Show ApplicationProcessingDetails

Id: 21324780
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-03-03 17:08:28.001
File Note: <p style="text-align: justify;">NOC was granted to the industry for the installation of 03 soft flow machines, 01 hydro extractor and 1 pole dryer, one boiler of capacity 02 TPH &amp; DG set of capacity 125 KVA with total effluent discharge @ 150 KLD into conveyance system of CETP 50 MLD.&nbsp;It is submitted that the industry has not mentioned the capacity of machines during NOC. The NOC was granted for dyeing of Dyed Cloth @ 1500 Kg/day.</p> <p style="text-align: justify;">Presently, the industry has applied for production&nbsp;&nbsp;capacity dyed cloth @ 1000 Kgs/day with discharge of trade effluent @ 100 KLD &amp; domestic effluent @ 0.5 KLD into conveyance system of CETP 50 MLD along with 01 boiler of capacity 02 TPH &amp; 01 DG set of 125 KVA. The industry has installed 03 soft flow dyeing machines (2 X 300 Kg and 1 X 450 Kg) having total 07 chambers/mouths in its premises.&nbsp;As such, the industry has installed machinery as in the NOC.</p> <p style="text-align: justify;">The industry has applied for consent to operate under Water (Prevention &amp; Control of Pollution) Act 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981. The industry has installed machinery for maximum production capacity @ 2100 Kg/day of production of cotton dyeing and 5250 Kg/day production of polyester dyeing. However, the industry has applied for 1000 Kg/day. At this production, discharge of 100 KLD is not possible.&nbsp;The production figures are not consummate with the discharge of effluent applied.</p> <p style="text-align: justify;">As such, it is recommended that the application of the industry be returned with request to re submit application along with material balance of expected production viz-a-viz effluent discharge.</p> <p>&nbsp;</p>
Inspection: false
Inspection Note:
Officer: PPCB089
Reject: false
Reject Note:
Role: ZO EE Satyajit Attri