| File Note: |
<p>1. Last Visit.</p>
<p>2. Effluent dispoal during last visit.</p>
<p>3. Status of online monitoring systems, CCTV Cameras, Lab set up etc. </p>
<p>4. Metering at inlet or outlet... and total waste water treated.</p>
<p>5. Records if any maintained.</p>
<p>6. Utilization of solid waste/ sludge generated. </p>
<p>6. Current status of special condition imposed last time ....<span style="background-color: #ffffff; color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify;">special condition that the M.C, Ludhiana shall prepare treated effluent utilization scheme with the consulation with Department of Soil and Water Conservation, Ludhiana within 3 months.</span></p>
<p><span style="background-color: #ffffff; color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify;">Please reply immediately </span></p> |