Show ApplicationProcessingDetails

Id: 21463998
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-03-17 13:49:01.618
File Note: <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">It is intimated that the Hospital has applied for obtaining fresh consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; Air (Prevention &amp; Control of Pollution) Act, 1981 for 22 authorized beds through OCMMS in a totally paperless manner by uploading necessary documents as PDF under orange category.</p> <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The HCF has deposited Rs. 13000/- vide UTR No. 34108896 dated 14/03/2023 under Water (Prevention &amp; Control of Pollution) Act, 1974 including Rs. 1000/- NOC regularization fee &amp; Rs. 12500/- vide UTR No. BARBR23054625644 dated 23/02/2023 Air (Prevention &amp; Control of Pollution) Act, 1981 including Rs. 500/- application fee, which are adequate upto 31/12/2027.&nbsp;</p> <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The HCF has submitted copy of building plan approve from MC, Dinanagar. The HCF has submitted receipt issued from PWSSB, Dinanagar regarding permission of discharge of its treated effluent into MC sewer.</p> <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The authorization under Bio Medical Waste (Management) Rules, 2016 is valid upto 31/03/2023 vide online reference no. BMW/Renewal/GRP/2018/7560053 dated 15/05/2018 for 22 beds through OCMMS.&nbsp;</p> <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">The HCF has submitted feasibility report of ETP of capacity @ 10 KLD installed for treatment of effluent being generated from the hospital.</p> <p class="TableParagraph" style="margin: 0in 4.65pt 0.0001pt 5.35pt; text-align: justify; line-height: 24px;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The HCF was visited on 17/03/2023 and it was observed as under:-&nbsp;&nbsp;<span style="font-size: 10pt; line-height: 20px; font-family: 'GurmukhiLys 020 Wide';">&nbsp;</span><span style="font-size: 10.5pt; line-height: 21px; font-family: 'Bookman Old Style', 'serif';">&nbsp;</span></p> <p class="MsoBodyText2" style="margin-left: 27.6pt; text-indent: -27pt; line-height: 24px;">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>The hospital comprising of 22 beds engaged in the process of providing medical services.</p> <p class="MsoBodyText2" style="margin-left: 28.95pt; text-indent: -28.35pt; line-height: 24px;">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>The hospital has installed ETP for treatment of effluent being generated from hospital. The effluent was being discharged into MC sewer after treatment.</p> <p class="MsoBodyText2" style="margin-left: 28.95pt; text-indent: -28.35pt; line-height: 24px;">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>The HCF has installed DG set of capacity 62 KVA which is provided with canopy.</p> <p class="MsoBodyText2" style="margin-left: 28.95pt; text-indent: -28.35pt; line-height: 24px;"><span style="font-family: Calibri, 'sans-serif'; font-size: 11pt;">4.&nbsp; &nbsp; &nbsp; &nbsp; The compliance of BMW Rules, 2016 were also verified and HCF found complying.&nbsp;</span><span style="font-family: Calibri, 'sans-serif'; font-size: 11pt;">&nbsp;</span></p> <p class="MsoListParagraph" style="margin: 0in 0in 0.0001pt 0.6pt; text-align: justify; line-height: 18pt; background: white;"><span style="font-family: Cambria, 'serif';">In view of above, it is recommended that Consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; Air (Prevention &amp; Control of Pollution) Act, 1981 may be granted to the HCF for 22 authorized beds for a period upto 30/09/2027 subject to suitable conditions along with special conditions as under:-</span></p> <p class="MsoBodyText2" style="margin-left: 18.6pt; text-indent: -0.25in; line-height: 24px;">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span>The HCF shall install water meter at the final outlet of ETP and separate energy meter for ETP &amp; shall maintain record of the same.</p> <p class="MsoBodyText2" style="margin-left: 18.6pt; text-indent: -0.25in; line-height: 24px;"><span style="text-indent: -28.35pt;"><span style="font-size: 11pt; line-height: 16.8667px; font-family: Calibri, 'sans-serif';">2.&nbsp;&nbsp;</span></span><strong style="text-indent: -28.35pt;"><span style="font-size: 11pt; line-height: 16.8667px; font-family: Calibri, 'sans-serif';">&nbsp;&nbsp;</span></strong><span style="text-indent: -28.35pt;"><span style="font-size: 11pt; line-height: 16.8667px; font-family: Calibri, 'sans-serif';">The HCF shall analysed its treated effluent samples from the Board lab within 02 months period.</span></span></p>
Inspection: false
Inspection Note:
Officer: PPCB122
Reject: false
Reject Note:
Role: RO AEE Vinod Kumar