Show ApplicationProcessingDetails

Id: 25224152
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-03-21 15:40:16.431
File Note: 1. The industry has installed barrels for washing of nut bolts. The washed water is re-used in washing after passing through treatment setup provided by the industry which comprises of oil and grease trap, collection tank, reaction – cum settling tank followed by storage tank from which the water is re-used for washing purpose. 2. Now, the industry has proposed to set up hot dip galvanized zinc plant for Nut and Bolts. It has signed an agreement with CETP i.e. M/s JBR Technology Ltd. for lifting of effluent @ 8000 ltr/month, which will be generating from galvanizing process (i.e. surface cleaning with acid before galvanizing).
Inspection: false
Inspection Note:
Officer: PPCB134
Reject: false
Reject Note:
Role: RO AEE Rubal Goyal