| File Note: |
It is intimated that the industry is a small scale red category unit. The industry has applied for fresh of consent to operate under Water Act, 1974 & Air Act, 1981 along with requisite documents. The industry has submitted approved building plan from architect approved by Director of Factories, Punjab. The industry has submitted electricity bill and undertaking as a proof of date of commissioning. The site of the industry falls in industrial zone as per the khasra number mentioned in gazzete notification. The industry has Rs. 18000/- vide UTR No. CBINI24074899257 dated 18.03.2024 (water), Rs. 22100/- vide UTR No. CBINI24074899159 dated 14.03.2024 (Rs. 18000/- (air), Rs. 3600/- as NOC regularization fees) against the fixed assets of Rs. 44.65/- which is adequate upto 30.06.2028
The site of industry was visited by the AEE/JEE of this office on 26.03.2024 and it was observed as under:-
1. The industry was in operation during visit and engaged in phosphating process on job basis.
2. The industry has signed agreement with M/s JBR Technology Pvt. Ltd., Focal Point, Phase-8 Ludhiana @ 2000 Ltr/M for the treatment & disposal of trade effluent generated from zinc plating process.
3. The industry has installed water meter at pipeline from where fresh water is consumed in process. The representative of the industry informed that they have started trial of the zinc plant only and the same shall be operationalized fully by next month. The industry was earlier running at industrial estate, Ludhiana which has now been shifted to the present location.
4. The industry has recently started its operation and is maintaining the record of fresh water consumed in process area and trade effluent lifted to CETP operator.
5. The industry is discharging only domestic effluent into sewer.
6. The industry has provided storage tank of capacity 2000 Ltr and approx. 200 Ltr of effluent was lying in storage tank as observed during the visit
7. Domestic effluent is being discharged into sewer.
8. The industry has installed one electric baking oven and one powder coating booth with adequate stack height and cyclone separator as APCD.
9. The industry has submitted building plan from architect approved by Director of Factory, Pb.
10. The industry has applied for fresh consent after depositing NOC regularization fee and the compliance to the conditions of the NOC is attached alongwith in annotated form. The compliance was verified during the visit and was found to be correct.
11. The industry is complying with the provisions under Water Act, 1974 & Air Act, 1981.
Keeping in view of above, it is recommended that consent to operate under Water Act, 1974 & Air Act, 1981 may be granted to the industry upto 30.06.2028 please.
|