Show ApplicationProcessingDetails

Id: 25083914
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-03-05 15:41:49.812
File Note: Sir, the industry is a small scale red category unit and has applied for fresh of consent to operate under Water Act, 1974 & Air Act, 1981 along with requisite documents. The industry has submitted approved building plan from architect approved by Director of Factories, Punjab. The industry has submitted MSME certificate as a proof of date of commissioning. The site of the industry falls in industrial zone as per the khasra number mentioned in gazzete notification. The site of industry was visited by RO on 29.02.2024 and it was reported as under:- 1. The industry was in operation during visit and engaged in manufacturing of cycle parts. 2. The industry has signed agreement with M/s JBR Technology Pvt. Ltd., Focal Point, Phase-8 Ludhiana @ 6000 Ltr/M for the treatment & disposal of trade effluent generated from phosphating process. 3. The industry has installed water meter at pipeline from where fresh water is consumed in process. The representative of the industry informed that they have started trial of the phoshpating plant only and the same shall be operationalized fully by next month. 4. The industry has recently started its operation and is maintaining the record of fresh water consumed in process area and trade effluent lifted to CETP operator. 5. The industry is discharging only domestic effluent into sewer. 6. The industry has provided storage tank of capacity 4000 Ltr and approx. 500 Ltr of effluent was lying in storage tank as observed during the visit. 7. Domestic effluent is being discharged into sewer. 8. The industry has installed 1 no powder coating booth, 2 no. paint booth with water curtain as APCD and 2 no. baking oven (LPG). 9. The industry has installed 3 no. D.G. sets of capacity 250 KVA, 125 KVA & 63 KVA with canopies and adequate stack height. 10. The industry has submitted building plan from architect approved by Director of Factory, Pb. 11. The industry has applied for fresh consent after depositing NOC regularization fee and the compliance to the conditions of the NOC is attached alongwith in annotated form countersigned by visiting officer. The compliance was verified during the visit and was found to be correct. 12. The industry is complying with the provisions under Water Act, 1974 & Air Act, 1981. Consent fee is adequate upto 30.06.2028. In view of above, it is recommended that consent to operate under Water Act, 1974 may be granted to the industry upto 30.06.2028, please. (Category -Red, small) (Competency -SEE)
Inspection: false
Inspection Note:
Officer: PPCB056
Reject: false
Reject Note:
Role: ZO EE Pardeep Balu