| File Note: |
<p>As directed, the corrected contents of the visit details are as under: -</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">1) The industry was not in operation, but has installed all of its proposed plant & machinery for the rice sheller.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">2) The industry has covered all the processing sheds.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">3) The industry has provided separate cyclone separator as APCD with shelling section as well as dryer section with adequate stack height to control the process emissions. All the dust emitting points are hooded and connected to the cyclone separator.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">4) The industry had provided brick road from main gate of the industry to the rice husk area for the movements of vehicles.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">5) The industry had made plantation along the boundary wall of the rice sheller.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">6) The industry has provided brick wall of 10 feet height and wind screen of 5 feet height over the said wall, in front of the discharge point of rice husk area and the length of aforesaid brick wall is 35' on each side of the rice husk discharge point.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">7) The industry had no source of trade effluent generation and only domestic effluent is being discharged onto land for plantation after septic tank.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">8) The industry has submitted a copy of its building plan prepared from the competent person approved under Director of Factories, Punjab. The industry has submitted completion certificate as from M/s Environmental Management Solutions, Patiala.</p>
<p style="color: #5d5d5d; font-family: Verdana, Arial, Helvetica, sans-serif; text-align: justify; background-color: #ffffff;">In view of above, it is again recommended that the fresh consent for operation of rice sheller unit to manufacture Sorted Raw Rice with Dryer @ 6.0 TPH by using Paddy @ 9.0 TPH as raw material may be granted to the industry upto 30.09.2032 with specific conditions as mentioned in agenda note.</p> |