Show ApplicationProcessingDetails

Id: 21845317
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-04-21 13:31:25.541
File Note: <p style="text-align: justify;">The agenda note and report / recommendations of AEE/EE, RO, may kindly be perused.</p> <p style="text-align: justify;">&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;It is intimated that the industry is small scale red category dyeing unit and discharging its effluent into the conveyance system of CETP 50 MLD.</p> <p style="text-align: justify;">&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The industry was granted consent to operate under Air (Prevention &amp; Control of Pollution) Act, 1981 valid upto 04.01.2023.</p> <p style="text-align: justify;">&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Now, the industry has applied for varied&nbsp;consent to operate under Air Act, 1981 for the production of Dyeing Of Knitted Fabric &amp; Polyester Fabric@ 12 TPD (for changed production). The industry had already deposited consent fee, which is adequate upto 30.06.2024.</p> <p style="text-align: justify;">&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The industry was visited by AEE of RO on 22.03.2023 and it was observed that:-</p> <p style="text-align: justify;">1.&nbsp;&nbsp;&nbsp;&nbsp;The industry was not in operation during visit, due to electric disconnection.</p> <p style="text-align: justify;">2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The&nbsp;industry has installed a boiler of capacity 08 TPH attached with cyclone separator alongwith adequate stack height. Rice husk was lying at site for using fuel in its boiler.</p> <p style="text-align: justify;">3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The industry has installed one DG set of 125 KVA with canopy along with adequate stack height.</p> <p style="text-align: justify;">With the operation of 3 soft flow machines of capacity 300 Kg each, the waste water generation will be 97.2 KLD and Dyeing Of Knitted Fabric &amp; Polyester Fabric @ 5400 Kg/day is to be curtail.</p> <p style="text-align: justify;">The site of industry falls in light and service industrial zone as per Master Plan, Ludhiana vide CLU issued by MCL letter no. 312 dated 24.02.2016.</p> <p style="text-align: justify;">Hence, till the finalization of the allotment of the shares of CETP 50 MLD, it is recommended that consent to operate under Air (Prevention &amp; Control of Pollution) Act, 1981 may be granted with usual conditions, please.&nbsp;</p> <p style="text-align: justify;">Competency :</p> <p style="text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px;">Consent : SEE (ZO)</p>
Inspection: false
Inspection Note:
Officer: PPCB089
Reject: false
Reject Note:
Role: ZO EE Satyajit Attri