Show ApplicationProcessingDetails

Id: 21004952
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-01-28 14:15:19.299
File Note: <p>1} As pointed by EE, ZO......besides giving classification of area and providing requiste certificate from concerned authority, RO to check</p> <p>i).&nbsp; &nbsp;In one of the process, powder is sprinkled while mfg. tubes and lot of dust emissions are generated. What arrangements industry has made to control the same.</p> <p>ii).&nbsp; As industry has 3TPH boiler and if it is operated for 8 hr, water requirement for boiler alone will be 24 KLD. Whereas industry has filled only 6 KL of water for all purposes.&nbsp;&nbsp;In case indirect steam through coil system is being used, then condensate recovery status is required to be provided.&nbsp;</p> <p>iii) If (ii) is not applicable, then quantity of steam lose, higher water consumption from boiler section and&nbsp; possibility of condensate going to drain will be there.&nbsp;</p> <p>iv) In addition to&nbsp; waste condensate, boiler blow down is also likely to be generated from boiler section. Further, after tube making, it is dipped in water for checking leakage specifically valve/ tuti leakage. After some time the waste water from here is to be discargded. Likewise, purge waste water from cooling/&nbsp; recirculation may also be there. Therefore, we can't say that TE is nil.</p> <p>RO to check and report through return reply</p>
Inspection: false
Inspection Note:
Officer: PPCB032
Reject: false
Reject Note:
Role: ZO SEE R K Ratra