Show ApplicationProcessingDetails

Id: 21680639
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-04-04 20:23:42.313
File Note: <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent has earlier applied for fresh Consent to Operate under the Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 for operating an STP of 2 MLD capacity at focal point, Derabassi, which was refused vide no. CTOW/Fresh/SAS/2022/17824118 &amp; vide no. CTOA/Fresh/SAS/2022/17824111 dated 12.05.2022 due to violations.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">Now, the project proponent has applied for fresh Consent to Operate under the Air (Prevention &amp; Control of Pollution) Act, 1981 for operating an STP of 2 MLD capacity.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent has deposited Rs. 14900/- vide UTR no. SDL51335573 dated 26.08.2019 under Air (Prevention &amp; Control of Pollution) Act, 1981, the consent fees deposited by the project proponent considering &ldquo;&rdquo;Class-A&rdquo; Municipal Council is inadequate.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent has submitted electricity bill as proof of date of commissioning, as per which date of connection is 04.03.2017. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent has submitted completion certificate of the work of upgradation, construction, rehabilitation of existing STPs based on MBBR technology issued by PSIEC to M/s SR Paryavaran Engineers Pvt. Ltd, 70, Industrial Area, Phase-1, Panchkula. The project proponent has submitted site plan of industrial focal point Derabassi with location of STP marked on it and with green area marked on it. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent has submitted DPR of the STP of 2 MLD capacity prepared by Ramky enviro Engineers Ltd, Hyderabad. As per which the components of the STP are as under:</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">Collection Tank &ndash; Screen &ndash; Equalization tank&ndash; Flash Mixer &ndash; Clariflocculator &ndash; MBBR &ndash; Secondary Clarifier &ndash; Sludge storage tank &ndash; filter press &ndash; sludge drying bed </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The STP has been designed considering inlet parameters of effluent as under:</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">pH - 6.3, O&amp;G &ndash; 25, EC &ndash; 2212, Turbidity &ndash; 17, TSS &ndash;<span style="mso-spacerun: yes;">&nbsp; </span>700, TDS &ndash; 1837, BOD -1260, COD &ndash; 2734, Lead - 0.06, Cadmium - &lt;0.01, Copper &ndash; 0.14, Zinc &ndash; 0.5, Chromium - &lt;0.01 &amp; Mercury - &lt;0.001.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The designed outlet parameters are as under:</span></p> <p class="MsoNormal"><!-- [if gte vml 1]><v:shapetype id="_x0000_t75" coordsize="21600,21600" o:spt="75" o:preferrelative="t" path="m@4@5l@4@11@9@11@9@5xe" filled="f" stroked="f"> <v:stroke joinstyle="miter"/> <v:formulas> <v:f eqn="if lineDrawn pixelLineWidth 0"/> <v:f eqn="sum @0 1 0"/> <v:f eqn="sum 0 0 @1"/> <v:f eqn="prod @2 1 2"/> <v:f eqn="prod @3 21600 pixelWidth"/> <v:f eqn="prod @3 21600 pixelHeight"/> <v:f eqn="sum @0 0 1"/> <v:f eqn="prod @6 1 2"/> <v:f eqn="prod @7 21600 pixelWidth"/> <v:f eqn="sum @8 21600 0"/> <v:f eqn="prod @7 21600 pixelHeight"/> <v:f eqn="sum @10 21600 0"/> </v:formulas> <v:path o:extrusionok="f" gradientshapeok="t" o:connecttype="rect"/> <o:lock v:ext="edit" aspectratio="t"/> </v:shapetype><v:shape id="Picture_x0020_1" o:spid="_x0000_s1026" type="#_x0000_t75" style='position:absolute;margin-left:1in;margin-top:0;width:312.15pt;height:298pt; z-index:251658240;visibility:visible;mso-wrap-style:square; mso-wrap-distance-left:9pt;mso-wrap-distance-top:0;mso-wrap-distance-right:9pt; mso-wrap-distance-bottom:0;mso-position-horizontal:absolute; mso-position-horizontal-relative:text;mso-position-vertical:top; mso-position-vertical-relative:text'> <v:imagedata src="file:///C:/Users/DELL/AppData/Local/Temp/msohtmlclip1/01/clip_image001.png" o:title="Untitled" croptop="4508f" cropbottom="8687f"/> <w:wrap type="square"/> </v:shape><![endif]--><!-- [if !vml]--><img src="file:///C:/Users/DELL/AppData/Local/Temp/msohtmlclip1/01/clip_image002.jpg" width="416" height="397" align="left" hspace="12" /><!--[endif]--><span lang="EN-IN"><br style="mso-special-character: line-break;" clear="all" /></span></p> <p class="MsoNormal"><span lang="EN-IN">The project proponent has submitted allotment of work of O&amp;M of STP to M/s S.R. Paryavaran Engineer pvt. Ltd. for 72 months vide no. PSIEC/EE-II/3106 dated 24.01.2023. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">The project proponent was given an opportunity of personal hearing before Worthy Chairman on 18.10.2022 for the violation of the provisions of Water (Prevention &amp; Control of Pollution) Act, 1974,<span style="mso-spacerun: yes;">&nbsp;&nbsp; </span>wherein it was decided as under:</span></p> <p class="MsoListParagraphCxSpFirst" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">1)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC shall operate its existing STP regularly and efficiently so as to achieve the prescribed standards of the Board framed for such type of discharges.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">2)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC shall get its exiting STP upgraded and shall develop the adequate plantation area by 31/12/2022.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">3)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC shall not discharge its untreated/ treated effluent into any River/ Drain/ Choe/ borewell/ rainwater harvesting etc. directly or indirectly, under any circumstances.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">4)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSEC shall apply for consent to operate as required under the Water (Prevention &amp; Control of Pollution) Act, 1974 and the Air (Prevention &amp; Control of Pollution) Act, 1981 within 7-days.</span></p> <p class="MsoListParagraphCxSpLast" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">5)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The Environmental Engineer, Regional Office, SAS Nagar shall visit the site after 7-day to verify contention of the representative of PSIEC and process the consent application to be applied by the PSIEC on merits.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">However, the PSIEC has failed to install the OCEMS on the STP and also failed to get the STP upgraded by 31.12.2022 in compliance with the timeline and the sample from outlet in October (F-coli-1400) and January (BOD-37 and F-coli-26000) are beyond the prescribed limits. Hence, the project proponent has been given an opportunity of personal hearing before Worthy Chairman on 05.04.2023. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN"><span style="mso-spacerun: yes;">&nbsp;</span>The STP was visited by undersigned on 01.03.2023 &amp; 03.04.2023 and contacted Sh. Swarandeep Singh, JE, PSIEC (7888674728). During visit it was observed as under:</span></p> <p class="MsoListParagraphCxSpFirst" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">1)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has installed STP of 2 MLD capacity for treating the domestic effluent generated from the industries located in Focal point, Derabassi. As per the layout plan there are 201 industrial plots in Focal Point, Derabassi. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">2)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The STP is based on MBBR technology having following components:</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">Coarse Screen Chamber &ndash; Collection tank &ndash; Fine screen chamber --<span style="mso-spacerun: yes;">&nbsp; </span>O &amp; G chamber &ndash; equalization tank &ndash; flash mixer &ndash; clarriflocculator &ndash; anoxic tank &ndash; MBBR-1 &amp; 1A &ndash; Secondary clarifier &ndash; UF feed tank<span style="mso-spacerun: yes;">&nbsp; </span>-- UF &ndash; treated water tank &ndash; Over head tank.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">3)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has installed CCTV cameras at various locations which are yet to be connected with PPCB server .</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">4)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has provided flow meter at inlet and outlet of STP and is maintaining record of operation of STP.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">5)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has provided OCEMS meter at the outlet of STP which was operational but yet to be connected with PPCB server.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">6)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has installed 2 no. DG set of capacity 125 KVA &amp; 65 KVA with canopy and in-adequate stack height. </span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">7)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has laid line for utilization of treated wastewater in the industrial plots as well as in the green parks but the parks are yet to be properly developed by PSIEC.</span></p> <p class="MsoListParagraphCxSpMiddle" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">8)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">As per record around 200-300 KLD effluent is being treated in the STP.</span></p> <p class="MsoListParagraphCxSpLast" style="margin-left: 71.25pt; mso-add-space: auto; text-align: justify; text-justify: inter-ideograph; text-indent: -53.25pt; mso-list: l1 level1 lfo2;"><!-- [if !supportLists]--><span lang="EN-IN" style="mso-fareast-font-family: Calibri; mso-fareast-theme-font: minor-latin; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin;"><span style="mso-list: Ignore;">9)<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-IN">The PSIEC has provided a byepass after secondary clarifier directly leading to treated water tank which was found to be plugged.</span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">In view of above, it is recommended that the application of &lsquo;consent to operate&rsquo; under the Air (Prevention &amp; Control of Pollution) Act, 1981 of PSIEC may be decided during hearing dated 05.04.2023. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN">Submitted please. </span></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><strong><span lang="EN-IN">*Competency &ndash; Worthy Chairman.</span></strong></p> <p class="MsoNormal" style="text-align: justify; text-justify: inter-ideograph;"><span lang="EN-IN"><span style="mso-spacerun: yes;">&nbsp;</span></span></p>
Inspection: false
Inspection Note:
Officer: PPCB114
Reject: false
Reject Note:
Role: RO AEE Piyush Jindal