Date Created: 2024-02-26 08:35:43.297
File Note: In reference to the clarification raised by the zonal office the reply is as under 1. The industry generate very small quantity of trade effluent @ 0.16 KLD. As per record and last CTO application it has already installed ETP of adequate Capacity to treat the same and installed the flow meter at the outlet of ETP . 2. The industry now has deposited the extended bank Bank Gurantee of Rs. 1 lac ,which is valid for further one year,. 3.Presently,the unit is not in operation due to disconnection ,however the industry vide its letter dot 22.2.24 has informed that they have planned to shift from furnace oil to wood after the re-start of unit. Submitted plz