Show ApplicationProcessingDetails

Id: 21591507
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-03-28 14:55:35.84
File Note: <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-justify: inter-ideograph; line-height: normal;"><span style="font-size: 12pt;"><strong><span lang="EN-US" style="font-family: Arial, 'sans-serif';">&nbsp; &nbsp; &nbsp; &nbsp; </span></strong><span lang="EN-US" style="font-family: Arial, 'sans-serif';">It is intimated that earlier, the consent to operate under Water (Prevention &amp; control of Pollution) Act, 1974 &amp; Air (Prevention &amp; control of Pollution) Act, 1981 was granted vide online reference no. CTOW/Renewal/PKT/2022/18983907 &amp; CTOA/Renewal/PKT/2022/18983894 dated 29/08/2022, which were valid upto 31/03/2023 respectively. </span></span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-justify: inter-ideograph; line-height: normal;"><span lang="EN-US" style="font-size: 12pt; font-family: Arial, 'sans-serif';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Now, the industry has applied for obtaining for renewal of consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; Air (Prevention &amp; Control of Pollution) Act, 1981 through OCMMS in a totally paperless manner by uploading necessary documents as PDF. </span></p> <p class="MsoBodyText" style="text-align: justify; text-justify: inter-ideograph; text-indent: .5in;"><span style="font-size: 12pt;"><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The industry has already deposited Rs. 68,900/- vide UTR No. BKIDN21224677200 dated 12/08/2021 &amp; Rs. 55,050/- vide UTR No. BKIDN21224677654 dated 12/08/2021 as consent to operate fee under Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981, </span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">which is adequate upto 30/09/2026 including Rs. 3600/- as NOC regularization fee and Rs. 500/- as Form downloading fee against total gross value of fixed assets worth Rs. 59,23,324/- as on 30/06/2022. </span></span></p> <p class="MsoBodyText" style="text-align: justify; text-justify: inter-ideograph; text-indent: .5in;"><span lang="EN-US" style="font-size: 12pt; font-family: Arial, 'sans-serif';">Earlier, a complaint was received against the industry regarding contamination of soil in nearby agriculture land due to spillage of transformer oil. The site was visited and the facts of the complaint were found true. Accordingly, direction u/s 33-A of the Water (Prevention &amp; Control of Pollution) Act, 1974 were issued for disconnection of electricity supply. </span></p> <p class="MsoBodyText" style="text-align: justify; text-justify: inter-ideograph; text-indent: .5in;"><span lang="EN-US" style="font-size: 12pt; font-family: Arial, 'sans-serif';">Thereafter, the industry has applied for Consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981. The site was visited by the then AEE. It was found that the industry had made adequate arrangement to stop the spillage of transformer oil. Accordingly, the CTOs were granted for short period upto 31/07/2022. Thereafter, the CTOs were again renewed upto 31/03/2023.</span></p> <p class="MsoBodyText" style="text-align: justify; text-justify: inter-ideograph; text-indent: .5in;"><span style="font-size: 12pt;"><span lang="EN-US" style="font-family: Arial, 'sans-serif';">&nbsp;Now the industry has applied for renewal of CTOs. </span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The site was visited on 27/03/2023 and it was observed as under:- </span></span></p> <p class="MsoBodyText" style="margin-left: 19.6pt; text-align: justify; text-justify: inter-ideograph; text-indent: -19.6pt; mso-list: l0 level1 lfo1;"><span style="font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Arial, 'sans-serif';">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal; font-family: 'Times New Roman';"> </span></span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The industry is engaged in the manufacturing of electric transformers and was not in operation during visit. </span></span></p> <p class="MsoBodyText" style="margin-left: 19.6pt; text-align: justify; text-justify: inter-ideograph; text-indent: -19.6pt; mso-list: l0 level1 lfo1;"><span style="font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Arial, 'sans-serif';">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal; font-family: 'Times New Roman';"> </span></span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The industry has constructed new impervious tank for the collection of rain water having spillage of waste oil. The industry has also provided oil and grease chamber before the tank to separate the oil from the water. </span></span></p> <p class="MsoBodyText" style="margin-left: 19.6pt; text-align: justify; text-justify: inter-ideograph; text-indent: -19.6pt; mso-list: l0 level1 lfo1;"><span style="font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Arial, 'sans-serif';">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal; font-family: 'Times New Roman';"> &nbsp;&nbsp;</span></span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The industry has also Installed spray paint machines and electrical oven for the paint on transformers. </span></span></p> <p class="MsoBodyText" style="margin-left: 19.6pt; text-align: justify; text-justify: inter-ideograph; text-indent: -19.6pt; mso-list: l0 level1 lfo1;"><span style="font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Arial, 'sans-serif';">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal; font-family: 'Times New Roman';"> &nbsp;</span></span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The hole earlier made in the boundary wall for disposal of waste water mixed with oil has been permanently plugged with brickwork.</span></span></p> <p class="MsoBodyText" style="margin-left: 19.6pt; text-align: justify; text-justify: inter-ideograph; text-indent: -19.6pt; mso-list: l0 level1 lfo1;"><span style="font-size: 12pt;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: Arial, 'sans-serif';">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal; font-family: 'Times New Roman';"> &nbsp;</span></span><span lang="EN-US" style="font-family: Arial, 'sans-serif';">The industry has installed one no. D.G. set of capacity 75 KVA, which is provided with canopy.</span></span></p> <p><span style="font-size: 12pt;"> <span lang="EN-US" style="line-height: 115%; font-family: Arial, 'sans-serif';">&nbsp; &nbsp; &nbsp;The industry is complying with the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981. It is further mentioned here that no sampling of the industry required to be carried out.&nbsp;</span></span></p> <p><span style="font-size: 12pt;"><span lang="EN-US" style="line-height: 115%; font-family: Arial, 'sans-serif';">&nbsp; &nbsp; &nbsp; &nbsp;</span><span style="font-family: Arial, 'sans-serif';">&nbsp;</span><span style="font-family: Arial, 'sans-serif';">In view of above, it is recommended that the Consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 may be granted upto 30/09/2026 along with suitable conditions and electricity connection may be restored permanently.</span></span></p>
Inspection: false
Inspection Note:
Officer: PPCB152
Reject: false
Reject Note:
Role: RO AEE Varinderjeet Singh