Show ApplicationProcessingDetails

Id: 24951870
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-02-20 22:48:55.257
File Note: Sir kindly peruse the note of RO as well as AEE(PBIP). If approved, action as proposed by AEE (PBIP) regarding issuance of Consent to Operate under the Air Act,1981 for production of Pasteurized Milk @ 3600 Kgs/day, Butter @ 2200 Kgs/day, Ghee @ 300 Kgs/day and SMP @ 5400 Kgs/day by using Milk @ 300000 Liter/day as raw material upto 31.03.2028 subject to the following conditions be taken, please: 1) This consent to operate has been granted for manufacturing of Pasteurized Milk @ 3600 Kgs/day Butter @ 2200 Kgs/day Ghee @ 300 Kgs/day SMP @ 5400 Kgs/day by processing milk to the tune of 300000 Liter/day or 300 KLD, only. 2) The industry shall install Continuous Emission Monitoring System with the stack of the boiler of capacity 12 TPH by 31.03.2024 and connect the same to the server of PPCB upon installation within 15 days. 3) The industry shall get the stack emission sample analysed from the Board’s Laboratory within one month. 4) The industry shall ensure that the emissions from stack shall conform to the emission standards laid down by the Board from time to time. 5) The industry shall properly operate & maintain its air pollution control devices so as to contain all the suspended particulate matter and gaseous emissions within the permissible limits prescribed by the Board / MoEF&CC. 6) The industry will comply with zoning regulations of HUD/ Department of Town & Country Planning/ Local Government and shall bound to comply with the bye-laws of the Master Plan already prepared/ to be prepared by the Department of Town and Country Planning, Punjab. 7) The industry shall make use of alternatives of single use plastics (SUP) within its premises and will not use any SUP items banned in accordance with MoEF&CC notification no. G.S.R. 571(E) dated 12.08.2021. 8) The industry shall ensure that the activities of unit does not create any nuisance in the surrounding areas and no public complaints are received. In case, any complaint is received against the unit, the Board shall be at liberty to revoke/ cancel this consent without giving any opportunity of hearing to the industry. 9) The consent to operate is being issued to the industry based upon the documents/ information submitted by it alongwith the online application form. The Board would be at liberty to take penal action against the industry and its responsible/ concerned person(s) in case information/document is detected as incorrect/false/misleading at any point of time, without any opportunity of Personal Hearing. 10) In case the industry fails to comply with the provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to the project and Rules, Circulars & Directions issued by the Board from time to time, action as deemed fit shall be taken against the project proponent. A copy of the aforesaid CTO be endorsed to the Environmental Engineer, Regional Office, Patiala with a request to ensure that the compliance of special conditions especially 2 is made by the industry in true letter & spirit. He is also requested to carry out the stack monitoring within one month upon operation of the unit and submit report to Competent Authority.
Inspection: false
Inspection Note:
Officer: PPCB101
Reject: false
Reject Note:
Role: EE PBIP Kamal Singla