Show ApplicationProcessingDetails

Id: 24726172
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-01-16 16:45:27.139
File Note: <p dir="ltr" style="line-height: 1.38; margin-top: 0pt; margin-bottom: 0pt; padding-left: 40px;"><span style="font-size: 16pt; font-family: 'Google Sans'; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; vertical-align: baseline; white-space-collapse: preserve;">It is submitted the industry has installed 6 no. Handies&nbsp; with capacity 12 tonne each and 21 tanks handies of capacity 4.5 ton each.&nbsp; The industry has installed total of 08 no.dryers of capacity 24 TPH each , 06 no. Dryers were connected to the steamed section and 02 no. to the raw rice production section. As per representative, 1.5 to 02 no.round of each dryer are obtained in steamed rice production and 1.25 to 1.5 round of each dryer will be obtained in Saila rice production. Further, the industry has installed 02 no. Shelling lines and 02 no. Paddy pre-clearners and cyclone separators has been provided as APCD with each one of them with adequate stack of height. The industry has installed 03 no. sortex @ 5 TPH each.</span></p> <p>&nbsp;</p> <p dir="ltr" style="line-height: 1.38; margin-top: 0.0pt; margin-bottom: 0.0pt;"><span style="font-size: 16pt; font-family: 'Google Sans'; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; vertical-align: baseline; white-space-collapse: preserve;">Incorporating the other details of the previous note, Submitted for action as recommended in agenda note , please.</span></p>
Inspection: false
Inspection Note:
Officer: PPCB149
Reject: false
Reject Note:
Role: RO AEE Anish Sharma