Show ApplicationProcessingDetails

Id: 21665617
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-04-03 12:23:48.51
File Note: <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The previous CTOs were granted to the industry on 08.07.2019 (valid upto 30.06.2024) for production of battery plates @ 1000 nos/day and lead ingots @ 500 TPA by using lead acid battery plates/ scrap @ 750 TPA by operating 2 no. smelting furnaces.</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The industry was granted authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 for generation, collection, storage &amp; disposal of hazardous waste of category 9.1 &amp; 9.2 on 11.01.2022 (valid upto 10.01.2027).</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The industry has also obtained registration cum passbook for utilization of lead acid batteries/lead scrap on 11.01.2022 (valid upto 10.01.2027).</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The industry was visited on 29.11.2022 and it was observed that the industry has carried out expansion by installing new rotary furnace &amp; smelting furnace in addition to the existing 2 no. smelting furnaces, lot of emissions were observed being emitted from the rotary furnace which were not being arrested in the APCD installed, wet scrubber installed was not in line, no specific area provided for breaking of the scrap batteries and same were lying all over the floor area, poor house keeping, no record submitted regarding lifting of the lead acid battery scrap and also no record being maintained regarding generation/disposal of hazardous waste of category 9.1 &amp; 9.2.</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">Notice u/s 33-A of the Water Act, 1974 &amp; u/s 31-A of the Air Act, 1981, revocation of consents under Water Act, 1974 &amp; Air Act, 1981 and revocation of authorization under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 was issued to the industry alongwith an opportunity of personal hearing before Chief Environmental Engineer (B) of the Board on 26.12.2022, which was postponed to 02.02.2023, wherein it was decided that:-</span></p> <p class="MsoPlainText" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">a)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry shall not operate its rotary furnace &amp; newly installed smelting furnace without obtaining consent to operate of the Board under the Water Act, 1974 &amp; Air Act, 1981.</span></p> <p class="MsoPlainText" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">b)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The Regional Office, Bathinda shall immediately seal the rotary furnace and newly installed smelting furnace, which have been installed/commissioned without obtaining 'consent to operate of the Board.</span></p> <p class="MsoPlainText" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">c)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry shall ensure the compliance of the&nbsp;</span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">guidelines/ Standard Operating Procedure prescribed for environmentally sound recycling of lead bearing Hazardous Waste&nbsp;</span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">alongwith compliance of conditions of consents granted under the Water Act, 1974 &amp; Air Act, 1981 &amp; authorization under HOWM Rules, 2016 at all times.</span></p> <p class="MsoPlainText" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">d)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">Environmental Engineer, Regional Office, Bathinda shall visit the industry immediately within 15 days to verify the compliance (s) / submissions made by the industry at site and thereafter submit report / recommendations in the matter.</span></p> <p class="MsoPlainText" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">e)<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">During hearing, it has been made clear to the proprietor of the industry that in case of any violation(s) in future, further action as deemed fit shall be initiated under the provisions of the Water Act, 1974; the Air Act, 1981 and HOWM Rules, 2016.</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp;</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">Now the industry has applied for obtaining varied consents to operate under the Water Act, 1974 &amp; Air Act, 1981 for production of battery plates @ 2000 nos/day and lead ingots @ 1350 TPA by using lead acid battery plates/ scrap @ 2000 TPA as it has installed new rotary furnace &amp; new smelting furnace in addition to the existing 2 no. mandir bhattis.</span></p> <p class="MsoNormal" style="text-align: justify;"><strong><em><span style="font-family: Tahoma, 'sans-serif';">The industry has submitted a letter issued by the Joint Director, Director of Factories, Punjab dated 16.02.2023, wherein it has been informed that after installation of rotary furnace and refining pot, the slag will be processed through modern technology and the production capacity of the lead smelting unit will remain the same for which the approval has already been granted by the Site Appraisal Committee vide letter no. 12269 dated 14.10.2011. Since, there is no increase in the production capacity as such no approval is required from the Site Appraisal Committee.</span></em></strong></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The visiting officer has reported that the site is located in the industrial focal point of Malout and SAC clearance is not required to the industry though it has undergone expansion.</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">The visiting officer has further reported that the industry was visited on 17.03.2023 and was not in operation; rotary furnace &amp; newly installed smelting furnace was found sealed in compliance to the decisions of the personal hearing dated 02.02.2023. Further, it has been reported that:-</span></p> <p class="MsoListParagraphCxSpFirst" style="text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; &nbsp;1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">Common APCD installed with 2 no. mandir bhatties and rotary furnace consisting of gravitiy settling chamber followed by cyclone followed by bag filter house followed by alkali scrubber as APCD. Separate APCD installed with the newly installed smelting furnace consisting of dust settling chamber followed by twin cyclone followed by bag filter house followed by alkali scrubber as APCD. Both the APCDs were found in line and with the adequate stack height.</span></p> <p class="MsoListParagraphCxSpMiddle" style="text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; &nbsp;2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">Impervious floor provided for storage of lead bearing waste.</span></p> <p class="MsoListParagraphCxSpMiddle" style="text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; &nbsp;3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">Neutralizing pit of capacity 1 KLD provided consisting of storage tank followed by reaction-cum-dozing tank followed by discharge for the effluent generated from the breaking of batteries (if any). The ETP installed was not in operation as there was no effluent generation.</span></p> <p class="MsoListParagraphCxSpMiddle" style="text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; &nbsp;4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">Acid proof flooring provided in the battery breaking area with the slope towards the collection tank of neutralizing pit. Manual scrap breaking specific area provided for breaking of scrap batteries.</span></p> <p class="MsoListParagraphCxSpMiddle" style="text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; 5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">House keeping of the industry has been improved and the industry has started maintaining record w.r.t. lifting of battery scrap.</span></p> <p class="MsoListParagraphCxSpLast" style="margin-left: 0.25in; text-align: justify; text-indent: -0.25in;"><span style="font-family: Tahoma, 'sans-serif';">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">The industry is complying with the provisions of the Water Act, 1974 &amp; Air Act, 1981 &amp; with the SOPs prescribed for such type of units.</span></p> <p class="MsoNormal" style="margin-bottom: 0.0001pt; text-align: justify;"><span style="font-family: Tahoma, 'sans-serif';">In view of above, if approved varied consents to operate under the provisions of the Water Act, 1974 &amp; Air Act, 1981 be granted to the&nbsp;</span><span style="font-family: Tahoma, 'sans-serif';">industry for six months, subject to the following conditions:-</span></p> <p class="MsoNormal" style="margin-bottom: 0.0001pt; text-align: justify;"><span style="font-size: 3pt; line-height: 4.6px; font-family: Tahoma, 'sans-serif';">&nbsp; &nbsp;</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"><span style="font-family: Tahoma, sans-serif;">1.&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">The industry shall not procure and process any hazardous waste as prescribed in Schedule-I appended to the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 beyond the permitted capacity i.e. 750 TPA as granted in the registration cum passbook issued to it on 11.01.2022 for utilization of lead acid batteries/lead scrap.</span></p> <p class="MsoListParagraphCxSpLast" style="margin-bottom: 0.0001pt; text-align: justify; text-indent: -0.25in; line-height: 24px;"><span style="font-family: Tahoma, 'sans-serif';">&nbsp; 2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-family: Tahoma, 'sans-serif';">The industry shall obtain revised registration/passbook for utilization of lead acid batteries/lead scrap @ 2000 TPA, which shall be obtained during the validity period of this consent.</span></p> <p style="margin: 0in 0in 0.0001pt 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px; background: white;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry shall ensure that in no case the production capacity of the industry shall exceed manufacturing of battery plates @ 1000 nos/day and lead ingots @ 500 TPA until it obtains revised registration-cum-passbook under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.</span></p> <p style="margin-left: 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px; background: white;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry shall provide the operational schedule and get analyzed its air emission sample from Board's lab within 2 months.</span></p> <p style="margin-left: 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px; background: white;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry will ensure compliance of SOPs prescribed by CPCB for such type of units, at all times.</span></p> <p style="margin-left: 0.5in; text-align: justify; text-indent: -0.25in; line-height: 24px; background: white;"><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;</span></span><span style="font-size: 11pt; line-height: 22px; font-family: Tahoma, 'sans-serif';">The industry shall ensure the compliance of conditions of consents to operate under the Water Act, 1974 &amp; Air Act, 1981; authorization under the Hazardous &amp; Other Waste Management Rules, 2016 and conditions stipulated while issuing registration certificate-cum-passbook, at all times.</span></p> <p style="text-align: justify; background: white;"><span style="font-size: 11pt; font-family: Tahoma, 'sans-serif';">Competency: CEE (B)</span></p>
Inspection: false
Inspection Note:
Officer: PPCB075
Reject: false
Reject Note:
Role: ZO EE Ruby Sidhu