Show ApplicationProcessingDetails

Id: 24942956
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-02-14 15:43:03.494
File Note: Earlier, the Consent to Establish was granted to the industry for establishment of Dyeing unit @ 12 MTD subject to suitable conditions which was valid upto 15.03.2024 with boiler of capacity 6 TPH with rice husk as fuel and thermopack of capacity 2500000 Kcal/Hr and rice husk as fuel. Now, the industry has applied for further extension in validity of Consent to Establish under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 with increased boiler capacity @ 8 TPH with paddy straw/rice husk as fuel and thermo-pack of same capacity, but with changed fuel i.e. paddy straw/rice husk along with requisite documents and fees. The industry has submitted the request letter for extension of CTE and has submitted that due to unavoidable circumstances and financial issues, the project is delayed. The applicant has also submitted Registered deed of the land, compliance of the earlier conditions, Geo-Technical Investigation report of the Soil, Feasibility report for ETP of capacity 1000 KLD as well as APCD, Site plan/Location plan etc. The industry has also submitted amended feasibility report of 8 TPH boiler and that of thermo-pack of capacity 2500000 Kcal/Hr As per feasibility report, the industry has proposed to install twin cyclone separators as APCDs on boiler as well as on thermo-pack. Common stack of adequate height with proper sampling arrangements have been proposed. No change in effluent quantity/ production has been made. The documents submitted by the industry may kindly be perused. The industry has also submitted a project report which may kindly be perused. The industry has also submitted water balance for the same. The applicant has proposed the ETP of capacity 1000 KLD for treatment of the same based on Physio-Chemical followed by Biological treatment. The applicant has also proposed a combined Multi-cyclone as APCD with the Boiler of capacity 8 TPH and Thermopac of 10 Kcal capacity. The pollution control devices proposed by the industry appears to be adequate in-principle. The industry has provided plantation area of 80 Kanal 3 marlas as per the Site plan which is adequate for the proposed trade effluent generated as per the Soil permeability report submitted by the industry. The site was visited by the undersigned on 13.02.2024 and it was observed that the industry has just started its construction on site. The industry has developed the land and boundary wall work has been completed. No plant and machinery have been procured till date. The applicant informed that due to delay in loan, the project will take another 1 years to complete. In view of the above it is recommended that extended in the validity of consent to establish (NOC for extension) under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 may be granted to the industry for establishment of Dyeing unit for dyeing of cotton, PC and Polyester fabric @ 12 MTD and with increased boiler capacity @ 8 TPH with paddy straw/rice husk as fuel and thermo-pack of same capacity, but with changed fuel i.e. paddy straw/rice husk with suitable terms and conditions. Comp: CEE, Ludhiana
Inspection: false
Inspection Note:
Officer: PPCB092
Reject: false
Reject Note:
Role: RO AEE Deepak Chadha