Show ApplicationProcessingDetails

Id: 24768854
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-01-23 13:41:12.21
File Note: <p dir="ltr" style="line-height: 1.38; margin-top: 0.0pt; margin-bottom: 0.0pt;"><span style="font-size: 16pt; font-family: 'Google Sans'; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; vertical-align: baseline; white-space-collapse: preserve;">As discussed,&nbsp; the industry (ready mix concrete plant ) complying with general siting criteria of Board and as per DTP report it is suitable to installed ready mix concrete plant at the mentioned site. </span></p> <p>&nbsp;</p> <p dir="ltr" style="line-height: 1.38; margin-top: 0.0pt; margin-bottom: 0.0pt;"><span style="font-size: 16pt; font-family: 'Google Sans'; font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-variant-position: normal; vertical-align: baseline; white-space-collapse: preserve;">Incorporating the observations of the note dated 22.01.2024, It is therefore recommended that consent to operate under the Water Act and Air Act may be granted to the industry for a period upto 31.12.2028 ( adequacy of consent fees) for operation of ready mix concrete plant at mentioned site subject to the suitable conditions and specific condition that the industry shall not install hot mix plant at this site without NOC of the Board.</span></p>
Inspection: false
Inspection Note:
Officer: PPCB149
Reject: false
Reject Note:
Role: RO AEE Anish Sharma