| File Note: |
<p>1.<span style="white-space: pre;"> </span>The institute has developed more than 01 acre area plantation land as per karnal technology, on the back side of the institute adjoining to its boundary wall.</p>
<p>2.<span style="white-space: pre;"> </span>Since the institute has a strength of 100 student and appox. 25 facility staff members. Appox discharge is 125*45 (ltr/ capita)*0.8= 4.5 KLD. Appox. discharge from boarding facility of 20 students is 20*135(ltr/capita)*0.8= 2.16 KLD. Hence total discharge is appox. 7 KLD. Therefore total plantation area of 1 acre developed is adequate for disposal of treated effluent. Futher no stagnation was observed at site during visit.</p>
<p>3.<span style="white-space: pre;"> </span>The institute has provide separate bins for storage of wet and dry solid waste. Since, the institute is not a bulk waste generator and is within MC limit therefore is getting is solid waste lifted to MC authorities.</p>
<p> </p>
<p>Submitted with recommendations as earlier proposed vide note dated 17.03.2023 pl.</p> |