| File Note: |
<p class="MsoBodyText" style="text-align: justify; text-indent: 56.7pt; line-height: 150%; background: white; margin: 0in -3.15pt .0001pt 0in;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry was granted ‘Consent to Operate’ under the Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 vide no. CTOW/Varied/LDH3/2020/13341038 & CTOA/Varied/LDH3/2020/13341021 both dated 11.11.2020 for manufacturing of tubes @ 24700 Numbers/Day and Tyres @ 6000 Numbers/Day, valid upto 30.06.2023 each.</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: 56.7pt; line-height: 150%; background: white; margin: 0in -3.15pt .0001pt 0in;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;"><span style="mso-tab-count: 1;"> </span>Thereafter, the industry was visited by officer of the Board on 03.12.2021 and it was observed that the industry was installing new boiler of capacity 8 TPH without obtaining ‘Consent to Establish’ / NOC from the Board and was also violating the provisions of the Air Act, 1981 by not operating APCD with the existing boiler of capacity 3.5 TPH. Effluent samples were also collected from STP provided by the industry and concentration of various parameters was found beyond the prescribed limits of the Board. Meanwhile, the industry had applied for obtaining ‘Consent to Establish’/NOC for expansion under the Water (Prevention & Control of Pollution) Act, 1974 and under the Air (Prevention & Control of Pollution) Act, 1981 through OCMMS for installation of new boiler of capacity 08 TPH to manufacture Auto & ADV Tubes @ 24700 Pcs/day & Auto & Adv Tyres @ 6000 Pcs/day. The industry was given personal hearing before the Senior Environmental Engineer, Zonal Office-2, Ludhiana, wherein it was decided that</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l2 level1 lfo3; background: white; margin: 0in -3.15pt .0001pt 40.5pt;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry shall maintain and operate its sewage treatment plant (STP), regularly and efficiently, so as to achieve the effluent standards, consistently as prescribed by the Board/ MoEF&CC.</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l2 level1 lfo3; background: white; margin: 0in -3.15pt .0001pt 40.5pt;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry shall either get its effluent sample analyzed from Board's/NABL Lab or submit the copy of same in the office of Environmental Engineer, Regional office-3, Ludhiana, within 10 days.</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l2 level1 lfo3; background: white; margin: 0in -3.15pt .0001pt 40.5pt;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Environmental Engineer, Regional office-3, Ludhiana shall visit the site of the industry, verify the compliances, process the NOC application on merits and send the report alongwith recommendations, within 05 days.</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l2 level1 lfo3; background: white; margin: 0in -3.15pt .0001pt 40.5pt;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Further action in the matter will be taken after receipt of report from Environmental Engineer, Regional office-3, Ludhiana.</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: 56.7pt; line-height: 150%; background: white; margin: 0in -3.15pt .0001pt 0in;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Thereafter, the industry was again visited by officer of the Board on 25.02.2022 and it was observed that the industry failed to comply with the decisions of personal hearing and was still violating the provisions of the Water Act, 1974 and the Air Act, 1981. Accordingly, Consent to Establish / NOC expansion application was refused vide no. CTE/EXP/LDH3/2022/17622882 dated 03.03.2022. Accordingly, Notice u/s 33-A of the Water Act, 1974 and the u/s 31-A of the Air Act, 1981 was issued to the industry with an opportunity of personal hearing before the Chief Environmental Engineer, Ludhiana on 04.03.2022. However, no one from the industry attended the said hearing. The industry was again visited by AEE of this office on 11.03.2022 and effluent samples were collected from STP provided by the industry and concentration of various parameters was found beyond the prescribed limits of the Board. Thereafter, the industry again applied for obtaining ‘Consent to Establish’/NOC for expansion under the Water (Prevention & Control of Pollution) Act, 1974 and under the Air (Prevention & Control of Pollution) Act, 1981 through OCMMS for installation of new boiler of capacity 08 TPH to manufacture Auto & ADV Tubes @ 24700 Pcs/day & Auto & Adv Tyres @ 6000 Pcs/day. The industry was given personal hearing before the Chief Environmental Engineer, Ludhiana on 19.05.2022. During the hearing dated 19.05.2022, it was decided as under:</span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo4; background: white; margin: 0in -3.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry shall maintain and operate its STP regularly and efficiently, so as to achieve the effluent standards consistently as prescribed by the Board / MoEF&CC and as amended from time to time. </span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo4; background: white; margin: 0in -3.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry shall not fire any kind of waste / bushes and make provision for vermin composting for the dried leaves. </span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo4; background: white; margin: 0in -3.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry shall provide proper plantation area for the disposal of treated wastewater, provide flow measuring device at STP and enter into the agreement with registered recycler of the Board for disposal of HW category 5.1, within 15 days and submit the compliance in the o/o Environmental Engineer, Regional Office-3, Ludhiana, thereafter. </span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo4; background: white; margin: 0in -3.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Environmental Engineer, Regional Office-3, Ludhiana shall visit the site of the industry, verify the contentions made by the industry and send the report, within 15 days. </span></p>
<p class="MsoBodyText" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo4; background: white; margin: 0in -3.15pt .0001pt .5in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Consent to Establish for the installation of the boiler of capacity 8 TPH be granted to the industry upto 04.04.2023 (adequacy of NOC fee). </span></p>
<p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 150%; background: white;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">Accordingly, ‘Consent to Establish’/ NOC under the Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 was granted vide no. CTE/Exp/LDH3/2022/18269232 dated 27.05.2022 valid upto 04.04.2023 for expansion for installation of new boiler of capacity 08 TPH for manufacturing of tubes @ 24700 Numbers/Day and Tyers @ 6000 Numbers/Day with conditions mentioned therein. </span></p>
<p class="MsoListParagraphCxSpFirst" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 85.05pt; line-height: 150%;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif';">Now, the industry has applied for ‘Consents to Operate’ under the Water (Prevention & Control of Pollution) Act 1974 and under the Air (Prevention & Control of Pollution) Act, 1981 through OCMMS for <span style="background: white;">manufacturing of tubes @ 24700 Numbers/Day and Tyers @ 6000 Numbers/Day with discharge of Domestic effluent @ 3.0 KLD onto land for plantation after treatment in STP and by operation of one boiler of capacity 8 TPH with Dust collector followed by twin cyclone as APCD and 03 no. DG sets of capacity 500 KVA (each) equipped with canopies along with stack of adequate height with conditions mentioned therein</span></span><span style="font-size: 13.5pt; line-height: 150%; font-family: 'Verdana','sans-serif'; background: white;">. </span><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; background: white;">The industry has submitted C.A. certificate dated 04.01.2023 and as per this C.A. certificate, gross fixed assets of the industry is Rs. 26.62 Cr. </span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 85.05pt; line-height: 150%;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif';">The industry has deposited consent fee of Rs. 2,82,000/- vide UTR No. KKBKR22023011707596362 dated 17.01.2023 under Water Act, 1974 and Rs. 2,82,000/- vide UTR No. KKBKR22023011707596362 dated 17.01.2023 under Air Act, 1981, which is adequate upto 30.06.2027 under both acts after adjusting balance consent fee due to change in fee slab in year 2020, 2021 & 2022. The industry has also submitted Rs. 42000/- vide UTR No. 622335879 dated 06.02.2023 as NOC regularization fee for increased fixed assets. The value of fixed assets of the industry has been increased from Rs. 14.58 Cr. to Rs. 26.62 Cr i.e. by Rs. 12.04 Cr. There is no increase in value of land. The value of building increased by 1.73 Cr. The increase in value of building is due to construction of sales office at BRS Nagar and due to major renovation of office building at factory. The value of plant and machinery increased by 9.48 Cr. The industry has submitted bills of items purchased after 01.04.2019 and it has observed that the value of plant and machinery increased in year 2020 by about 07.00 Cr. due to installation of tyre plant and further increased in year 2022 by due to purchase of new mould & dyes, new scale, electrical fittings and motors & boiler of capacity 8 TPH. </span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 85.05pt; line-height: 150%;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'MS Mincho';">The industry was visited on 06.02.2023 and it was observed as under:</span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry was in operation for production of tubes and tyres.</span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has installed boiler of capacity 08 TPH based on coal and rice husk. The industry has installed dust collector followed by twin cyclone as APCD with boiler along with stack of adequate height with sampling arrangements. The air emission samples were collected on 16.12.2022 and as per analysis report, the concentration of SPM is 163 mg/NM3, which is within prescribed limits of the Board. The industry was using rice husk as fuel in its boiler during visit dated 16.12.2022.</span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has removed its old boiler of capacity 3.5 TPH. There is no source of process emissions. </span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">There is no generation of trade effluent from the process and only domestic effluent generated as industry is labour intensive unit. There are 150 no. workers in the industry. There is no labour quarters in the premises of the industry. <span style="mso-spacerun: yes;"> </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has installed STP</span> <span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-fareast-language: EN-IN; mso-bidi-language: PA;">consists of collection tank, EA Reactor, MBBR, Tube settler, Dual Stage Filters for the treatment of domestic effluent to be generated from its premises</span><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">. The treated effluent is disposed off onto land for plantation after STP. The industry has provided plantation in an area of 1000 sq. yards and condition of plantation is good. </span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-margin-top-alt: auto; mso-margin-bottom-alt: auto; margin-left: .75in; mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; background: white;"><!-- [if !supportLists]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;"><span style="mso-list: Ignore;">6.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-IN; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has constructed hazardous waste room of size 8.5’ X 10’ X 8’ for storage of hazardous waste of category 5.1 to be generated from its process. The industry has stored about 300 litres of spent oil (HW Category 5.1) in the storage room. However, the industry has not made any agreement with authorized recycler for lifting of HW category 5.1. The report of the same is being sent separately. <span style="mso-spacerun: yes;"> </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l3 level1 lfo1; margin: 0in 0in .0001pt .75in;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">7.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif';">The industry has installed <span style="background: white;">03 no. DG sets of capacity 500 KVA (each) </span>equipped with canopies along with adequate stack height</span><span lang="EN-IN" style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-ansi-language: EN-IN;">.</span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; line-height: 150%; margin: 0in 0in .0001pt 14.2pt;"><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif';">Keeping in view of the above, it is recommended that: </span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in 0in .0001pt 32.2pt;"><!-- [if !supportLists]--><span style="font-size: 12.0pt; mso-bidi-font-size: 11.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif'; mso-fareast-font-family: Tahoma;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span style="font-size: 12.0pt; line-height: 150%; font-family: 'Tahoma','sans-serif';">Varied ‘Consent to Operate’ under the Water (Prevention & Control of Pollution) Act, 1974 may be granted to the industry for shorter period i.e. upto 30.06.2024 for <span style="background: white;">manufacturing of tubes @ 24700 Numbers/Day and Tyers @ 6000 Numbers/Day with discharge of Domestic effluent @ 3.0 KLD onto land for plantation after treatment in STP subject to suitable conditions with special condition that the industry shall get its effluent samples analyzed from Board’s lab within 01 month.</span></span></p> |