Show ApplicationProcessingDetails

Id: 21758480
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-04-12 14:56:42.067
File Note: <p class="MsoNormal" style="text-align: justify; line-height: 150%;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><strong><span lang="EN-US">&nbsp;</span></strong><span lang="EN-US">It is intimated that&nbsp; earlier the consent to operate under Water (Prevention&amp; control of Pollution) Act, 1974 &amp; Air (Prevention &amp; control of Pollution) Act, 1981 was granted to the instituted vide online reference no. CTOW/Fresh/PKT/2022/19901026 &amp; CTOA/Fresh/PKT/2022/19901018 dated 28/09/2022, which are valid upto 31/03/2023 for 50 beds for the operation of Medical College and Institute. &nbsp;&nbsp;</span></span></p> <p class="MsoNormal" style="text-align: justify; line-height: 150%;"><span lang="EN-US" style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Now the institute has applied for obtaining renewal consent to operate under Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; Air (Prevention &amp; Control of Pollution) Act, 1981 for 50 beds for the operation of Medical College and Institute through OCMMS in a totally paperless manner by uploading necessary documents as PDF.</span></p> <p class="MsoNormal" style="text-align: justify; line-height: 150%;"><span lang="EN-US" style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The project proponent has already deposited Rs. 1,20,500/- vide UTR No. 500048308 dated 29/07/2022 &amp; Rs. 1,20,500/- vide UTR No. 424774447 dated 29/07/2022 and now deposited Rs. 60,000/- vide UTR no. 927400180 dated 04/04/2023 &amp; Rs. 49700/- vide UTR no. 346557690 dated 04/04/2023 as consent to operate fee under Water (Prevention &amp; Control of Pollution) Act, 1974 and Air (Prevention &amp; Control of Pollution) Act, 1981 including NOC regularization fee and Form downloading fee, which is adequate upto 30/09/2024 against total gross value of fixed assets worth Rs. 22,57,75,932/-/- as on 31/03/2023. &nbsp;&nbsp;&nbsp;&nbsp;</span></p> <p class="MsoListParagraph" style="margin-left: 1.6pt; text-align: justify;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><span lang="EN-US" style="color: red;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span lang="EN-US">The industry was visited by AEE of this office on 10/04/2023 and observed as under:- </span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">1.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The HCF is a 50 bedded<span style="letter-spacing: .45pt;"> </span>Institute.</span></span></p> <p class="TableParagraph" style="text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt; margin: 0in 4.85pt .0001pt 26.85pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">2.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The HCF has provided colour coded plastic bins at wards, operation theatre, ICU, and Nursing Stations for segregation of Bio Medical Waste and segregation was found as per Bio Medical Waste Management Rules,<span style="letter-spacing: 2.4pt;"> </span>2016.</span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">3.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The<span style="letter-spacing: .9pt;"> </span>HCF has provided needle destroyers for shredding of needles.</span></span></p> <p class="TableParagraph" style="text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.85pt 26.9pt; margin: 0in 5.15pt .0001pt 26.85pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">4.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The HCF has provided a final collection point for Bio Medical Waste and no mixing of Bio Medical Waste was found during<span style="letter-spacing: 2.55pt;"> </span>visit.</span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.85pt 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">5.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The<span style="letter-spacing: .45pt;"> </span>HCF<span style="letter-spacing: .3pt;"> </span>is<span style="letter-spacing: .3pt;"> </span>maintaining<span style="letter-spacing: .3pt;"> </span>the<span style="letter-spacing: .45pt;"> </span>record<span style="letter-spacing: .3pt;"> </span>of<span style="letter-spacing: .3pt;"> </span>Bio<span style="letter-spacing: .35pt;"> </span>Medical<span style="letter-spacing: .35pt;"> </span>Waste<span style="letter-spacing: .3pt;"> </span>lifted<span style="letter-spacing: .35pt;"> </span>to<span style="letter-spacing: .35pt;"> </span>CBWTF.</span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">6.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">There is a one Medical institute also, where MBBS courses are offered and about 100-150 students are currently enrolled. </span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">7.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">Hostels for these students are also provided within the premises. </span></span></p> <p class="TableParagraph" style="margin-left: 26.85pt; text-align: justify; text-indent: -21.5pt; mso-list: l0 level1 lfo1; tab-stops: 26.9pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><!-- [if !supportLists]--><span lang="EN-US" style="letter-spacing: -.05pt; mso-font-width: 134%;">8.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;">&nbsp;&nbsp;&nbsp; </span></span><!--[endif]--><span lang="EN-US">The institute has provided STP for the treatment of the entire effluent generated from the premises. During visit, sufficient quantity of raw effluent was not available and as such the STP was not in operation. </span></span></p> <p class="TableParagraph" style="text-align: justify; text-indent: 35.4pt; margin: 0in 4.65pt .0001pt 6.0pt;"><span lang="EN-US" style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;">&nbsp;</span></p> <p class="TableParagraph" style="text-align: justify; text-indent: 35.4pt; margin: 0in 4.65pt .0001pt 6.0pt;"><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><span lang="EN-US" style="letter-spacing: -0.05pt;">The</span><span lang="EN-US" style="letter-spacing: -0.25pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">HCF</span><span lang="EN-US" style="letter-spacing: -0.3pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">is</span><span lang="EN-US" style="letter-spacing: -0.3pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">a</span><span lang="EN-US" style="letter-spacing: -0.3pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">having</span><span lang="EN-US" style="letter-spacing: -0.35pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">built-up</span><span lang="EN-US" style="letter-spacing: -0.25pt;"> </span><span lang="EN-US" style="letter-spacing: -0.05pt;">area</span><span lang="EN-US" style="letter-spacing: -0.35pt;"> </span><span lang="EN-US">more<span style="letter-spacing: -.2pt;"> </span>than<span style="letter-spacing: -2.6pt;"> </span>20,000<span style="letter-spacing: 1.1pt;"> </span>sq.mts<span style="letter-spacing: 1.1pt;"> </span>and<span style="letter-spacing: 1.1pt;"> </span>as<span style="letter-spacing: 1.0pt;"> </span>per<span style="letter-spacing: 1.05pt;"> </span>the<span style="letter-spacing: 1.15pt;"> </span>EIA<span style="letter-spacing: 1.05pt;"> </span>Notification,<span style="letter-spacing: 1.05pt;"> </span>2006,<span style="letter-spacing: 1.05pt;"> </span>such<span style="letter-spacing: 1.1pt;"> </span>projects<span style="letter-spacing: 1.05pt;"> </span>needs<span style="letter-spacing: 1.05pt;"> </span>to<span style="letter-spacing: 1.05pt;"> </span>obtain<span style="letter-spacing: -2.65pt;"> </span><span style="letter-spacing: -.05pt;">prior</span> Environmental<span style="letter-spacing: .05pt;"> </span>Clearance<span style="letter-spacing: .05pt;"> </span>from<span style="letter-spacing: .05pt;"> </span>the<span style="letter-spacing: .05pt;"> </span>competent<span style="letter-spacing: .05pt;"> </span>authority<span style="letter-spacing: .05pt;"> </span>before<span style="letter-spacing: .05pt;"> </span>starting<span style="letter-spacing: .05pt;"> </span>its<span style="letter-spacing: -2.65pt;"> </span></span><span lang="EN-US">construction<span style="letter-spacing: .05pt;"> </span>activity.<span style="letter-spacing: .05pt;"> </span>The<span style="letter-spacing: .05pt;"> </span>HCF<span style="letter-spacing: .05pt;"> </span>was<span style="letter-spacing: .05pt;"> </span>commissioned<span style="letter-spacing: .05pt;"> </span>without<span style="letter-spacing: .05pt;"> </span>obtaining<span style="letter-spacing: .05pt;"> </span>Environmental<span style="letter-spacing: -2.55pt;"> </span>Clearance<span style="letter-spacing: .45pt;"> </span>under<span style="letter-spacing: .6pt;"> </span>EIA<span style="letter-spacing: .45pt;"> </span>Notification,<span style="letter-spacing: .5pt;"> </span>2006.<span style="letter-spacing: .4pt;"> </span></span><span lang="EN-US">The<span style="letter-spacing: .75pt;"> </span>HCF<span style="letter-spacing: .75pt;"> </span>has<span style="letter-spacing: .75pt;"> </span>constructed<span style="letter-spacing: .65pt;"> </span>the<span style="letter-spacing: .9pt;"> </span>premises<span style="letter-spacing: -2.6pt;"> </span><span style="letter-spacing: -.05pt;">without</span><span style="letter-spacing: 2.25pt;"> </span><span style="letter-spacing: -.05pt;">obtaining</span><span style="letter-spacing: 2.25pt;"> </span>the<span style="letter-spacing: 2.3pt;"> </span>Environmental<span style="letter-spacing: 2.25pt;"> </span>Clearance<span style="letter-spacing: 2.35pt;"> </span>from<span style="letter-spacing: 2.3pt;"> </span>the<span style="letter-spacing: 2.55pt;"> </span>competent<span style="letter-spacing: 2.2pt;"> </span>authority<span style="letter-spacing: 2.35pt;"> </span>in<span style="letter-spacing: -2.6pt;"> </span><span style="letter-spacing: -.05pt;">compliance</span><span style="letter-spacing: -.3pt;"> </span><span style="letter-spacing: -.05pt;">to</span><span style="letter-spacing: -.3pt;"> </span><span style="letter-spacing: -.05pt;">the</span><span style="letter-spacing: -.2pt;"> </span><span style="letter-spacing: -.05pt;">EIA</span><span style="letter-spacing: -.4pt;"> </span><span style="letter-spacing: -.05pt;">Notification,</span><span style="letter-spacing: -.3pt;"> </span><span style="letter-spacing: -.05pt;">2006.</span><span style="letter-spacing: -.2pt;"> </span>The Board has filed<span style="letter-spacing: .8pt;"> Criminal Case </span>against the said HCF cum Medical College under the provisions of the EPA Act, 1986 for violating the provisions of the EIA Notification, 2006 in the court of Hon&rsquo;ble CJM, Pathankot. </span></span></p> <p class="TableParagraph" style="text-align: justify; text-indent: 35.4pt; margin: 0in 4.65pt .0001pt 6.0pt;"><span lang="EN-US" style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;">The representative has submitted that the whole area include the area covered by the college as well as hospital. However, the area covered individually by the hospital and the college is below 20,000 sq.mts and as such EC is not covered.&nbsp;&nbsp;&nbsp; </span></p> <p class="TableParagraph" style="text-align: justify; text-indent: 35.4pt; margin: 0in 4.65pt .0001pt 6.0pt;"><span lang="EN-US" style="font-family: tahoma, arial, helvetica, sans-serif; font-size: 12pt;">The Institute has made a representation to SEIAA mentioning that the built-up area of the hospital less than 20,000 sq.mts and as such EC under EIA notification, 2006 is not required. The SEIAA has forwarded the request of the Institute to the Board requesting to submit detailed report regarding component wise built-up area of the medical college and hospital. The exercise will be done shortly and detailed report shall be sent to the competent authority. &nbsp;</span></p> <p><span style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"> <span lang="EN-US">&nbsp; It is pertinent to mention here that the authorization under Bio Medical Waste (Management) Rules, 2016 was granted vide online reference no. BMW/Renewal/PKT/2022/19844688 dated 12/09/2022, which is valid upto 30/09/2023 for 50 beds.</span></span></p> <p><span lang="EN-US" style="font-size: 12pt; font-family: tahoma, arial, helvetica, sans-serif;"><span lang="EN-US">In view of above, it is recommended that the renewal of consent to&nbsp; operate under Water (Prevention &amp; Control of Pollution) Act, 1974 and&nbsp; Air&nbsp; Prevention&nbsp; &amp;&nbsp; Control of Pollution) Act, 1981 may be granted to the institute for short &nbsp;term upto 30/09/2023.</span></span></p>
Inspection: false
Inspection Note:
Officer: PPCB152
Reject: false
Reject Note:
Role: RO AEE Varinderjeet Singh