Show ApplicationProcessingDetails

Id: 24675625
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-01-09 23:23:11.94
File Note: <p class="MsoNormal" style="text-align: justify;"><span style="font-size: 12.0pt; line-height: 107%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">Discussed, Sir, it is submitted that the industry has installed rendering plant equipment of capacity 4 Ton per batch (i.e. 6 hours) for offal&rsquo;s and blood. The same is equipped with in-built deodorizer system consisting of two stage condenser. A condition to ensure its operation in proper manner has been imposed in the conditions at Sr. No.4 in note dated 05.01.2024. </span>&nbsp;Thus, Sir, if approved, action as proposed vide undersigned note dated 05.01.2024 with addition of one more condition as under be taken, please:</p> <p class="MsoNormal" style="text-align: justify;"><span style="font-size: 12.0pt; line-height: 107%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">Addition</span></p> <p class="MsoNormal" style="text-align: justify;"><span style="font-size: 12.0pt; line-height: 107%; mso-bidi-font-family: Calibri; mso-bidi-theme-font: minor-latin; color: #5d5d5d; background: white;">The industry shall also install systems along periphery to absorb fugitive odorous emissions from the processes. <span style="mso-spacerun: yes;">&nbsp;</span><span style="mso-spacerun: yes;">&nbsp;</span></span></p>
Inspection: false
Inspection Note:
Officer: PPCB101
Reject: false
Reject Note:
Role: EE PBIP Kamal Singla