Style', 'serif';">The industry shall break/ dismantle used batteries in scientific ways.</span></p> <p class="MsoListParagraphCxSpLast" style="margin: 0in -9pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px; background: white;"><span style="font-family: 'Bookman Old Style', 'serif';">iv.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: 'Bookman Old Style', 'serif';">The industry shall submit the ambient air quality report as well as stack emission report from the Board&rsquo;s lab / Board&rsquo;s approved lab once in a year.</span></p> <p class="MsoBodyText" style="margin: 0in 5.85pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px;"><span style="line-height: 24px;">v.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">The project proponent shall not discharge any effluent at any unauthorized place by any unauthorized means i.e. shall not discharge any wastewater in any drain / inland surface waters / drain/choe/nallah/ onto land for stagnation or outside its premises, at any time, under any circumstances.</span></p> <p class="MsoBodyText" style="margin: 0in 5.85pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px;"><span style="line-height: 24px;">vi.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">The industry shall ensure that the activities of unit does not create any nuisance in the surrounding areas and no public complaints are received</span></p> <p class="MsoBodyText" style="margin: 0in 5.85pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px;"><span style="line-height: 24px;">vii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">The Consent is being issued to the industry based upon the documents/ information submitted by it alongwith the online application form. The Board would be at liberty to take penal action against the industry and its responsible/ concerned person(s) in case information/document is detected as incorrect/false/misleading at any point of time.</span></p> <p class="MsoBodyText" style="margin: 0in 0.2pt 0.0001pt 27pt; text-align: justify; text-indent: -27pt; line-height: 24px;"><span style="line-height: 24px;">viii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="line-height: 24px;">In case the industry fails to comply with the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974, Air (Prevention &amp; Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to the project and Rules, Circulars &amp; Directions issued by the Board from time to time, action as deemed fit shall be taken against the industry.</span></p> <p class="MsoBodyText" style="margin: 0in 0.2pt 0.0001pt 27pt; text-align: justify; text-indent: -22.5pt; line-height: 24px;"><span style="line-height: 24px;">&nbsp;</span></p> <p class="MsoBodyText" style="margin: 0in 0.2pt 0.0001pt 13.5pt; text-align: justify; text-indent: -9pt; line-height: 24px;"><span style="line-height: 24px;">&nbsp;</span></p> <p class="MsoBodyText" style="margin: 0in 0.2pt 0.0001pt 13.5pt; text-align: justify; text-indent: -9pt; line-height: 24px;"><span style="line-height: 24px;">&nbsp;</span></p> <p class="MsoBodyText" style="margin-right: 0.2pt; text-align: justify; line-height: 24px;"><span style="font-size: 10.5pt; line-height: 21px;">&nbsp;</span></p> <p class="MsoBodyText" style="margin-right: 0.2pt; text-align: justify; line-height: 24px;"><span style="font-size: 10.5pt; line-height: 21px;">&nbsp;</span></p> <p class="MsoNoSpacing" style="margin: 0in 0.2pt 6pt 0in; text-align: justify; text-indent: 70.9pt; line-height: 24px;">&nbsp;</p> <p class="MsoBodyText" style="margin-right: 0.2pt; text-align: justify; line-height: 24px;"><span style="font-size: 10.5pt; line-height: 21px; color: red;">&nbsp;</span></p> <p>&nbsp;</p>
Inspection: false
Inspection Note:
Officer: PPCB128
Reject: false
Reject Note:
Role: RO AEE Arshdeep Singh