Show ApplicationProcessingDetails

Id: 21041004
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-02-01 13:37:17.081
File Note: <p style="text-align: justify;">The agenda note and report / recommendations of AEE/EE, RO, may kindly be perused.</p> <p style="text-align: justify;">The industry is a small scale red category phosphating unit and was granted Consent to operate under the Water Act, 1974 and Air Act, 1981, valid upto 20.09.2022.</p> <p style="text-align: justify;">Earlier, the industry has not made an agreement with the CETP operator as such, the electric connection was disconnected on 31.05.2017 and restored temporarily four times and lastly upto 20.09.2022.</p> <p style="text-align: justify;">Now, the industry has applied for renewal consent to operate under the Water Act, 1974 and Air Act, 1981. The industry has already deposited consent fee, which is adequate upto 30.06.2025.</p> <p style="text-align: justify;">To verify the facts, the industry was visited by the officer of RO on 17.12.2022 and it was observed as under:-</p> <p style="text-align: justify;">1.&nbsp;&nbsp;&nbsp;&nbsp;The industry was in operation during the visit and is engaged in the manufacturing of electric panels and is having the process of phosphating and powder coating.</p> <p style="text-align: justify;">2.&nbsp;&nbsp;&nbsp;&nbsp;The industry has provided water meter on the source of fresh water supply and reading was noted to be 14.84 KL during the visit.</p> <p style="text-align: justify;"><strong>3.&nbsp;&nbsp;&nbsp;&nbsp;The industry failed to show the record of total water consumption viz-a-viz effluent lifted.</strong></p> <p style="text-align: justify;">4.&nbsp;&nbsp;&nbsp;&nbsp;The industry has made an agreement with M/s JBR Technologies Pvt. Ltd, Ludhiana for lifting of effluent @ 1,000 Ltr/month.</p> <p style="text-align: justify;">5.&nbsp;&nbsp;&nbsp;&nbsp;The industry has provided storage tank of capacity 1000 ltrs for collection of trade effluent generated from the process. No effluent was lying in the storage tank during the visit.</p> <p style="text-align: justify;">6.&nbsp;&nbsp;&nbsp;&nbsp;The industry is discharging only domestic effluent into sewer.</p> <p style="text-align: justify;">7.&nbsp;&nbsp;&nbsp;&nbsp;The industry has installed one powder coating booth in-built cyclone as APCD and adequate stack height.</p> <p style="text-align: justify;">8.&nbsp;&nbsp;&nbsp;&nbsp;The industry has also installed an electric fired oven with the powder coating section.</p> <p style="text-align: justify;">9.&nbsp;&nbsp;&nbsp;&nbsp;The industry has installed one DG set of 62.5 KVA with canopy as well as adequate stack height.</p> <p style="text-align: justify;">10.&nbsp;The site of industry falls in approved Focal Point.</p> <p style="text-align: justify;">&nbsp;In view of above, it is recommended that consent to operate under the Air (Prevention &amp; Control of Pollution) Act, 1981 may be granted to the industry upto 30.06.2025 (as there is no violation nor any directions under Air Act, 1981).</p> <p style="text-align: justify;">Competency : SEE</p> <p>&nbsp;</p>
Inspection: false
Inspection Note:
Officer: PPCB089
Reject: false
Reject Note:
Role: ZO EE Satyajit Attri