Show ApplicationProcessingDetails

Id: 21520596
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-03-22 17:07:03.977
File Note: <p class="MsoNormal" style="margin-left: 1.0in; text-align: justify; text-indent: -1.0in;"><strong style="mso-bidi-font-weight: normal;">Subject:<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>Proceeding of the personal hearing given on 13/3/2023 by the Chief Environmental Engineer (P) of the Board to M/s Avon Meters Pvt Ltd., D 15-16-17, Focal Point, Dera Bassi, Distt. SAS Nagar w.r.t show cause notice for refusal of consent to operate under the Water Act, 1974 and the Air Act, 1981</strong></p> <p class="MsoNormal" style="margin-right: 4.8pt; text-align: justify; line-height: 150%;"><span style="mso-bidi-font-weight: bold;">The following were present:</span></p> <h3 style="margin-left: 0in; text-indent: 0in; line-height: 150%;"><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Calibri',sans-serif; mso-ascii-theme-font: minor-latin; mso-hansi-theme-font: minor-latin; mso-bidi-font-family: Arial; mso-bidi-theme-font: minor-bidi;">From the Board:</span></h3> <p class="MsoNormal" style="line-height: 150%;"><span style="color: black; mso-themecolor: text1;">1)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>Sh. Kuldeep Singh, Environmental Engineer (ZP-I)</span></p> <p class="MsoBodyText" style="margin-bottom: .0001pt; line-height: 150%;"><strong style="mso-bidi-font-weight: normal;">From the industry:</strong></p> <p class="MsoBodyText" style="margin-bottom: .0001pt; line-height: 150%;"><span style="mso-bidi-font-weight: bold;"><span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>Sh. Anil Gupta, Director</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 150%;">The officers of the Board brought t<span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">he industry was granted consents to operate under green category under the Water (Prevention &amp; Control of Pollution) Act, 1974 vide no. CTOW/Renewal/SAS/2018/8060364 dated 22.08.2018 and under the Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. CTOA/Renewal/SAS/ 2018/8060272 dated 22/8/2018, valid upto 31/12/2022 for Energy meter @ 9,00,000 Number/Year by using Poly Carbonate @ 1.0 MTD, Components for Assembling of Energy Meters @ 9,00,000 Number/Year as a raw material, subject to certain conditions as mentioned therein. Thereafter, the industry was granted consent to establish (NOC) for expansion under green category under the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 vide no. CTE/Expansion/SAS/2020/12081507 dated 22.01.2020 which was valid upto 22.01.2022 for Energy meter @ 41,00,000 Number/Year by using Poly Carbonate @ 55 MT/Year, Components for Assembling of Energy Meters @ 41,00,000 Number/Year as a raw material, subject to certain conditions as mentioned therein.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 150%;"><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The industry has applied for varied consents to operate under green category under the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981 for Energy meter @ 50,00,000 Number/Year by using Poly Carbonate @ 67 MT/Year, Components for Assembling of Energy Meters @ 50,00,000 Number/Year as a raw material, through OCMMS. The industry was visited by the officer of Regional Office, SAS Nagar on 18/1/2023 and it was observed as under:</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry was in operation and has has installed 12 plastic moulding machine for manufacturing outer casing of energy meter.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed 02 machine for surface mounting chip on Printed circuit Board (PCB).</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed one soldering machine using flux.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed 04 line for assembling and 04 no. packing of energy meter.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed 02 energy meter testing panel.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">6.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed 03 DG set, all equipped with canopy.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">7.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has not provided Environment Data Board at the entrance.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">8.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry is not maintaining any record regarding the consumption of fresh water for domestic purpose as well as in cooling towers and injection moulding machines and generation &amp; disposal of effluent. The industry has not filled the detail in the application.</span></p> <p class="MsoListParagraph" style="margin-bottom: .0001pt; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">9.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry has installed 02 grinding machines for the manufacturing of plastic chips, which is further used for the manufacturing of plastic granules, i.e. the industry is engaged in processing of plastic waste, which is covered under orange category. No APCD installed with 1 no. grinding machine and other grinding machine provided with APCD however, the same found disconnected.</span></p> <p class="MsoListParagraph" style="text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white; margin: 0in 0in .0001pt 1.0in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">10.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry was not obtained authorization under Hazardous &amp; Other Waste (Management &amp; Tran boundary Movement) Rules, 2016 and also not provided proper storage &amp; disposal of hazardous waste. T</span>he industry was failed to get EPR registration obtained through CPCB EPR portal. As such, t<span style="mso-bidi-font-size: 10.5pt; line-height: 150%; mso-bidi-font-family: Tahoma;">the industry does not comply with the </span>directions u/s 5 of the Environmental (Protection) Act, 1981 issued by the CPCB vide its letter no. B-11011/UPC-II/Plastic Waste Management Rules, 2016 Direction)/ 2022/4187 dated 8/9/2022.</p> <p class="MsoListParagraph" style="text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l1 level1 lfo1; background: white; margin: 0in 0in .0001pt 1.0in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">11.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry is not complying with the various terms and conditions of the consents granted by the Board under the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 140%; mso-layout-grid-align: none; text-autospace: none;"><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The industry has changed the process and now the industry falls in the orange category, the industry has not installed the APCD to capture the process emission generated from the orange category process.&nbsp; The industry has failed to comply with the provisions of Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 and conditions of consents to operate earlier granted to it under the said Acts.<span style="mso-spacerun: yes;">&nbsp; </span>It is evident that the industry is violating the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981, wilfully causing pollution in the vicinity, thus violating the provisions of the said Acts, intentionally and deliberately. <span style="mso-spacerun: yes;">&nbsp;</span>It was proposed to refuse the varied consent to operate applied under the provisions of Water (Prevention</span><span style="mso-bidi-font-family: Tahoma;"> &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981, after affording an opportunity of show cause/personal hearing. </span><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">Thereafter, the industry was served show cause notice served for refusal of varied consent to operate applied under the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981 vide Board's letter no. 1116-17 dated 13/2/2023 alongwith an opportunity to submit reply within 7-days.<span style="mso-spacerun: yes;">&nbsp; </span>But the industry was failed to submit any reply w.r.t notice. </span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 140%; mso-layout-grid-align: none; text-autospace: none;"><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The matter was considered by the Competent Authority and decided to afford an opportunity of personal hearing before taking further action in the matter. Therefore, the industry was served show cause notice </span>for refusal of consent to operate under <span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981 </span><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; mso-fareast-language: EN-IN;">vide Board's letter no. 1545-46 dated 3/3/2023 </span><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">alongwith an opportunity of the personal hearing </span><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; mso-fareast-language: EN-IN;">before the Chief Environmental Engineer (P) of the Board on 13/3/2023.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 1.0in; line-height: 140%; mso-layout-grid-align: none; text-autospace: none;"><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;">The representatives of the industry submitted during the hearing that they have stopped the process falling under Orange Category and will not carry out the process which will change the category from current to Orange or Red without obtaining prior permission from the Board. They will also remove the machinery related to Orange Category within a week. The Environment Data board has been provided and has started maintaining the record water meters.<span style="mso-spacerun: yes;">&nbsp; </span></span></p> <p class="MsoListParagraphCxSpFirst" style="margin: 0in; margin-bottom: .0001pt; mso-add-space: auto; text-align: justify; text-indent: 1.0in; line-height: 150%; mso-layout-grid-align: none; text-autospace: none;"><span style="mso-bidi-font-family: Tahoma;">After hearing the officers of the Board and the representatives of the industry, the Chief Environmental Engineer (P) of the Board decided as under:</span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in .7pt .0001pt .5in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">Consent to operate applied under the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981 be refused. </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in .7pt .0001pt .5in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry shall discontinue its processes which are covered under Orange Category as per categorization of the Board. </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in .7pt .0001pt .5in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The Environmental Engineer, Regional Office, SAS Nagar shall seal the plant and machinery which are covered in the Orange Category. </span></p> <p class="MsoListParagraphCxSpMiddle" style="mso-add-space: auto; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in .7pt .0001pt .5in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The industry shall obtain consent to operate under the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981 under Green Category for the processes being carried out in its premises.</span></p> <p class="MsoListParagraphCxSpLast" style="mso-add-space: auto; text-align: justify; text-indent: -.5in; line-height: 150%; mso-list: l0 level1 lfo2; margin: 0in .7pt .0001pt .5in;"><!-- [if !supportLists]--><span style="mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span style="mso-bidi-font-family: Tahoma;">The Environmental Engineer, Regional Office, Mohali shall verify the statement of the industry and process/ decide the consent applications of the industry on merits. </span></p> <p class="MsoBodyText" style="text-align: justify; line-height: 150%; margin: 0in .7pt .0001pt 0in;"><span style="mso-bidi-font-family: Tahoma;"><span style="mso-tab-count: 2;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>If approved, proceedings of the personal hearing as above may be conveyed to the industry and Environmental Engineer, PPCB, RO, SAS Nagar for compliance and sending the report, respectively.</span></p>
Inspection: false
Inspection Note:
Officer: PPCB054
Reject: false
Reject Note:
Role: ZO EE Kuldeep Singh