| Clarification Note: |
The application was considered by the Competent Authority and following discrepancies were observed:-
1) The PP has submitted feasibility/ technical report with the application which is not in accordance with the project report as:
a. In project report the PP has mentioned that the project is having 13 no. cottages, a restaurant and a banquet hall however as per technical report (page 3) the hotel rooms have been mentioned as 20 no.
b. On page no 3 of the technical report under introduction section, it has been mentioned as maximum gathering will be 700 persons however on the same page it has been mentioned under the total effluent generation head that the max strength will be 806 persons & 30 rooms.
c. On page 3, it has been mentioned that the total effluent generation per room will be 100 ltr/room, 20 ltr/ person for small gathering, 40 ltr/person for marriage gathering etc. which is not in consonance with the Code of Basic Requirements of Water Supply, Drainage & Sanitation (IS:1172-1993). And is considered in much less quantity than the IS Code.
d. On page 6, the quantity of effluent generation per function for kitchen under various heads is having wrong calculation.
e. The PP has proposed for discharge of effluent onto land for irrigation however the adequacy of green area has not been provided.
f. The PP has not proposed any grit chamber in the effluent treatment mechanism which is required as per the guidelines for hotels and marriage palaces as per NGT order dated 19.09.2019 in OA no. 400/2017.
g. On page 15 the solid waste generation has been quantified by taking into account 400 persons only however the PP is applying for 600 persons.
h. The PP has proposed to provide solid waste to pig farm however as per SWM Rules, 2016 & guidelines for hotels and marriage palaces as per NGT order dated 19.09.2019 in OA no. 400/2017 the PP his required to provide in house management of Solid waste.
2) The PP has not submitted following documents:
a) approved building plan/ site plan demarcating green area for disposal of treated effluent generated
b) Not provided undertaking/ proposed compliance w.r.t. guidelines as per NGT order dated 19.09.2019 in OA no. 400/2017.
The PP is required to submit amended feasibility report/ technical report as per actual site conditions and as per guidelines as mentioned at point no. 1 and documents / undertaking as mentioned at point no. 2.
It is requested to clarify the above, within 04 days.
|