Show ApplicationProcessingDetails

Id: 20964735
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-01-23 17:03:42.039
File Note: <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">It is submitted that the industry was granted Consent to Operate under the Water (Prevention &amp; Control of Pollution) Act, 1974 vide no. <strong>CTOW/Varied/PTA/2021/14814243</strong> dated <strong>15.01.2021</strong> having validity upto <strong>30.09.2030</strong> for discharge of domestic effluent @ 1.5 KLD onto land for plantation after treated in septic tank and under the Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. <strong>CTOA/Varied/PTA/2021/14813858</strong> dated <strong>15.01.2021</strong> having validity upto <strong>30.09.2030</strong> for production of <strong>Rice @ 1.0 T/hour by processing of Paddy @ 1.5 T/hour</strong> as raw material (with drier) under red category subject to certain conditions as mentioned therein.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Thereafter, the industry was granted NOC for expansion for the processing of Paddy@ 4.5 TPH to manufacture Rice @ 3.0 TPH (with drier) under the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. <strong>CTE/Exp/PTA/2022/19195093</strong> dated <strong>12.07.2022</strong> valid upto <strong>02/07/2023 </strong>and discharge of domestic effluent @ 1.5 KLD, subject to certain conditions as mentioned therein.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Now, the industry has applied for varied consent to operate under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 for the manufacturing of <strong>Rice @ 3.0 T/hour </strong>by processing of <strong>Paddy @ 4.5 T/hour, (with drier) and discharge of domestic effluent @ 1.5 KLD</strong> under orange category along with requisite documents. The industry has deposited <strong>Rs. 12800/- vide online receipt no. <span style="mso-spacerun: yes;">&nbsp;</span>732406845 dated 02.01.2023</strong> as consent fee under Water (Prevention and Control of Pollution) Act, 1974 and <strong>Rs. 12800/- vide online receipt no. 491161743 dated 02.01.2023</strong> as consent fee under Air (Prevention and Control of Pollution) Act, 1981. The industry also deposited <strong>Rs. 360/-</strong> <strong>vide online receipt no.<span style="mso-spacerun: yes;">&nbsp; </span>732406845 dated 02.01.2023</strong> as penalty charges under Water (Prevention and Control of Pollution) Act, 1974 and <strong>Rs. 360/- vide online receipt no. 491161743 dated 02.01.2023</strong> as penalty charges under Air (Prevention and Control of Pollution) Act, 1981. Therefore, the total consent fee deposited by the industry is adequate upto <strong>30.09.2032</strong> against the fixed assets of <strong>Rs. 67.32</strong> lakh as on 30.11.2022 as per CA certificate dated 15.12.2022 submitted by the industry. <span style="mso-spacerun: yes;">&nbsp;</span>The industry has submitted NOC compliance report of consent conditions earlier granted to it. </span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 4.5pt; line-height: normal;"><strong><u><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Completion Certificate of APCD:-</span></u></strong></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 4.5pt; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-fareast-font-family: 'Times New Roman'; mso-fareast-theme-font: minor-fareast; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; mso-bidi-language: PA;">The industry has submitted Completion Certificate w.r.t APCD installed with the shelling section from Terrasvn Initiatives, SCF-29, SST Nagara, Rajpura Road, Patiala</span><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"> <span style="mso-spacerun: yes;">&nbsp;</span></span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; line-height: normal;"><strong><u><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Approved building plan:-</span></u></strong></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The industry has also submitted building plan approved from competent person of Director of Factories under Punjab Factory Act Rule, 1948.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; line-height: normal;"><strong><u><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Undertaking:-</span></u></strong></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: 1.0in; background: white;"><span style="font-size: 12.0pt; line-height: 106%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The rice sheller has submitted letter dated 31.12.2022, which is reproduced as under: </span></p> <p class="MsoNormal" style="text-align: justify; background: white;"><em><span style="font-size: 12.0pt; line-height: 106%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-spacerun: yes;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>I, </span></em><strong style="mso-bidi-font-weight: normal;"><span style="font-size: 12.0pt; line-height: 106%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Ram Paul,</span></strong><span style="font-size: 12.0pt; line-height: 106%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"> Partner of the firm, want to state as under :-</span></p> <p class="MsoListParagraphCxSpFirst" style="margin-bottom: .0001pt; mso-add-space: auto; text-indent: -.25in; line-height: normal; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That varied consents under the Air Act, 1981 &amp; Water Act, 1974 were granted<span style="mso-spacerun: yes;">&nbsp; </span>on dt. 15/01/2021,<span style="mso-spacerun: yes;">&nbsp;&nbsp; </span>which are valid up to 30/09/2030 for<span style="mso-spacerun: yes;">&nbsp; </span>processing of<span style="mso-spacerun: yes;">&nbsp; </span><strong style="mso-bidi-font-weight: normal;">Paddy @ 1.5 T/hr. </strong>to manufacture <strong style="mso-bidi-font-weight: normal;">Dry Rice @ 1.0 T/hr. </strong>(with Drier).</span></p> <p class="MsoListParagraphCxSpLast" style="margin-bottom: .0001pt; mso-add-space: auto; text-indent: -.25in; line-height: normal; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That the NOC for expansion was granted<span style="mso-spacerun: yes;">&nbsp; </span>to<span style="mso-spacerun: yes;">&nbsp; </span>us on <span style="mso-spacerun: yes;">&nbsp;</span>dated<span style="mso-spacerun: yes;">&nbsp; </span>12/07/2022, valid up to 02/07/2023 for<span style="mso-spacerun: yes;">&nbsp; </span>processing of<span style="mso-spacerun: yes;">&nbsp; </span><strong style="mso-bidi-font-weight: normal;">Paddy @ 4.5 T/hr. </strong>to manufacture <strong style="mso-bidi-font-weight: normal;">Dry Rice @ 3.0 T/hr.</strong></span></p> <ol style="margin-top: 0in;" start="3" type="1"> <li class="MsoNormal" style="margin-bottom: .0001pt; line-height: normal; mso-list: l0 level1 lfo1;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That expanded capacity of our sheller came into working in the month of December, 2022. </span></li> <li class="MsoNormal" style="margin-bottom: .0001pt; line-height: normal; mso-list: l0 level1 lfo1;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That as on 30/11/2022, the Gross <span style="mso-spacerun: yes;">&nbsp;</span>value <span style="mso-spacerun: yes;">&nbsp;</span>of <span style="mso-spacerun: yes;">&nbsp;</span>fixed <span style="mso-spacerun: yes;">&nbsp;</span>assets <span style="mso-spacerun: yes;">&nbsp;</span>of <span style="mso-spacerun: yes;">&nbsp;</span>the firm is at <span style="mso-spacerun: yes;">&nbsp;</span>Rs. 67.32 lacs. (Land : Rs. 20.68 lacs, <span style="mso-spacerun: yes;">&nbsp;</span>Building : Rs. 14.22 lacs and Plant &amp; Machinery : Rs. 32.42). </span></li> <li class="MsoNormal" style="margin-bottom: .0001pt; line-height: normal; mso-list: l0 level1 lfo1;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That Approved Building Plans from Competent Person enclosed herewith.</span></li> </ol> <p class="MsoListParagraph"><span lang="EN-IN" style="font-size: 12.0pt; line-height: 115%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <ol style="margin-top: 0in;" start="6" type="1"> <li class="MsoNormal" style="margin-bottom: .0001pt; line-height: normal; mso-list: l0 level1 lfo1;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That completion certificate of APCD enclosed herewith.</span></li> <li class="MsoNormal" style="margin-bottom: .0001pt; line-height: normal; mso-list: l0 level1 lfo1;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">That we are depositing online Rs. 52,500/- towards Air Consent<span style="mso-spacerun: yes;">&nbsp; </span>fee :Rs. 12,800/-, Water Consent<span style="mso-spacerun: yes;">&nbsp; </span>fee : Rs. 12,800/-, Application Form fee : Rs. 500/-, Penalty Charges (Air Consent): Rs. 360/- and<span style="mso-spacerun: yes;">&nbsp; </span>Penalty Charges (Water Consent) : Rs. 360/-, adequate up to 30/09/2032.</span></li> </ol> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-fareast-font-family: 'MS Mincho'; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoListParagraphCxSpFirst" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The industry was visited by AEE of this office on 16.1.2023<span style="color: red;"> </span>. During visit, it was observed as under: </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">1. The industry was not in operation due to off season. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">2. The industry has installed cyclone as APCD with the pre-cleaner of the drier section and separate cyclone with the milling section to control process emissions. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">3. The industry has provided paved / brick roads inside their premises for movement of vehicles, so as to prevent the generation of dust. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">4. The industry has provided brick wall of about 10' height approximately and wind screen of 5 ft. height over it as per latest code of practice in the husk disposal area so as to maintain a free Board of 3.5 ft. above the discharge point of rice husk. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">5. The industry has provided septic tank for the treatment of domestic effluent generated from its premises and the treated domestic effluent was being utilized onto land for plantation along the boundary of the unit. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">6. The industry has submitted the analysis report stack emission and drier with pre-cleaner from private lab and the analysis results is found with the prescribed limits of the Board. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: normal;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">7. The industry has not installed any DG set within its premises. The industry is complying with the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981.</span></p> <p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; line-height: normal; margin: 0in 0in .0001pt 13.5pt;"><span lang="EN-IN" style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Hence, the industry is <span style="mso-spacerun: yes;">&nbsp;</span>also complying with new code of practice notified by Govt. Notification no. 10/48/2004-STE (4) /932 dated 15/10/2013 and the conditions of NOC expansion granted to it.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">&nbsp;</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The industry is complying with the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: normal; mso-layout-grid-align: none; text-autospace: none;"><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Keeping above in view, it is recommended that <strong>varied</strong> consent to operate under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 may be granted to the industry upto <strong>30.09.2032</strong> for the manufacturing of <strong>Rice @ 3.0 T/hour </strong>by processing of <strong>Paddy @ 4.5 T/hour (with drier) and discharge of domestic effluent @ 1.5 KLD</strong> under orange category as per policy of the Board.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; line-height: normal;"><strong><span style="font-size: 12.0pt; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">(Competency: EE, RO, PTA)</span></strong></p>
Inspection: false
Inspection Note:
Officer: PPCB151
Reject: false
Reject Note:
Role: RO AEE Sachin Singla