Show ApplicationProcessingDetails

Id: 25263366
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-03-27 11:33:00.033
File Note: As discussed, the project proponent has proposed to install hotmix plant with dryer drum with gravity dust settling chamber, water scrubber as APCD, 02 no. Bitumen burners, batch-mix plant with dryer drum with bag filter, water scrubber as APCD, 01 no. Bitumen burners, RMC plant and 01 no. Mixture plant. and submitted feasibility report for installation of hot mix plant. The project proponent has proposed to install 03 no. D.G sets of capacity @ 380 KVA, 125 KVA and 25 KVA with canopies and adequate stack height. The project proponent has proposed to provide the septic tank for treatment of domestic effluent with provisions to discharged onto land for plantation area. If approved: 1. Consent to establish/NOC under the Water Act, 1974 and Air Act, 1981 may be granted to the project proponent for one year with suitable conditions and with special condition that: - a. The hot mix plant will comply with the zoning regulation and if the site falls under Non-Confirming zone when the Master Plan get notified then the hot mix plant will comply with the guidelines under Rules 79 of The Punjab Regional & Town Planning and Development Act, 1995. b. The industry shall submit approved building plans from the Director of Factories, Punjab, or Competent Persons approved by the Director of Factories u/s 3-A of the Factories Act, 1948. c. The industry shall not start the manufacturing process without obtaining valid fresh Consent to operator under the Water Act, 1974, and the Air Act,1981 from the Board. d. The industry shall comply with the provisions of PWRDA and shall obtain permission from PWRDA for the abstraction of groundwater if required. e. The industry shall install adequate air pollution control devices so as to contain all the suspended particulate matter within the permissible limits prescribed by the Board / MoEF&CC. Competency: SEE  
Inspection: false
Inspection Note:
Officer: PPCB070
Reject: false
Reject Note:
Role: ZO EE Samita