Show ApplicationProcessingDetails

Id: 21773173
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-04-13 19:32:37.062
File Note: <p>Discussed with SEE, ZO-II on 13.04.2023 EE,RO vide his note dated 11.04.2023 has calculated Rs 5.25 Lacs as EC for the violation period. Submitted for approval as proposed vide SEE,ZO-II note dated 31.03.2023 with additional condition that:-</p> <p>1. EC of Rs 1 lac be imposed as already imposed to other similar units and industry be directed to deposit BG of the balance amount i.e. 5.25-1 lac = 4.25 lacs as an assurance not to repeat the violations.</p> <p>2. The industry shall not operate beyond the production beyond 5400 KGD at its sealed capacity and will not discharg beyond&nbsp; 100 KLD of effluent.</p> <p>3. EE, RO&nbsp; to monitor the SCADA data regularly&nbsp; to ensure that industry operates below the allowable discharge quantity and in case of discharge exceeds the allowable limits action will be taken against the industry.</p>
Inspection: false
Inspection Note:
Officer: PPCB017
Reject: false
Reject Note:
Role: CEE Sandeep Bahl