Show ApplicationProcessingDetails

Id: 23117267
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2023-08-06 21:29:51.901
File Note: <p class="MsoNormal" style="margin-left: -1.45pt; text-align: justify; text-indent: 72.35pt; line-height: 150%; background: white;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">It is submitted that the industry was granted Consent to Establish/NOC vide no.&nbsp;CTE/Fresh/MNS/2022/19421963 dated 27/07/2022, which was valid upto 26/07/2023 for establishment of rice sheller unit of capacity 3 TPH of Raw rice/Sorted Rice with dryer, subject to the conditions mentioned therein.</span></p> <p class="MsoNormal" style="margin-left: -1.45pt; text-align: justify; text-indent: 72.35pt; line-height: 150%; background: white;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">Now, the industry has applied for obtaining fresh consent to operate under the Water Act, 1974 &amp; the Air Act, 1981 through OCMMS for operation of rice sheller unit of capacity 3 TPH of Raw rice /Sorted Rice with Dryer under the Orange category as per the prevailing policy.</span></p> <p class="MsoNormal" style="margin-left: -1.45pt; text-align: justify; text-indent: 72.35pt; line-height: 150%; background: white;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has submitted the approved building plan from competent person recognized by Director of Factories, Punjab and completion certificate of APCD&rsquo;s installed</span><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: red; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">.</span><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">&nbsp;</span></p> <p class="MsoNormal" style="margin-left: -1.45pt; text-align: justify; text-indent: 72.35pt; line-height: 150%; background: white;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">The industry has also submitted the CA certificate dated 20.07.2023, wherein, the value of total fixed assets of the unit is Rs. 98.87 lakhs. </span><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US; mso-fareast-language: EN-IN; mso-bidi-language: PA;">Accordingly, the industry has deposited consent fee of Rs. 39,200/- vide UTR. No. N206232562644043 dated 25.07.2023 under the Water Act, 1974 &amp; Rs. 39,200/- vide UTR No. N206232562641419 dated 25.07.2023 under the Air Act, 1981. As such, as per circular dated 29.10.2018, after deducting 50% penalty, the fee deposited by the industry under both the Acts is adequate upto 30.04.2029. The adequacy of fee has calculated on the basis of date of commissioning of the unit i.e. November 2022.</span></p> <p class="MsoNormal" style="margin-bottom: .0001pt; text-align: justify; text-indent: 70.9pt; line-height: 150%;"><span style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Times New Roman'; mso-bidi-font-family: 'Times New Roman'; color: black; mso-themecolor: text1; mso-fareast-language: EN-IN; mso-bidi-language: PA;">Further,</span><span style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: Georgia; mso-bidi-font-family: Georgia; mso-font-width: 110%;"> the industry was visited by the AEE on 03.08.2023 and Sh. Anil Goyal, Partner was contacted. During visit, it was observed as under:</span></p> <p class="MsoListParagraph" style="margin-left: 36.0pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;">The </span><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif';">industry was not</span><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;"> in operation due to off season in the Rice Mills.</span></p> <p class="MsoListParagraph" style="margin-left: 36.0pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; color: black; mso-ansi-language: EN-US;">The industry has installed cyclone separator as APCD with shelling section and paddy cleaning section of the drier separately.</span></p> <p class="MsoListParagraph" style="margin-left: 35.45pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;">The industry has provided brick wall of 10' height with adequate length and further wind screen of 5' height has provided on the said wall.</span></p> <p class="MsoListParagraph" style="margin-left: 35.45pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;">The industry has planted sapling along its boundary wall.</span></p> <p class="MsoListParagraph" style="margin-left: 35.45pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;">The industry has provided septic tank for treatment of domestic effluent.</span></p> <p class="MsoListParagraph" style="margin-left: 35.45pt; text-align: justify; text-indent: -18.0pt; line-height: 150%; mso-list: l0 level1 lfo1; background: white;"><!-- [if !supportLists]--><span style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style'; color: black; mso-themecolor: text1;"><span style="mso-list: Ignore;">6.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-size: 11.0pt; line-height: 150%; font-family: 'Bookman Old Style','serif'; mso-bidi-font-family: Tahoma; mso-ansi-language: EN-US;">The industry has provided brick paved on movement area of the vehicles.</span></p> <p class="MsoNormal" style="text-align: justify; text-indent: 70.9pt; line-height: 150%;"><span style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: Georgia; mso-bidi-font-family: Georgia; mso-font-width: 110%;">From above, it is clear that the unit is complying with the code of practice stipulated for such units and provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; the Air (Prevention &amp; Control of Pollution) Act, 1981.</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 12pt 5pt; text-indent: 70.9pt; line-height: 150%; text-align: justify;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: Georgia; mso-bidi-font-family: Georgia; mso-font-width: 110%;">In view of above, it is recommended that fresh consent to operate under the provisions of the Water (Prevention &amp; Control of Pollution) Act, 1974 &amp; the Air (Prevention &amp; Control of Pollution) Act, 1981 for operation of rice sheller unit of capacity 3 TPH of Raw rice/Sorted Rice with Dryer may be granted to the unit upto 30.09.2028 </span><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">with suitable conditions along with special conditions that:</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 2cm; text-indent: -20.7pt; line-height: 150%; text-align: justify;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style';"><span style="mso-list: Ignore;">1.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry will get its stack emissions samples analyzed from Board's lab within 2 months, positively.</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 2cm; text-indent: -20.7pt; line-height: 150%; text-align: justify;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style';"><span style="mso-list: Ignore;">2.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry will discharge only treated domestic effluent onto land for plantation / green belt.</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 2cm; text-indent: -20.7pt; line-height: 150%; text-align: justify;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style';"><span style="mso-list: Ignore;">3.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry shall not increase its existing land area without prior permission of the Board. </span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 2cm; text-indent: -20.7pt; line-height: 150%; text-align: justify;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style';"><span style="mso-list: Ignore;">4.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry shall not increase its production capacity without the prior written permission/NOC of the Board.</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 2cm; text-indent: -21.25pt; line-height: 150%; text-align: justify;"><!-- [if !supportLists]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif'; mso-fareast-font-family: 'Bookman Old Style'; mso-bidi-font-family: 'Bookman Old Style';"><span style="mso-list: Ignore;">5.<span style="font: 7.0pt 'Times New Roman';">&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><!--[endif]--><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">The industry shall comply with the code of practice notified by the Govt. of Punjab, Department of Science, Technology &amp; Environment vide order dated 15.10.2013 as follows:</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">i)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>All the processing sheds be covered and have minimum ventilation as per the recommendations of Director of Factories.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">ii)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>The industry should plant thick plantation of spreading crown varieties of evergreen trees all along the boundary wall of the rice sheller/ Saila plant.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">iii)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>All dust emitting points should be properly hooded and dust extracted to a common point. At this exhaust point, dust coming here will be passed through a dust control system and air will be emitted through a stack of height 3 meters above roof of the building.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">iv)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>The management and handling of rice husk in the rice shelling units/ Saila plants should be done as under:</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">(a) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp; </span>All the rice shelling units/ Saila plants shall provide paved/brick roads/cement concrete roads / metalled roads inside their premises for movement of vehicles, so as to prevent the generation of dust.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';">(b) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp; </span>(i) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>The industry shall provide proper rice husk storage facilities inside the factory premises and the height of brick wall in front of the discharge point of rice husk area should be at least 10' high or 3.5' higher than the discharge point of the rice husk pipe (whichever is more) and the length of aforesaid brick wall should be at least 35' on each side of the rice husk discharge pipe.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';"><span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>(ii) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp; </span>The industry shall provide a layer of wind screen of mild steel or some other similar material of at least 5' height above the brick wall. The wind screen system should have a porosity of ~30% to lower the wind velocities, thus reducing the amount of airborne particulate from storage, handling and loading/unloading areas of rice husk.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify; text-indent: -36.0pt;"><span style="font-family: 'Bookman Old Style','serif';"><span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>(iii)<span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp; </span>The minimum diameter at the outlet of discharge pipe of rice husk be kept as 15'', which can be maintained by extending the existing discharge pipe with the help of a conical shaped pipe of at least 3'length.</span></p> <p class="MsoNormal" style="margin-left: 108.0pt; text-align: justify;"><span style="font-family: 'Bookman Old Style','serif';">(iv) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp; </span>Wherever, height of rice husk is 3' or more, the industry shall cover the heap of husk with HDPE warp knitted fabric completely, except the area near the discharge pipe. The HDPE warp knitted fabric be made of 100% virgin high density polymer of at least 70 gm/m2 weight having 40-45 hole/inch2 to prevent wind blowing of stored husk.</span></p> <p class="MsoBodyText" style="margin: 0cm 5.65pt 0.0001pt 108pt; text-indent: -36pt; text-align: justify;"><span lang="EN-US" style="font-family: 'Bookman Old Style','serif';">(c) <span style="mso-tab-count: 1;">&nbsp;&nbsp;&nbsp;&nbsp; </span>During transportation of rice husk through vehicles, it shall be covered from all sides with tarpaulin to prevent blowing of husk by winds.</span></p>
Inspection: false
Inspection Note:
Officer: PPCB145
Reject: false
Reject Note:
Role: RO AEE Harsimran Singh