| File Note: |
<p class="MsoNormal" style="text-align: justify; text-indent: 36.0pt;"><span style="font-size: 14.0pt; line-height: 107%; color: #5d5d5d; background: white;">It is submitted that as per CLU dated 09.11.2022 the site is located in </span><strong style="font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;"><span style="font-family: 'Calibri','sans-serif'; mso-ascii-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Raavi; mso-bidi-theme-font: minor-bidi;">residential zone</span></strong><span style="font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; float: none; word-spacing: 0px;"> as per </span><span lang="EN-US" style="font-size: 14.0pt; line-height: 107%; color: #5d5d5d; mso-ansi-language: EN-US;">Master Plan Kapurthala 2007 to 2021 and is located within the MC limits of Kapurthala. Further, there is no air polluting industry such as brick kiln, rice sheller, stone crusher, saila plant, cement plant, grinding unit, hot mix plant etc. falling within a radius of 100 mtr from the boundary of the proposed site.</span><strong><span lang="EN-US" style="font-size: 14.0pt; line-height: 107%; font-family: 'Calibri','sans-serif'; mso-ascii-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Raavi; mso-bidi-theme-font: minor-bidi; color: #5d5d5d; background: white;"> </span></strong></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 36.0pt;"><strong><span style="font-size: 14.0pt; line-height: 107%; font-family: 'Calibri','sans-serif'; mso-ascii-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Raavi; mso-bidi-theme-font: minor-bidi; color: #5d5d5d; background: white;">The special conditions 3 & 4 has been included as precautionary measure, if the project is developed as Building and Construction project by the promoter or any other developer.</span></strong></p>
<p class="MsoNormal" style="text-align: justify; text-indent: 36.0pt;"><strong><span style="font-size: 14.0pt; line-height: 107%; font-family: 'Calibri','sans-serif'; mso-ascii-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Raavi; mso-bidi-theme-font: minor-bidi; color: #5d5d5d; background: white;">In view of above and siting guidelines dated 25.07.2008 as amended on 30.10.2009, </span></strong><span lang="EN-US" style="font-size: 14.0pt; line-height: 107%; color: #5d5d5d; mso-ansi-language: EN-US;">it is recommended that consent to establish (NOC) under Water (Prevention & Control of Pollution) Act, 1974 and Air (</span><span style="font-size: 14.0pt; line-height: 107%; color: #5d5d5d; background: white;">Prevention</span><span lang="EN-US" style="font-size: 14.0pt; line-height: 107%; color: #5d5d5d; mso-ansi-language: EN-US;"> & Control of Pollution) Act, 1981 may be granted to the colony for one year with suitable conditions and with special conditions that:-</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">1.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall comply with the various terms and conditions of the CLU granted to it.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">2.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall use the treated effluent for onto land for plantation within its premises and shall partially use it for flushing purpose by adopting dual plumbing provision in its project.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">3.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The promoter company shall ensure that the total built up area of all individual projects/plots combined together is not more than 1,50,000 sqm, otherwise the project as such is covered under category 8(b) of the schedule appended to the EIA notification and project proponent of the area development project is required to obtain the environmental clearance, failing which, the promoter company shall be liable for action for the violation of EIA notification dated14/09/2006.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">4.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The promoter company shall ensure that the total built up area of construction being carried out by it, if any, or any different builders may not be greater than 20,000 sqm, otherwise the project as such is covered under category 8(a) of the schedule appended to the EIA notification and project proponent of the building and construction project is required to obtain prior environmental clearance, failing which, the promoter company/builder shall be liable for action for the violation of EIA notification dated14/09/2006.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">5.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall obtain permission from the PWRDA for the abstraction of ground water.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">6.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall utilize treated wastewater from nearby STPs for the construction purpose and shall submit an agreement in this regard within one month.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">7.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall provide separate water meter and energy meter for the STP and maintain record of the same on daily basis.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">8.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall ensure segregation of solid waste at source, facilitate collection of segregated waste in separate streams, handover recyclable material to either the authorized waste pickers or the authorized recyclers as prescribed in Solid Waste Management Rules, 2016. The bio-degradable waste shall be processed, treated and disposed of through composting by providing mechanical composter of capacity 200 kg/day.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">9.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall ensure that all the construction material and debris shall be carried out in trucks or other vehicles which are fully covered and protected so as to ensure that the construction debris or the construction material does not get disburse into the air or atmosphere in any form.</span></p>
<p class="MsoListParagraph" style="text-align: justify; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">10.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The project proponent shall take all necessary steps to control the dust emissions to be generated from the construction activities of the project</span></p>
<p class="MsoListParagraph" style="text-align: justify; text-indent: -23.55pt; line-height: 18.0pt; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 0cm 5.75pt .0001pt 21.3pt;"><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">11.</span><span lang="EN-US" style="font-size: 7.0pt; color: #5d5d5d; mso-ansi-language: EN-US;"> </span><span lang="EN-US" style="font-size: 14.0pt; color: #5d5d5d; mso-ansi-language: EN-US;">The promoter company shall comply with the provisions of the Construction and Demolition Management Rules, 2016.</span></p> |