Show ApplicationProcessingDetails

Id: 25082299
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-03-05 13:55:55.628
File Note: As per the previous consent the industry was granted consent to operate for manufacturing of Corrugated Box & Sheet @ 25 MTD whereas now it has been mentioned in the agenda as Corrugated Boxes and Sheets 70 MT/day. Compliance of the reasons for disconnection of electric supply. Reply: The previous consent as well as restoration was granted by the Board to the industry with same product i.e. Corrugated Boxes and Sheets 70 MT/day, however instead of generating full certificate, extension certificate was generated by the Competent Authority. Further all the products and raw materials were same in the previous agendas based on which short term consents and restoration of electric connections was granted by the Board. Presently the industry has applied for permanent restoration along with no changes in product and raw material. The disconnection was done due to non complying with discharge standards. Compliance of HWM Rules 2016. Reply: The industry has not obtained authorization under HWM Rules, 2016 Total land area details for plantation not mentioned in the agenda. Reply: Total land area for plantation is 0.2 acre, which is adequate for disposal of trade effluent @ 7.0 KLD and domestic effluent @ 5.0 KLD ETP has been mentioned as not operational No details regarding treatment of domestic effluent mentioned Water meter readings not mentioned. Reply: The domestic effluent is discharge onto land for plantation through septic tank. During the last sampling the ETP was operational and results are within the limits. DG set details not mentioned. Reply: The industry has installed 2 nos. D.G set of capacity 250 KVA and 125 KVA with canopy provided and adequate stack height. There is increase in total investment from 850 Lakhs to 1650 Lakhs. No details mentioned in the agenda. Reply: The total investment of 833.38 made by the industry was in the year 2017 and lastly when consents were renewed, the investment was 1502.03 and presently the investment is 1650.93 and as per CA certificate submitted, no significant increase has been made in the plant and machinery, nor any production has been increased. Give proper values and results of the various samples collected for permanent restoration. Reply: Date of sample = 23.01.2023 pH= 7.2, TSS= 42, TDS=790, COD=272, BOD= 50 and Oil & grease= 6.0 Date of sample = 06.10.2023 pH= 7.2, TSS= 42, TDS=790, COD=272, BOD= 50 and Oil & grease= 6.0 Date of sample = 11.01.2024 pH= 7.2, TSS= 25, TDS=1034, COD=48, BOD= 10 and Oil & grease= BDL. Submitted, please.
Inspection: false
Inspection Note:
Officer: PPCB092
Reject: false
Reject Note:
Role: RO AEE Deepak Chadha