Show ApplicationProcessingDetails

Id: 21172583
Approve: false
Approve Note:
Clarification: true
Clarification Note: On scrutinizing the application of the project proponent and during visit of the project on 14.02.2023, it is observed as under: 1) In the layout plan approved by the authority, the location of the STP has not been marked. Further, in the layout plan submitted with the application, no detail regarding no. of SCOs , offices & halls to be constructed has been mentioned. Hence, the approved layout plan mentioning complete details is required to be uploaded. 2) The DG set for which the Consent to Operate has been applied has not been installed at the site. The project proponent has installed 2 no. temporary DG set of capacity 62.5 KVA with canopy and adequate stack and 45 KVA without canopy and inadequate stack height. 3) The dimensional drawing of STP submitted is not proper as it not clearly depicts all the components of the STP. 4) The project proponent has not developed the plantation area and karnal technology (@ 0.75 acres) where it is proposing to use the treated waste-water @ 13 KLD. 5) The project proponent has not carried out color coding of the pipeline laid for fresh water, dual plumbing etc. 6) The project proponent has not obtained permission from PWRDA for ground water abstraction till date. 7) The project proponent has not installed color coded bins at the site for promoting segregation of solid waste in compliance of NOC conditions. 8) The project proponent has not installed mechanical composter at the site for in-situ management of wet solid waste. 9) The project proponent is required to deposit NOC regularization fee of Rs 1800/- for increase in assets by Rs 14 Lacs. 10) The project proponent is yet to make connection of the treated water line from STP to plantation and dual plumbing. 11) The project proponent is required to submit component wise calculation of built up area of 17879 sqm as mentioned in the application form. 12) The project proponent has installed 2 borewells at the site but no water meter has been provided. You are requested to attend the above observations within 5 days.
Date Created: 2023-02-15 20:33:10.598
File Note:
Inspection: false
Inspection Note:
Officer: PPCB114
Reject: false
Reject Note:
Role: RO AEE Piyush Jindal