| File Note: |
<p class="TableParagraph" style="margin-right: 4.8pt; text-align: justify; line-height: 150%;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><strong><span lang="EN-US">Remarks:-<span style="letter-spacing: .05pt;"> </span></span></strong></span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">A)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">Earlier, the consent to operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 were granted to the subject cited industry for manufacturing of Extra Neutal Alchohal @ 120 KLD, Country Liquor @ 5000 Cases/Day, IMFL @ 4000 Cases/Day by Using Broken Rice @ 320 Metric Tonnes/Day, Damaged Wheat @ 350 Metric Tonnes/Day, Sulphuric Acid @ 0.390 Metric Tonnes/Day, Enzyme @ 0.271 Metric Tonnes/Day, Sodium Hydroxide @ 0.130 Metric Tonnes/Day, Urea @ 0.330 Metric Tonnes/Day, Antifoam @ 0.08 Metric Tonnes/Day, Anhydrous Amonia @ 0.130 Metric Tonnes/Day, Lime @ 5 Metric Tonnes/Day & D.A.P. @ 0.250 Metric Tonnes/Day vide online reference no. CTOW/Renewal/GRP/2018/7114126 & CTOA/Renewal/GRP/2018/7127913 dated 20/03/2018, which are valid upto 31/03/2023 under Red Category.</span></span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">B)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">Now, the industry has applied for extension in the validity of obtaining Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 for manufacturing of Extra Neutal Alchohal @ 120 KLD, Country Liquor @ 5000 Cases/Day, IMFL @ 4000 Cases/Day by Using Broken Rice @ 320 Metric Tonnes/Day, Damaged Wheat @ 350 Metric Tonnes/Day, Sulphuric Acid @ 0.390 Metric Tonnes/Day, Enzyme @ 0.271 Metric Tonnes/Day, Sodium Hydroxide @ 0.130 Metric Tonnes/Day, Urea @ 0.330 Metric Tonnes/Day, Antifoam @ 0.08 Metric Tonnes/Day, Anhydrous Amonia @ 0.130 Metric Tonnes/Day, Lime @ 5 Metric Tonnes/Day & D.A.P. @ 0.250 Metric Tonnes/Day under Red Category.</span></span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">C)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has deposited Rs. 2,88,500/- vide UTR No. 709020830</span> dated 27/02/2023 & Rs. 2,88,500/- vide UTR No. 709020830 dated 27/02/2023 as consent to operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 fee, which is adequate upto 31/03/2025 including Rs. 500/- as form downloading fee fee against the total fixed assets value of Rs. 12814.50 lacs. </span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">D)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The subject cited industry was given personal hearing before the Chairman of the Board on 21.06.2022 in reference to show cause notice for revocation of consent to operate granted under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 and it was decided as under:- </span></span></p>
<p class="MsoListParagraphCxSpFirst" style="margin-left: 66.35pt; mso-add-space: auto; text-align: justify; text-indent: -27.0pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level1 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry shall submit an Action plan within 01-month period for the installation of the Drier and MEE to make the industry Zero Liquid Discharge (ZLD) compliant industry. The Action plan should include PERT Chart of Activities with regard to installation of drier and MEE.</span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 66.35pt; mso-add-space: auto; text-align: justify; text-indent: -27.0pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level1 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">Till the industry install Drier and MEE and become a ZLD compliant industry the industry shall submit the Irrigation management plan for the utilization of treated waste water for Irrigation purpose as per Karnal technology within 01-month period.</span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 66.35pt; mso-add-space: auto; text-align: justify; text-indent: -27.0pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level1 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry shall get Environment Audit of the ETP and process audit of the plant from VSI Pune and submit report by 30/09/2022. </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 66.35pt; mso-add-space: auto; text-align: justify; text-indent: -27.0pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level1 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry after getting Environment Audit of ETP shall do the upgradation of holding tanks in the ETP area presently used to store the untreated effluent.</span></span></p>
<p class="MsoListParagraphCxSpLast" style="margin-left: 66.35pt; mso-add-space: auto; text-align: justify; text-indent: -27.0pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level1 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The fly ash disposal shall be done in an environmental sound manner so that Environment does not get degraded by the disposal of fly ash and report be submitted to the Board in this regard.</span></span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">E)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US"> The compliance to above decisions is as below:-</span></span></p>
<p class="MsoListParagraphCxSpFirst" style="margin-left: 70.85pt; mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level4 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has informed that they have already started working on the installation of MEE and drier to produce DDGS instead of decanting and selling DWGS as permitted in EC. The industry has submitted PERT chart as per which mobilisation of site will be started from 23/04/2023 and the ZLD plant commissioned by 05/02/2024. </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 70.85pt; mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level4 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has submitted irrigation management plant. The treated effluent is utilization onto land for plantation in 5 acres. </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 70.85pt; mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level4 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has requested VSI to give their proposal for conducting Environment Audit of the ETP. </span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="margin-left: 70.85pt; mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level4 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has requested VSI to give their proposal for conducting Environment Audit of the ETP and necessary action for upgradation will be taken after wards. </span></span></p>
<p class="MsoListParagraphCxSpLast" style="margin-left: 70.85pt; mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l0 level4 lfo3; text-autospace: ideograph-numeric ideograph-other;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">Rice husk ash (RHA) is being disposed in the scientific manner. The industry has made agreement with gram panchayat Kiri Afgana for disposal of fly ash. </span></span></p>
<p class="TableParagraph" style="text-align: justify; text-indent: -.25in; line-height: 150%; mso-list: l1 level1 lfo1; margin: 0in 4.8pt .0001pt 41.4pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">F)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry was visited by the officers of the Board on 12/01/2023 and it was observed as under:- </span></span></p>
<p class="MsoListParagraphCxSpFirst" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry was in operation during visit.</span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The industry has installed ETP based on anaerobic treatment effluent by aerobic treatment.</span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">The ETP was in operation during visit. Samples of treated effluent from ETP outlet were collected and sent to Head Office Lab, Patiala for analysis. As per analysis report all the parameters (pH -7.7, TSS (mg/l)-47, BOD (mg/l)-22) are within limits. OCEMS is provided which was online.</span></span></p>
<p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">During visit, reading of flow meter installed at ETP outlet was 1475485 KL. As per record reading on this meter on 01/10/2022 was 1413964 Working days in this period were 104. As such average discharge from ETP outlet= 1475485-1413964/104 =591 KLD. Further, flow meter is also recirculation system, reading during visit was 1273900, which was 1233778 KL on 01/10/2022. Thus average treated effluent recirculated= 1273900-1233778/104= 385 KLD. Thus average treated effluent used for irrigation of plantation area = 591 KLD- 385 KLD = 206 KLD, which is within consented discharged of 260 KLD. </span></span></p>
<p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span></span><!--[endif]--><span lang="EN-US">Treated effluent is discharged onto land for plantation in an area of about 5 acres.</span></span></p>
<p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;"><span lang="EN-US">6. </span> <span lang="EN-US">The emission samples from boiler of capacity 36 TPH were collected and sent to Head Office Lab, Patiala for analysis. Wet scrubber is installed as APCD, which was in operation. As per analysis report, SPM levels (116 mg/NM<sup>3</sup>) were within limits.</span></span></p>
<p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; text-indent: -31.5pt; line-height: 150%; mso-pagination: widow-orphan; mso-list: l2 level1 lfo2; text-autospace: ideograph-numeric ideograph-other; margin: 0in 0in 10.0pt 70.85pt;"><span lang="EN-US" style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><span lang="EN-US">In<span style="letter-spacing: .05pt;"> </span>view<span style="letter-spacing: .05pt;"> </span>of<span style="letter-spacing: .05pt;"> </span>above,<span style="letter-spacing: .05pt;"> </span>It<span style="letter-spacing: .05pt;"> </span>is<span style="letter-spacing: .05pt;"> </span>recommended<span style="letter-spacing: .05pt;"> </span>that<span style="letter-spacing: .05pt;"> </span>consent to operate <span style="letter-spacing: .05pt;">under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 </span>may<span style="letter-spacing: .05pt;"> </span>be<span style="letter-spacing: .05pt;"> </span>extended upto 31/03/2025 with suitable conditions. </span></span></p> |