Show ApplicationProcessingDetails

Id: 25034182
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-02-29 10:56:26.186
File Note: Further, it is intimated that the project proponent has obtained Environmental Clearance under EIA notification vide no. SEIAA/M.S./2012/36363 dated 30.08.2012 mentioning that “The total water requirement for the project will be 67 KLD, which will be met by MC water supply, and permission in this regard will be obtained from MC Ludhiana. About 54 KLD of total wastewater will be generated, which will be treated in a sewage treatment plant of capacity 60 KLD and the STP will be installed based on SAFF technology. Out of a total of 49 KLD of total treated wastewater to be generated at the outlet of STP, 43 KLD will be discharged to-MC sewer and 6 KLD will be utilized for irrigation of green area to be developed in 1755 sqm in the summer season. In the winter season, 44 KLD shall be discharged into the sewer and 5 KLD shall be utilized for irrigation of green area. In the rainy season, 46 KLD shall be discharged into the sewer and 3 KLD will be utilized for irrigating green area, total generation of MSW has been estimated as 198 Kg/day, which will be segregated in a separate area earmarked for segregation of solid waste. The recyclable solid waste shall be sold out to the local kabaris. The biodegradable waste and inert waste shall be sent to the dumping site of the MC and NOC in this regard has been obtained from MC Ludhiana.” Submitted ,please
Inspection: false
Inspection Note:
Officer: PPCB054
Reject: false
Reject Note:
Role: RO EE Kuldeep Singh