Show ApplicationProcessingDetails

Id: 21039606
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-02-01 12:27:43.267
File Note: <p class="TableParagraph" style="margin: 0.05pt 2.3pt 0.0001pt 6.55pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">The industry is a rice sheller unit and was granted CTOs under the Water Act,<span style="letter-spacing: 0.05pt;">&nbsp;</span>1974<span style="letter-spacing: 0.05pt;">&nbsp;</span>vide<span style="letter-spacing: 0.05pt;">&nbsp;</span>no.<span style="letter-spacing: 0.05pt;">&nbsp;</span>CTOW/Fresh/SGR/2021/16934737<span style="letter-spacing: 0.05pt;">&nbsp;</span>and<span style="letter-spacing: 0.05pt;">&nbsp;</span>the<span style="letter-spacing: 0.05pt;">&nbsp;</span>Air<span style="letter-spacing: 0.05pt;">&nbsp;</span>Act,<span style="letter-spacing: 0.05pt;">&nbsp;</span>1981<span style="letter-spacing: 0.05pt;">&nbsp;</span>vide<span style="letter-spacing: 0.05pt;">&nbsp;</span>no.<span style="letter-spacing: 0.05pt;">&nbsp;</span>CTOA/Fresh/SGR/2021/16934640<span style="letter-spacing: 0.05pt;">&nbsp;</span>both<span style="letter-spacing: 0.05pt;">&nbsp;</span>dated<span style="letter-spacing: 0.05pt;">&nbsp;</span>29.09.2021<span style="letter-spacing: 0.05pt;">&nbsp;</span>and<span style="letter-spacing: 0.05pt;">&nbsp;</span>both<span style="letter-spacing: 0.05pt;">&nbsp;</span>valid<span style="letter-spacing: 0.05pt;">&nbsp;</span>upto<span style="letter-spacing: 0.05pt;">&nbsp;</span>30.09.2026 for the manufacturing of Sorted raw rice @ 5.0 TPH without dryer using<span style="letter-spacing: 0.05pt;">&nbsp;</span>paddy<span style="letter-spacing: -0.05pt;">&nbsp;</span>@<span style="letter-spacing: -0.05pt;">&nbsp;</span>7.5 TPH,<span style="letter-spacing: 0.15pt;">&nbsp;</span>as<span style="letter-spacing: -0.05pt;">&nbsp;</span>raw<span style="letter-spacing: 0.75pt;">&nbsp;</span>material.</span></p> <p class="TableParagraph" style="margin: 0.2pt 2.25pt 0.0001pt 6.55pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">Thereafter, the industry had obtained NOC(expansion) from the Board vide CTE/Exp/SGR/2022/19652481 dated 01.09.2022 valid upto 31.08.2023 to install mechanical dryer and boiler plant to<span style="letter-spacing: 0.05pt;">&nbsp;</span>produce Sorted raw rice with dryer @ 5.0 TPH and Steamed rice @ 2.0 TPH by using<span style="letter-spacing: 0.05pt;">&nbsp;</span>Paddy @ 10.5 TPH after expansion.</span></p> <p class="TableParagraph" style="margin: 0.2pt 2.25pt 0.0001pt 6.55pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">Now, the industry has installed the proposed plant &amp; machinery and accordingly, has applied for obtaining varied consents under the Water (Prevention and Control of Pollution) Act, 1974&nbsp;&nbsp;and the Air (Prevention and Control of Pollution) Act, 1981 for the manufacturing of Sorted raw rice with dryer @ 5.0 TPH and Steamed rice @ 2.0 TPH by using Paddy @ 10.5 TPH as raw material.</span></p> <p class="TableParagraph" style="margin: 0.2pt 2.25pt 0.0001pt 6.55pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">The consent fee deposited by the industry under the Water Act, 1974 and the Air Act, 1981 as per serial no. (vii) is adequate&nbsp;<strong>upto 30.09.2032</strong>, against the value of fixed assets i.e. Rs. 290.06 Lacs as on 31.12.2022, as per CA cert. 03.01.2023.</span></p> <p class="TableParagraph" style="margin: 0.1pt 2.9pt 0.0001pt 6.55pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">To verify the compliance of consent conditions earlier granted to the industry &amp;<span style="letter-spacing: -2.65pt;">&nbsp;</span>the code of practice, the industry was visited by undersigned on 31.01.2023 and it<span style="letter-spacing: 0.05pt;">&nbsp;</span>was<span style="letter-spacing: -0.05pt;">&nbsp;</span>observed<span style="letter-spacing: -0.05pt;">&nbsp;</span>as under:-</span></p> <p class="TableParagraph" style="margin: 0.05pt 0cm 0.0001pt 29.7pt; text-indent: -15.25pt;"><span lang="EN-US">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The<span style="letter-spacing: -0.1pt;">&nbsp;</span>industry<span style="letter-spacing: -0.1pt;">&nbsp;</span>was<span style="letter-spacing: -0.1pt;">&nbsp;found&nbsp;</span>in<span style="letter-spacing: -0.1pt;">&nbsp;</span>operation.</span></p> <p class="TableParagraph" style="margin: 2pt 2.35pt 0.0001pt 28.75pt; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The<span style="letter-spacing: 2.45pt;">&nbsp;</span>industry<span style="letter-spacing: 2.6pt;">&nbsp;</span>has<span style="letter-spacing: 2.25pt;">&nbsp;</span>installed<span style="letter-spacing: 2.35pt;">&nbsp;all the proposed&nbsp;</span>plant<span style="letter-spacing: 2.35pt;">&nbsp;</span>&amp;<span style="letter-spacing: 2.45pt;">&nbsp;</span>machinery<span style="letter-spacing: 2.3pt;">&nbsp;</span>for<span style="letter-spacing: 2.55pt;">&nbsp;</span>the<span style="letter-spacing: 2.35pt;">&nbsp;</span>expansion<span style="letter-spacing: -2.6pt;">&nbsp;</span>project as per the NOC obtained.</span></p> <p class="TableParagraph" style="margin: 2pt 2.35pt 0.0001pt 28.75pt; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided multi-cyclone as APCD with boiler of<span style="letter-spacing: -0.1pt;">&nbsp;</span>capacity<span style="letter-spacing: -0.05pt;">&nbsp;</span>4.0<span style="letter-spacing: 0.05pt;">&nbsp;</span>TPH.</span></p> <p class="TableParagraph" style="margin: 2pt 2.35pt 0.0001pt 28.75pt; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided separate cyclone as APCD with new<span style="letter-spacing: 0.05pt;">&nbsp;</span>dryers<span style="letter-spacing: -0.05pt;">&nbsp;</span>of capacity<span style="letter-spacing: -0.05pt;">&nbsp;</span>24.0 TPH,<span style="letter-spacing: -0.1pt;">&nbsp;</span>each.</span></p> <p class="TableParagraph" style="margin-left: 29.7pt; text-indent: -15.25pt;"><span lang="EN-US">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The<span style="letter-spacing: -0.15pt;">&nbsp;</span>industry<span style="letter-spacing: -0.15pt;">&nbsp;</span>has<span style="letter-spacing: -0.15pt;">&nbsp;</span>already<span style="letter-spacing: -0.15pt;">&nbsp;</span>covered<span style="letter-spacing: -0.15pt;">&nbsp;</span>all<span style="letter-spacing: -0.1pt;">&nbsp;</span>the<span style="letter-spacing: -0.2pt;">&nbsp;</span>processing<span style="letter-spacing: -0.2pt;">&nbsp;</span>sheds.</span></p> <p class="TableParagraph" style="margin: 1.9pt 3.05pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided brick paved road from main gate of the industry to the<span style="letter-spacing: 0.05pt;">&nbsp;</span>rice room/husk area for<span style="letter-spacing: 0.05pt;">&nbsp;</span>the movements of<span style="letter-spacing: -0.05pt;">&nbsp;</span>vehicles.</span></p> <p class="TableParagraph" style="margin: 0cm 2.65pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">7.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has installed cyclone as APCD along with stack of adequate height to<span style="letter-spacing: 0.05pt;">&nbsp;</span>control the process emissions from shelling section. All the dust emitting points<span style="letter-spacing: 0.05pt;">&nbsp;</span>are connected to the cyclones and provided sampling arrangements for collection<span style="letter-spacing: 0.05pt;">&nbsp;</span>of stack<span style="letter-spacing: -0.05pt;">&nbsp;</span>emission sample.</span></p> <p class="TableParagraph" style="margin: 0.05pt 2.95pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">8.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">&nbsp;&nbsp;The industry has provided brick wall of 10 feet height in front of the discharge<span style="letter-spacing: 0.05pt;">&nbsp;</span>point of rice husk area and the length of aforesaid brick wall is 35' on each side of<span style="letter-spacing: 0.05pt;">&nbsp;</span>the rice<span style="letter-spacing: 0.05pt;">&nbsp;</span>husk<span style="letter-spacing: -0.05pt;">&nbsp;</span>discharge<span style="letter-spacing: 0.05pt;">&nbsp;</span>point.</span></p> <p class="TableParagraph" style="margin: 0cm 2.5pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">9.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided jalli of 5 feet height above the brick wall in front<span style="letter-spacing: 0.05pt;">&nbsp;</span>of<span style="letter-spacing: 0.05pt;">&nbsp;</span>the<span style="letter-spacing: 0.05pt;">&nbsp;</span>discharge<span style="letter-spacing: 0.05pt;">&nbsp;</span>point<span style="letter-spacing: 0.05pt;">&nbsp;</span>of<span style="letter-spacing: 0.05pt;">&nbsp;</span>rice<span style="letter-spacing: 0.05pt;">&nbsp;</span>husk<span style="letter-spacing: 0.05pt;">&nbsp;</span>area.</span></p> <p class="TableParagraph" style="margin: 0cm 2.7pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">10.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has no source of trade effluent generation and the industry has<span style="letter-spacing: 0.05pt;">&nbsp;</span>provided<span style="letter-spacing: 0.05pt;">&nbsp;</span>septic<span style="letter-spacing: 0.05pt;">&nbsp;</span>tank<span style="letter-spacing: 0.05pt;">&nbsp;</span>for<span style="letter-spacing: 0.05pt;">&nbsp;</span>treatment<span style="letter-spacing: 0.05pt;">&nbsp;</span>of<span style="letter-spacing: 0.05pt;">&nbsp;</span>domestic<span style="letter-spacing: 0.05pt;">&nbsp;</span>effluent<span style="letter-spacing: 0.05pt;">&nbsp;</span>to<span style="letter-spacing: 0.05pt;">&nbsp;</span>be<span style="letter-spacing: 0.05pt;">&nbsp;</span>generated<span style="letter-spacing: 0.05pt;">&nbsp;</span>from<span style="letter-spacing: -2.65pt;">&nbsp;</span>toilets / washrooms. It has also made plantation along boundary wall to utilize<span style="letter-spacing: 0.05pt;">&nbsp;</span>treated<span style="letter-spacing: -0.1pt;">&nbsp;</span>domestic effluent after<span style="letter-spacing: -0.05pt;">&nbsp;</span>septic<span style="letter-spacing: 0.05pt;">&nbsp;</span>tank.</span></p> <p class="TableParagraph" style="margin-right: 2.7pt; text-align: justify; line-height: 18.4px;"><span lang="EN-US">&nbsp;</span></p> <p class="TableParagraph" style="margin: 0cm 2.75pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">11.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">There will be a generation of small quantity waste water in the form of boiler blow<span style="letter-spacing: -2.65pt;">&nbsp;</span>down, which will be utilized for ash quenching as well as sprinkling purposes for<span style="letter-spacing: 0.05pt;">&nbsp;</span>dust<span style="letter-spacing: -0.05pt;">&nbsp;</span>separation.</span></p> <p class="TableParagraph" style="margin: 0cm 2.75pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">12.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has not installed Parboiled section in its unit.</span></p> <p class="TableParagraph" style="margin: 0cm 2.75pt 0.0001pt 28.75pt; text-align: justify; text-indent: -14.3pt; line-height: 18.4px;"><span lang="EN-US">13.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has not constructed any building in the range of high tension 220 KVA as per the guidelines of the PSPCL authorities &amp; comply with the PSPCL guidelines w.r.t. high tension zone for the construction of the building.</span></p> <p class="MsoBodyText" style="margin: 3.55pt 9.4pt 0.0001pt 14.05pt; text-align: justify; text-indent: 14.2pt;"><span lang="EN-US">As above, the industry is complying with the code of practices prescribed for<span style="letter-spacing: 0.05pt;">&nbsp;</span>such<span style="letter-spacing: -0.05pt;">&nbsp;</span>type<span style="letter-spacing: 0.05pt;">&nbsp;</span>of units.</span></p> <h1 style="line-height: 12.85pt;"><span lang="EN-US">Air<span style="letter-spacing: -0.25pt;">&nbsp;</span>pollution<span style="letter-spacing: -0.25pt;">&nbsp;</span>and<span style="letter-spacing: -0.25pt;">&nbsp;</span>its<span style="letter-spacing: -0.1pt;">&nbsp;</span>measurements:</span></h1> <p class="MsoListParagraph" style="margin-right: 9.65pt;"><span lang="EN-US">a)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided multi-cyclone as APCD with boiler of<span style="letter-spacing: -0.1pt;">&nbsp;</span>capacity<span style="letter-spacing: -0.05pt;">&nbsp;</span>4.0<span style="letter-spacing: 0.05pt;">&nbsp;</span>TPH.</span></p> <p class="MsoListParagraph" style="margin-right: 9.9pt;"><span lang="EN-US">b)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has provided separate cyclone as APCD with new<span style="letter-spacing: 0.05pt;">&nbsp;</span>dryers<span style="letter-spacing: -0.05pt;">&nbsp;</span>of capacity<span style="letter-spacing: -0.05pt;">&nbsp;</span>24.0 TPH,<span style="letter-spacing: -0.1pt;">&nbsp;</span>each.</span></p> <h1><span lang="EN-US">Water<span style="letter-spacing: -0.35pt;">&nbsp;</span>pollution<span style="letter-spacing: -0.2pt;">&nbsp;</span>and its<span style="letter-spacing: -0.3pt;">&nbsp;</span>measurements:</span></h1> <p class="MsoListParagraph" style="margin-right: 10.05pt;"><span lang="EN-US">a)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">There is no trade effluent to be generated from the proposed process and<span style="letter-spacing: 0.05pt;">&nbsp;</span>hence,<span style="letter-spacing: -0.05pt;">&nbsp;</span>no<span style="letter-spacing: -0.05pt;">&nbsp;</span>treatment<span style="letter-spacing: -0.05pt;">&nbsp;</span>plant has<span style="letter-spacing: -0.05pt;">&nbsp;</span>been<span style="letter-spacing: -0.05pt;">&nbsp;</span>installed.</span></p> <p class="MsoListParagraph" style="margin-right: 7.25pt;"><span lang="EN-US">b)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry has already provided septic tank for treatment of domestic effluent<span style="letter-spacing: -2.65pt;">&nbsp;</span>generated from toilets / washrooms. It has also made plantation along boundary<span style="letter-spacing: -2.65pt;">&nbsp;</span>wall<span style="letter-spacing: -0.05pt;">&nbsp;</span>to<span style="letter-spacing: -0.05pt;">&nbsp;</span>utilize<span style="letter-spacing: 0.05pt;">&nbsp;</span>treated<span style="letter-spacing: -0.1pt;">&nbsp;</span>domestic<span style="letter-spacing: 0.05pt;">&nbsp;</span>effluent<span style="letter-spacing: -0.15pt;">&nbsp;</span>after<span style="letter-spacing: -0.1pt;">&nbsp;</span>septic<span style="letter-spacing: 0.05pt;">&nbsp;</span>tank.</span></p> <p class="MsoListParagraph"><span lang="EN-US">c)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The small<span style="letter-spacing: 2.15pt;">&nbsp;</span>quantity of<span style="letter-spacing: 1.95pt;">&nbsp;</span>waste<span style="letter-spacing: 2.05pt;">&nbsp;</span>water<span style="letter-spacing: 2.15pt;">&nbsp;</span>in<span style="letter-spacing: 2pt;">&nbsp;</span>the<span style="letter-spacing: 2.15pt;">&nbsp;</span>form<span style="letter-spacing: 2.2pt;">&nbsp;</span>of<span style="letter-spacing: 2pt;">&nbsp;</span>boiler<span style="letter-spacing: -2.65pt;">&nbsp;</span>blow<span style="letter-spacing: 0.05pt;">&nbsp;</span>down,<span style="letter-spacing: 0.05pt;">&nbsp;</span>is being<span style="letter-spacing: 0.05pt;">&nbsp;</span>utilized<span style="letter-spacing: 0.05pt;">&nbsp;</span>for<span style="letter-spacing: 0.05pt;">&nbsp;</span>ash<span style="letter-spacing: 0.05pt;">&nbsp;</span>quenching<span style="letter-spacing: 0.05pt;">&nbsp;</span>as<span style="letter-spacing: 0.05pt;">&nbsp;</span>well<span style="letter-spacing: 0.05pt;">&nbsp;</span>as<span style="letter-spacing: 0.05pt;">&nbsp;</span>sprinkling<span style="letter-spacing: 0.05pt;">&nbsp;</span>purposes<span style="letter-spacing: -0.05pt;">&nbsp;</span>for<span style="letter-spacing: -0.05pt;">&nbsp;</span>dust<span style="letter-spacing: -0.05pt;">&nbsp;</span>separation.</span></p> <h1 style="line-height: 12.9pt;"><span lang="EN-US">Hazardous<span style="letter-spacing: -0.2pt;">&nbsp;</span>Waste<span style="letter-spacing: -0.05pt;">&nbsp;</span>and<span style="letter-spacing: -0.2pt;">&nbsp;</span>its<span style="letter-spacing: -0.3pt;">&nbsp;</span>measurements:</span></h1> <p class="MsoBodyText" style="margin: 0.05pt 9.45pt 0.0001pt 84.35pt; text-align: justify; text-indent: -18pt;"><span lang="EN-US">a)<span style="letter-spacing: 0.05pt;">&nbsp;</span>The industry will enter into an agreement with authorized re-cycler for disposal<span style="letter-spacing: -2.65pt;">&nbsp;</span>of waste oil to<span style="letter-spacing: -0.15pt;">&nbsp;</span>be generated from<span style="letter-spacing: 0.05pt;">&nbsp;</span>the DG<span style="letter-spacing: 0.1pt;">&nbsp;</span>set<span style="letter-spacing: -0.15pt;">&nbsp;</span>of capacity<span style="letter-spacing: -0.2pt;">&nbsp;</span>200 KVA.</span></p> <p class="MsoBodyText" style="margin: 0cm 9.95pt 0.0001pt 48.35pt; text-align: justify;"><strong><u><span lang="EN-US">Boiler Ash:</span></u><span lang="EN-US" style="letter-spacing: 0.05pt;">&nbsp;</span></strong><span lang="EN-US">The industry is disposing off its boiler ash for land filling purposes in low<span style="letter-spacing: 0.05pt;">&nbsp;</span>lying<span style="letter-spacing: -0.1pt;">&nbsp;</span>areas.</span></p> <p class="MsoBodyText" style="margin-right: 38.9pt; text-align: right; line-height: 12.85pt;" align="right"><span lang="EN-US">&ldquo;</span></p> <p class="MsoBodyText" style="margin: 0.2pt 2.9pt 0.0001pt 6.2pt; text-align: justify; text-indent: 35.15pt;"><span lang="EN-US">No complaint<span style="letter-spacing: 0.05pt;">&nbsp;</span>is<span style="letter-spacing: 0.05pt;">&nbsp;</span>pending<span style="letter-spacing: 0.05pt;">&nbsp;</span>against<span style="letter-spacing: 0.05pt;">&nbsp;</span>the<span style="letter-spacing: 0.05pt;">&nbsp;</span>industry.<span style="letter-spacing: 0.05pt;">&nbsp;</span>The<span style="letter-spacing: 0.05pt;">&nbsp;</span>industry<span style="letter-spacing: 0.05pt;">&nbsp;</span>was<span style="letter-spacing: 2.8pt;">&nbsp;</span>found<span style="letter-spacing: -2.65pt;">&nbsp;</span>complying<span style="letter-spacing: 0.05pt;">&nbsp;</span>with<span style="letter-spacing: 0.05pt;">&nbsp;</span>consent<span style="letter-spacing: 0.05pt;">&nbsp;</span>conditions<span style="letter-spacing: 0.05pt;">&nbsp;</span>during<span style="letter-spacing: 0.05pt;">&nbsp;</span>last<span style="letter-spacing: 0.05pt;">&nbsp;</span>visit<span style="letter-spacing: 0.05pt;">&nbsp;</span>and<span style="letter-spacing: 0.05pt;">&nbsp;</span>consents<span style="letter-spacing: 0.05pt;">&nbsp;</span>were<span style="letter-spacing: 0.05pt;">&nbsp;</span>granted<span style="letter-spacing: 0.05pt;">&nbsp;</span>thereafter.</span></p> <p class="MsoBodyText" style="margin: 0cm 2.35pt 0.0001pt 7.2pt; text-align: justify; text-indent: 35.35pt;"><span lang="EN-US">The competency for grant of consents/NOC to the rice shellers with or without<span style="letter-spacing: 0.05pt;">&nbsp;</span>dryer<span style="letter-spacing: -0.05pt;">&nbsp;</span>lies<span style="letter-spacing: -0.05pt;">&nbsp;</span>with<span style="letter-spacing: -0.05pt;">&nbsp;</span>the<span style="letter-spacing: -0.1pt;">&nbsp;</span>Environmental<span style="letter-spacing: -0.05pt;">&nbsp;</span>Engineer of<span style="letter-spacing: -0.05pt;">&nbsp;</span>the Regional<span style="letter-spacing: -0.05pt;">&nbsp;</span>Office.</span></p> <p class="MsoBodyText" style="margin: 0cm 2.35pt 0.0001pt 7.2pt; text-align: justify; text-indent: 35.35pt;"><span lang="EN-US">Keeping in view of above, it is recommended that the varied consent to operate may be granted to the industry&nbsp;<strong>upto 30.09.2032</strong>&nbsp;to manufacture Sorted raw rice with dryer @ 5.0 TPH and<span style="letter-spacing: 0.05pt;">&nbsp;</span>Steamed rice @ 2.0 TPH by using Paddy @ 10.5 TPH, with suitable conditions as per<span style="letter-spacing: 0.05pt;">&nbsp;</span>policy<span style="letter-spacing: -0.05pt;">&nbsp;</span>of the<span style="letter-spacing: -0.05pt;">&nbsp;</span>Board and special conditions as mentioned below: -</span></p> <p class="MsoBodyText" style="margin: 0.05pt 2.4pt 0.0001pt 7.2pt; text-align: justify; text-indent: 35.35pt;"><span lang="EN-US">&nbsp;</span></p> <p class="MsoListParagraphCxSpFirst" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">This consent is valid for production of Sorted raw rice with dryer @ 5.0 TPH and Steamed rice @ 2.0 TPH by using Paddy @ 10.5 TPH, as raw material</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall comply with the assurance given by it through undertaking duly notarized dated 19/03/2021 submitted by Sh. Rajesh Kumar, proprietor of M/s Aman Rice Mills, Jakhal Road, Sunam.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall never construct the building of unit in the specified area under high tension 220 KVA line as per the guidelines of the PSPCL authorities failing which action as deemed fit shall be initiated against the industry.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall bound to comply with the PSPCL guidelines w.r.t. high tension zone for the construction of the building and shall not carry out any construction up to 17.50 meter from the center line of 220 KVA line as per assurance already given by the industry through notarized affidavit.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall comply with all the conditions imposed in the NOC granted vide District Town Planner, Sangrur letter no. 304 DTP (S)/ RS-1 dated 16/02/2021.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The rice sheller shall ensure the compliance of following code of practice laid down by Govt. vide order no. 10/48/2004-STE (4) /932 dated 15/10/2013 at all the times in true letter &amp; spirit:-</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 28.25pt; text-indent: -7.1pt;"><span lang="EN-US">A) Code of Practices</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 28.25pt; text-indent: -28.25pt; line-height: 18.4px;"><span lang="EN-US"><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>i.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">All the processing sheds be covered and have minimum ventilation as per the recommendations of Director of Factories.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 28.25pt; text-indent: -28.25pt; line-height: 18.4px;"><span lang="EN-US"><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>ii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry should plant thick plantation of spreading crown varieties of evergreen trees all along the boundary wall of the rice sheller / saila plant.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 28.25pt; text-indent: -28.25pt; line-height: 18.4px;"><span lang="EN-US"><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>iii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">All dust emitting points should be properly hooded and dust extracted to a common point. At this exhaust point, dust coming here will be passed through a dust control system and air will be emitted through a stack of height 3 meters above the roof of the building.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 28.25pt; text-indent: -28.25pt; line-height: 18.4px;"><span lang="EN-US"><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>iv.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The management and handling of rice husk in the rice shelling units / saila plants should be done as under:</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">a) All the rice shelling units / saila plants shall provide paved / brick roads / cement concrete roads/ metalled roads inside their premises for movement of vehicles, so as to prevent the generation of dust.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">b) The industry shall provide proper rice husk storage facilities inside the factory premises and the height of brick wall in front of the discharge point of rice husk area should be at least 10' high or 3.5' higher than the discharge point of the rice husk pipe (whichever is more) and the length of aforesaid brick wall should be at least 35' on each side of the rice husk discharge pipe.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">c) The industry shall provide a layer of wind screen of mild steel or some other similar material of at least 5' height above the brick wall. The wind screen system should have a porosity of ~30% to lower the wind velocities, thus reducing the amount of airborne particulate from storage, handling and loading / unloading areas of rice husk.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">d) The minimum diameter at the outlet of discharge pipe of rice husk be kept as 15'', which can be maintained by extending the existing discharge pipe with the help of a conical shaped pipe of at least 3' length.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">e) Wherever the height of rice husk is 3' or more, the industry shall cover the heap of husk with HDPE warp knitted fabric completely, except the area near the discharge pipe. The HDPE warp knitted fabric be made of 100% virgin high density polymer of at least 70 gm/m2 weight having 40-45 hole/inch2 to prevent wind blowing of stored husk.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">f) During transportation of rice husk through vehicles, it shall be covered from all sides with tarpaulin to prevent blowing of husk by winds.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 35.45pt; text-indent: -14.15pt;"><span lang="EN-US">v. "Guidelines for Handling, Transportation, Storage and Disposal of Ash from Husk Fired Boiler:- The management and handling of rice husk ash in the rice shelling units/saila plants should be done as under:-</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 49.65pt; text-indent: -14.2pt;"><span lang="EN-US">a) The ash collected from APCD from husk fired boiler shall be temporarily stored in a shed/chamber closed from at least three sides and a roof, with access only from the from the front side for purpose of removal of ash.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 49.65pt; text-indent: -14.2pt;"><span lang="EN-US">b) During loading/ unloading of ash, water shall be sprinkled periodically to keep the ash heap in wet condition so that the top layer remains wet at all times so that ash particles are not blown by winds.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 49.65pt; text-indent: -14.2pt;"><span lang="EN-US">c) All the conveyors/ vehicles conveying ash within or outside the plant premises shall be covered from all sides to prevent blowing of ash particles by winds.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 49.65pt; text-indent: -14.2pt;"><span lang="EN-US">d) The boiler ash shall be disposal in such a way that secondary emissions of the ash do not occur due to wind blowing effect.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 42.55pt; text-indent: -7.1pt;"><span lang="EN-US">The following disposal practices shall be followed.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 42.55pt; text-indent: -7.1pt;"><span lang="EN-US">For units disposing ash outside their own premises:</span></p> <p class="MsoListParagraph" style="text-indent: 0cm; margin: 0cm 2.3pt 0.0001pt 49.65pt;"><span lang="EN-US">The rice mills disposing their boiler ash outside their premises through contractors shall ensure that the ash has been disposed at a designated landfill site facility as approved by Punjab Pollution Control Board. For units disposing ash within their own premises:</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 63.8pt; text-indent: -14.15pt;"><span lang="EN-US">a) The units disposing ash at the ground level should cover the ash wit soil and periodically sprinkle water on the disposed ash so as to keep it in wet condition at all times. Pilling up of another batch of ash over the earlier disposed ash may be done, but the ash heap should be covered each time by soil and kept wet by sprinkling of water. A wind breaking wall of a height equal to the height of the ash heap shall be erected around the ash disposal site, leaving an opening for access road.</span></p> <p class="MsoListParagraph" style="margin: 0cm 2.3pt 0.0001pt 63.8pt; text-indent: -14.15pt;"><span lang="EN-US">b) The industry may develop underground ditch for disposal of boiler ash within plant premises in an environmentally sound manner."</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">7.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall obtain permission for abstraction of ground water as per guidelines issued by the Central Ground Water Authority (CGWA).</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">8.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall discharge its effluent onto land for plantation purposes &amp; same shall not be allowed to stagnate anywhere inside or outside its premises.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">9.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span lang="EN-US">The industry shall discharge domestic effluent onto land for plantation after its treatment in septic tank.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">10.</span><span lang="EN-US">The industry shall not consume any fuel except rice husk in boiler furnace &amp; HSD for D. G sets for burning purposes without the prior written permission of the Board.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">11.</span><span lang="EN-US">The industry shall be bound to achieve stack emission standards laid down by the CPCB /PPCB from time to time and shall upgrade its APCD to ensure that emissions discharged conform to emission standards prescribed/amended by the Board from time to time.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">12.</span><span lang="EN-US">The industry shall ensure to maintain the distance of sitting parameters as mentioned in the notification no. 10/48/2004-STE(4)/932 dated 15/10/2013, from the proposed site of the rice shelling unit.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">13.</span><span lang="EN-US">The industry shall earmark the area for disposal of fly ash and also make agreement with the brick kilns for use of ash for the production of bricks.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">14.</span><span lang="EN-US">The industry should confirm to the following ambient noise levels prescribed under Rule 13 (1) of Noise Pollution (Regulation &amp; Control) Rules, 2000 at their boundary limits: Sr. No. Parameters Day Time Night Time 1. Industrial Area 75 70 2. Commercial Area 65 55 3. Residential Area 55 45 4. Silence Zone 50 40 (limits in dB(A)) Note: i) Day time shall mean from 6.00 a.m. to 10.00 p.m. ii) Night time shall mean from 10.00 p.m. to 6.00 a.m.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">15.</span><span lang="EN-US">The industry shall install noise limiter on potential polluting devices including retrofitting the existing devices.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">16.</span><span lang="EN-US">The industry shall get revised building plans approved from the Competent Authority, if required as per law.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">17.</span><span lang="EN-US">The maximum noise levels near the construction site should be limited to 75 dB(A) Leq (5 min) in industrial areas and to 65 dB(A) Leq (5 min) in other areas.</span></p> <p class="MsoListParagraphCxSpLast" style="margin: 0cm 2.3pt 10pt 21.15pt; text-indent: -14.15pt; line-height: 18.4px;"><span lang="EN-US">18.</span><span lang="EN-US">Material need to be stockpiled and unused equipment to be placed between noisy operating equipment and other areas.</span></p> <p class="MsoBodyText" style="margin: 0.05pt 2.3pt 0.0001pt 7.2pt; text-align: justify; text-indent: 35.35pt;"><span lang="EN-US">&nbsp;</span></p> <p><span lang="EN-US">&nbsp;</span></p>
Inspection: false
Inspection Note:
Officer: PPCB143
Reject: false
Reject Note:
Role: RO AEE Mohit Singla