Show ApplicationProcessingDetails

Id: 21126159
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-02-10 16:05:02.722
File Note: <p class="MsoNormal" style="text-align: justify; text-indent: 1.0in; line-height: normal; background: white;"><span style="font-size: 12.0pt; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-language: PA;">The hotel was visited by undersigned on 09.02.2023 and during visit, the STP provided by the hotel was in operation. The effluent samples from outlet to STP were collected during visit and sent to Zonal lab, Ludhiana for analysis of the same. The project proponent has provided separate energy meter with STP and is maintaining record regarding operation of the same. During visit, reading of the energy meter was 886 kWh. The treated water was discharged into lawn / green area maintained by the project proponent. The project proponent has developed green area along boundary wall on three sides of site and two lawns. Total green area is about 2 kanals and condition of plantation is good. However, the project proponent has not installed flow meter at outlet to STP. </span><span style="font-size: 12.0pt; font-family: 'Tahoma','sans-serif';">The hotel has installed bio-composter for the processing of bio-degradable waste generated from its premises and the same was in operation. </span></p> <p class="MsoNormal" style="text-align: justify; text-indent: 1.0in; line-height: normal; background: white;"><span style="font-size: 12.0pt; font-family: 'Tahoma','sans-serif';">Keeping the above in view, it is recommended that the case may be decided in view of the analysis results of the effluent samples collected on 09.02.2023. </span></p>
Inspection: false
Inspection Note:
Officer: PPCB148
Reject: false
Reject Note:
Role: RO AEE Rajpal Gill