| File Note: |
<p style="text-align: justify;">The agenda note and report / recommendations of AEE/EE, RO, may kindly be perused.</p>
<p style="text-align: justify;">The industry is a small scale red category phosphating unit and was granted Consent to operate under the Water Act, 1974 and Air Act, 1981, valid upto 20.09.2022.</p>
<p style="text-align: justify;">Earlier, the industry has not made an agreement with the CETP operator as such, the electric connection was disconnected on 31.05.2017 and restored temporarily four times and lastly upto 20.09.2022.</p>
<p style="text-align: justify;">Now, the industry has applied for renewal consent to operate under the Water Act, 1974 and Air Act, 1981. The industry has already deposited consent fee, which is adequate upto 30.06.2025.</p>
<p style="text-align: justify;">To verify the facts, the industry was visited by the officer of RO on 17.12.2022 and it was observed as under:-</p>
<p style="text-align: justify;">1. The industry was in operation during the visit and is engaged in the manufacturing of electric panels and is having the process of phosphating and powder coating.</p>
<p style="text-align: justify;">2. The industry has provided water meter on the source of fresh water supply and reading was noted to be 14.84 KL during the visit.</p>
<p style="text-align: justify;"><strong>3. The industry failed to show the record of total water consumption viz-a-viz effluent lifted.</strong></p>
<p style="text-align: justify;">4. The industry has made an agreement with M/s JBR Technologies Pvt. Ltd, Ludhiana for lifting of effluent @ 1,000 Ltr/month.</p>
<p style="text-align: justify;">5. The industry has provided storage tank of capacity 1000 ltrs for collection of trade effluent generated from the process. No effluent was lying in the storage tank during the visit.</p>
<p style="text-align: justify;">6. The industry is discharging only domestic effluent into sewer.</p>
<p style="text-align: justify;">7. The industry has installed one powder coating booth in-built cyclone as APCD and adequate stack height.</p>
<p style="text-align: justify;">8. The industry has also installed an electric fired oven with the powder coating section.</p>
<p style="text-align: justify;">9. The industry has installed one DG set of 62.5 KVA with canopy as well as adequate stack height.</p>
<p style="text-align: justify;">10. The site of industry falls in approved Focal Point.</p>
<p style="text-align: justify;"> In view of above, it is recommended that consent to operate under the Air (Prevention & Control of Pollution) Act, 1981 may be granted to the industry upto 30.06.2025 (as there is no violation nor any directions under Air Act, 1981).</p>
<p style="text-align: justify;">Competency : SEE</p>
<p> </p> |