Show ApplicationProcessingDetails

Id: 21062203
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-02-03 10:55:53.304
File Note: <p class="MsoBodyText" style="line-height: 115%; mso-list: l1 level1 lfo2; margin: 2.2pt 14.6pt 12.0pt 35.45pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; letter-spacing: .3pt;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="letter-spacing: .3pt;">It is a small scale red category unit and is engaged in the process of manufacturing of Aluminum and Steel Utensils @ 1500 Kgs/day, Hard Annodised Cookwares @ 500 Kgs/day, Powder Coated Cookwares @ 200 Kgs/day, Aluminum and Stainless Steel Pressure Cookers @ 1000 Nos/day using Aluminum Circles @ 1000 Kgs/day, Stainless Steel Circles @ 1000 Kgs/day, Bakellite Handles<span style="mso-spacerun: yes;">&nbsp; </span>@ 150 Kgs/day, Virgin Plastic Bags @ 100 Kgs/day, Aluminium Ribits and Other Spares @ 100 Kgs/day as raw material. </span></p> <p class="MsoBodyText" style="line-height: 115%; mso-list: l1 level1 lfo2; margin: 2.2pt 14.6pt 12.0pt 35.45pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; letter-spacing: .3pt;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="letter-spacing: .3pt;">Earlier, the industry was granted CTE/NOC Vide No. CTE/Fresh/KPR/2021/17142165 dated 17.11.2021, which was valid upto 16.11.2022.</span></p> <p class="MsoBodyText" style="line-height: 115%; mso-list: l1 level1 lfo2; margin: 2.2pt 14.6pt 12.0pt 35.45pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; letter-spacing: .3pt;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="letter-spacing: .3pt;">Now, the industry has applied for consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act 1981 through OCMMS of the Board. </span></p> <p class="MsoBodyText" style="line-height: 115%; mso-list: l1 level1 lfo2; margin: 2.2pt 14.6pt 12.0pt 35.45pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; letter-spacing: .3pt;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="letter-spacing: .3pt;">The industry has deposited Rs. 72,000/- vide Receipt No. 970709380 dated 18.01.2023 under Water Act, 1974 and Rs. 72,000/- vide Receipt No. 877845213 dated 18.01.2023 under Air Act, 1981, which are adequate upto 30.06.2027.</span></p> <p class="MsoBodyText" style="line-height: 115%; mso-list: l1 level1 lfo2; margin: 2.2pt 14.6pt .0001pt 35.45pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Symbol; mso-fareast-font-family: Symbol; mso-bidi-font-family: Symbol; letter-spacing: .3pt;"><span style="mso-list: Ignore;">&middot;<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="letter-spacing: .3pt;">The industry was visited by AEE on 02.02.2023 and it was observed as under:-</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry was in operation during visit and engaged in manufacturing of Aluminum and Steel Utensils @ 1500 Kgs/day, Hard Annodised Cookwares @ 500 Kgs/day, Powder Coated Cookwares @ 200 Kgs/day, Aluminum and Stainless Steel Pressure Cookers @ 1000 Nos/day using Aluminum Circles @ 1000 Kgs/day, Stainless Steel Circles @ 1000 Kgs/day, Bakellite Handles<span style="mso-spacerun: yes;">&nbsp; </span>@ 150 Kgs/day, Virgin Plastic Bags @ 100 Kgs/day, Aluminium Ribits and Other Spares @ 100 Kgs/day as raw material.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry is engaged in the process of anodizing and has installed ETP. During visit the components of ETP were found in good condition. The effluent is generated only from the washing of the utensils parts after anodizing process which is in small quantity as the washing is carried out in same bucket for many utensils and is discharged into ETP after the water is not fit for washing purpose. The treated effluent from the ETP is discharge onto land for plantation.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry has submitted analysis results of samples collected on 09.01.2023 by NABL Accredited Laboratory i.e. Noida Testing Laboratories as per which the concentration of various parameters including letter was found to be within the prescribed limits of the Board.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">Domestic effluent is being discharged into MC sewer.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry has installed 3 nos of D.G sets of capacity 200 KVA, 250 KVA &amp; 62 KVA with canopies and attached to stack of adequate heights.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">6.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry has also submitted the DTP letter for approval of building plan for industrial manufacturing and sale of domestic appliance vide letter no. 55 dated 13.01.2022.</span></p> <p class="MsoListParagraph" style="line-height: 113%; mso-list: l0 level1 lfo3; margin: 7.1pt 14.75pt 12.0pt 2.0cm;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;"><span style="mso-list: Ignore;">7.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 113%;">The industry is complying with the conditions of NOC granted to it.</span></p> <p class="MsoBodyText" style="text-indent: 87.35pt; line-height: 150%; margin: .3pt 14.85pt .0001pt 19.0pt;"><span lang="EN-US">Keeping in view of above, it is recommended that consent to operate under Water<span style="letter-spacing: .05pt;"> </span>(Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act<span style="letter-spacing: -3.6pt;"> </span>1981 may be granted upto <span style="color: black; mso-themecolor: text1;">30.06.2027 </span>with usual conditions as per policy of the Board and<span style="letter-spacing: -3.6pt;"> </span>with<span style="letter-spacing: -.05pt;"> </span>special conditions that:-</span></p> <p class="MsoListParagraph" style="margin-right: 0cm; text-indent: -18.05pt; line-height: 150%; mso-list: l2 level1 lfo1; tab-stops: 55.05pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; line-height: 150%;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 150%;">The<span style="letter-spacing: -.15pt;"> </span>industry<span style="letter-spacing: -.1pt;"> </span>shall<span style="letter-spacing: -.1pt;"> </span>maintain<span style="letter-spacing: -.1pt;"> </span>proper<span style="letter-spacing: -.15pt;"> </span>record<span style="letter-spacing: -.2pt;"> </span>of<span style="letter-spacing: -.1pt;"> </span>the<span style="letter-spacing: -.05pt;"> </span>operation<span style="letter-spacing: -.05pt;"> </span>of<span style="letter-spacing: -.15pt;"> </span>the<span style="letter-spacing: -.05pt;"> </span>ETP.</span></p> <p class="MsoListParagraph" style="margin-right: 0cm; text-indent: -18.05pt; line-height: 150%; mso-list: l2 level1 lfo1; tab-stops: 55.05pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-size: 12.0pt; line-height: 150%;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 150%;">The project proponent shall obtain permission from the PWRDA for the abstraction of ground water. </span></p> <p class="MsoListParagraph" style="text-indent: 0cm; line-height: 115%; tab-stops: 55.05pt; margin: 2.2pt 14.8pt .0001pt 55.0pt;"><span lang="EN-US" style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 115%;"><span style="mso-spacerun: yes;">&nbsp;</span>(Competency Senior Environmental Engineer)</span></p>
Inspection: false
Inspection Note:
Officer: PPCB127
Reject: false
Reject Note:
Role: RO AEE Ravdeep Singh